首页 >标准规范

GB 50372-2006炼铁机械设备工程安装验收规范:英文

Code for Installation Acceptance of Metallurgical Machinery Ironmaking Equipment Engineering

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
收起

标准信息

  • 【发布单位】

    Ministry;of;Housing;and;Urban-Rural;Development;of;the;People's;Republic;of;China;General;Administration;of;Quality;Supervision,Inspection;and;Quarantine;of;the;Pepublic;of;China

  • 【主编单位】

    Shanghai;BAOYE;Group;Corporation;Limited

  • 【参编单位】

    China;First;Metallurgical;Group;Co.;,Ltd;BaoSteel;Construction;Quality;Supervision;Substation,Quality;Supervision;Station;of;Metallurgical;Engineering

  • 【主要起草人】

    Tang;Yan;Liu;Hongliang;Ding;Mingfu;Xu;Liqing;Song;Maoxiang;Chen;Ronglin;You;Tai;Jin;Hong

收起

中文目录

  • Announcement of Ministry of Construction of the People s Republic of China

  • Forward

  • 1 General Provisions

  • 2 Basic Provisions

  • 3 Equipment Foundation,Anchor Bolts and Padding Plate

    • 3.1 General Provisions

    • 3.2 Equipment Foundation

    • 3.3 Anchor Bolt

    • 3.4 Padding Plate

  • 4 Mobilization of Equipments and Materials

    • 4.1 General Provisions

    • 4.2 Equipments and Elements

    • 4.3 Raw Materials

  • 5 Process Structural Steelwork

    • 5.1 General Provisions

    • 5.2 Welding

    • 5.3 Connection of High-strength Bolts

    • 5.4 Fabrication of Frame,Corridors,Truss

    • 5.5 Fabrication of Large-diameter Coil-welded Steel Pipe

    • 5.6 Fabrication of Shell

    • 5.7 Installation of Frame

    • 5.8 Installation of Corridors,Truss

    • 5.9 Installation of Shell

    • 5.10 Installation of Large-diameter coil-welded steel pipe

    • 5.11 Painting Works for Process Steel Structure

  • 6 Installation Engineering of Blast Furnace Body Equipment

    • 6.1 General Provisions

    • 6.2 Furnace Body Cooling Equipment

    • 6.3 Tuyere Device

    • 6.4 Slag hole Device and taphole sleeve

    • 6.5 Gas Sampling Device

    • 6.6 Commissioning of Gas Sampling Device

    • 6.7 Throat Steel Brick

    • 6.8 Furnace Top Guard Shield

  • 7 Installation Engineering of Blast Furnace Bell-less Top Equipment

    • 7.1 General Provisions

    • 7.2 Transmission Gear Box with Distribution Chute

    • 7.3 Bellows

    • 7.4 Valve Box

    • 7.5 Charging Bucket

    • 7.6 Receiving Hopper

    • 7.7 Commissioning of Bell-less Charging Equipment

    • 7.8 Vertical Detecting Device

    • 7.9 Commissioning of Vertical Detecting Device

    • 7.10 Blow-off valve,Equalizer valve on top

    • 7.11 Commissioning of Blow-off Valve,Equalizing Valve

    • 7.12 Top Ignition Device

    • 7.13 Commissioning of Top Ignition Device

    • 7.14 Throat spray device

    • 7.15 Throat Temperature Measuring Device

  • 8 Installation Engineering of Feeding Equipment

    • 8.1 General Provisions

    • 8.2 Electric Belt Discharging Car

    • 8.3 Commissioning of Electric Belt Discharging Car

    • 8.4 Weighing Hopper

    • 8.5 Commissioning of Weighing Hopper

    • 8.6 Coke Cutter

    • 8.7 Commissioning of Coke Cutter

  • 9 Installation Engineering of Charging Equipment

    • 9.1 General Provisions

    • 9.2 Skip Charging Equipment

    • 9.3 Commissioning of Skip Charging Equipment

    • 9.4 Belt Charging Equipment

    • 9.5 Commissioning of Belt Charging Equipment

  • 10 Installation Engineering of Tuyere Platform and Cast House Equipment

    • 10.1 General Provisions

    • 10.2 Hydraulic Clay Gun

    • 10.3 Commissioning of Hydraulic Clay Gun

    • 10.4 Taphole Machine

    • 10.5 Commissioning of Taphole Machine

    • 10.6 Slag Stopper

    • 10.7 Commissioning of Slag Stopper

    • 10.8 Slag,Iron Chute and Gate

    • 10.9 Swinging Iron Nozzle

    • 10.10 Commissioning of Swinging Iron Nozzle

    • 10.11 Main Chute Cover Carriage

    • 10.12 Commissioning of Main Chute Cover Carriage

  • 11 Installation Engineering of Hot-blast stove Equipment

    • 11.1 General Provisions

    • 11.2 Snout and Supports

    • 11.3 Sleeve-type Burner and Combustion Air Fan

    • 11.4 Commissioning of Combustion Air Fan

    • 11.5 Valves of Hot-blast Stove

