首页 >标准规范

Code of construction and quality acceptance of industrial cleanroom

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
  • 公告
收起

标准信息

  • 【主编部门】
    中华人民共和国工业和信息化部
  • 【批准部门】

  • 【发布单位】

  • 【主编单位】

  • 【参编单位】

  • 【主要起草人】

  • 【主要审查人】

    广耀

收起

中文目录

  • 819

  •   

  • 1   

  • 2 

    • 2.1   

    • 2.2 

  • 3 

  • 4 

    • 4.1 

    • 4.2 

    • 4.3 

    • 4.4 

    • 4.5 

    • 4.6 

    • 4.7 

  • 5 

    • 5.1 

    • 5.2 

    • 5.3 

    • 5.4 

    • 5.5 

  • 6 

    • 6.1 

    • 6.2 

    • 6.3 

    • 6.4 

    • 6.5 

  • 7 

    • 7.1 

    • 7.2 

    • 7.3 

    • 7.4 BA/EP

    • 7.5 PP/PE

    • 7.6 PVDF

    • 7.7 PVC

    • 7.8 

  • 8 

    • 8.1 

    • 8.2 线

    • 8.3 

  • 9 

    • 9.1 

    • 9.2 线

    • 9.3 

    • 9.4 

  • 10 

    • 10.1 

    • 10.2 

  • 11 

    • 11.1 

    • 11.2 

  • 12 

    • 12.1 

    • 12.2 

    • 12.3 

    • 12.4 

  • 13 

    • 13.1 

    • 13.2 

    • 13.3 线

  • 14   

    • 14.1 

    • 14.2 

    • 14.3 

    • 14.4 

    • 14.5 使

  • A 

  • B 

  • C 

    • C.1 

    • C.2 

    • C.3 

    • C.4 

    • C.5 

    • C.6 

    • C.7 湿

    • C.8 

    • C.9 

    • C.10 

    • C.11 

    • C.12 

    • C.13 

    • C.14 

    • C.15 

    • C.16 

  • D 

收起

英文目录

  • 1 General provisions

  • 2 Terms and abbreviations

    • 2.1 Terms

    • 2.2 Abbreviations

  • 3 Basic requirements

  • 4 Building finishing and decoration

    • 4.1 General requirements

    • 4.2 Finishing of walls,columns and ceilings

    • 4.3 Flooring

    • 4.4 Raised floor

    • 4.5 Suspended ceiling

    • 4.6 Wall

    • 4.7 Doors and windows

  • 5 Air-purification and air-conditioning systems

    • 5.1 General Requirements

    • 5.2 Air-ducts and components

    • 5.3 Installation of air-ducting system

    • 5.4 Installation of air-purification and air-conditioning units

    • 5.5 Final system adjustment

  • 6 Exhaust and waste gas treatment

    • 6.1 General requirements

    • 6.2 Duct accessories

    • 6.3 Installation of exhaust and waste gas treatment units

    • 6.4 Exhaust gas treatment equipment and installation

    • 6.5 Final system adjustment

  • 7 Pipework

    • 7.1 General requirements