    • 11.6 Commissioning of Hot-blast Stove Valve

  • 12 Installation Engineering of Blast Furnace Air-blowing Equipment

    • 12.1 General Provisions

    • 12.2 Axial Blower

    • 12.3 Commissioning of Axial Blower

    • 12.4 Air Filter

    • 12.5 Overall No-load Commissioning of Air Filter

    • 12.6 Dehumidifier

    • 12.7 Valve

    • 12.8 Commissioning of Valve

  • 13 Installation Engineering of Gas Purification Equipment

    • 13.1 General Provisions

    • 13.2 Gas Shut-Off Valves of Dust Remover

    • 13.3 Commissioning of Gas Shut-off Valves of Dust Remover

    • 13.4 Ash Valve of Dust Collector and Gas Ash Mixer

    • 13.5 Commissioning of Ash Valve of Dust Collector and Gas Ash Mixer

    • 13.6 Valve Group for Gas Pressure Regulating

    • 13.7 Commissioning of Gas Pressure-regulating Valve Unit

    • 13.8 Pressure-regulating Device of Circumferential Weld Scrubber

    • 13.9 Commissioning of Pressure-regulating Device of Circumferential Weld Scrubber

    • 13.10 Gas Blow-off Valve

    • 13.11 Commissioning of Gas Blow-off Valve

    • 13.12 Horizontal Silencer

    • 13.13 Blade-type Inserter

  • 14 Installation Engineering of Blast Furnace Pulverized Coal Injection(PCI)Equipment

    • 14.1 General Provisions

    • 14.2 Bin-type Pump

    • 14.3 Raw-coal Bin and Pulverized Coal Tank

    • 14.4 Pulverized Coal Collector

    • 14.5 Injection System

  • 15 Installation Engineering of Slag Treatment Equipment

    • 15.1 General Provisions

    • 15.2 Blowing Box and Water Slag Tank

    • 15.3 Rotary-drum Slag Granulation Equipment

    • 15.4 Commissioning of Rotary-drum Slag Granulation Filter Equipment

    • 15.5 Impact Baffle

  • 16 Installation Engineering of Iron Treatment Equipment

    • 16.1 General Provisions

    • 16.2 Iron Casting Machine

    • 16.3 Commissioning of Iron Casting Machine

    • 16.4 Floor-type Tip-over Windlass

    • 16.5 Commissioning of Floor-type Tip-over Windlass

    • 16.6 Front Column

    • 16.7 Plate-type Rotary Unloader

    • 16.8 Commissioning of Plate-type Rotary Unloader

  • 17 Installation Engineering of Milling Equipment

    • 17.1 General Provisions

    • 17.2 2-stage Vibrating Coke Crusher

    • 17.3 Commissioning of 2-stage Vibrating Coke Crusher

    • 17.4 Clay Mill

    • 17.5 Commissioning of Clay Mill

    • 17.6 Shaper

    • 17.7 Commissioning of Shaper

  • 18 Installation Engineering of Water Treatment Equipment

    • 18.1 General Provisions

    • 18.2 Top Trolley of Sedimentation Tank

    • 18.3 Commissioning of Top Trolley of Sedimentation Tank

    • 18.4 Float-type Oil Collector of Sedimentation Tank

    • 18.5 Commissioning of Float-type Oil Collector of Sedimentation Tank

    • 18.6 Horizontal Plate-and-frame Filter Press

    • 18.7 Commissioning of Horizontal Plate-and-frame Filter Press

    • 18.8 Pressure-type Cylinder-shaped Filter

    • 18.9 Ion-exchange Resin Tower

    • 18.10 Top Fan on Cooling Tower

    • 18.11 Commissioning of Top Fan on Cooling Tower

    • 18.12 Metal Tank

    • 18.13 Vertical Mixer

    • 18.14 Commissioning of Vertical Mixer

  • 19 Overall Leakage Test for Blast Furnace System

    • 19.1 General Provisions

    • 19.2 Overall Leakage Test for Blast Furnace System

  • Appendix A Quality Record Sheet for Sub-divisional Works of Installation Acceptance of Metallurgical Machinery Ironmaking Equipment Engineering

  • Appendix B Quality Acceptance Record Sheet for Divisional Works of Installation for Metallurgical Machinery Ironmaking Equipment Engineering

  • Appendix C Quality Acceptance Record Sheet for Unit Works of Installation for Metallurgical Machinery Ironmaking Equipment Engineering

  • Appendix D No-load Commissioning Record of Metallurgical Machinery Ironmaking Equipment Engineering

  • Appendix E Pressure Test for Pressure-holding Equipment

  • Appendix F Sealing Requirements between valve petal and Valve Seat for Blow-off Valve,Equalizing Valve,Hot-blast stove Shut-off Valve,Gas Shut-off Valve and Ash Valve of Dust Collector

  • Explanation of Wording in This Code

收起

英文目录

收起

本书术语

术语 英文名称 术语 英文名称

确定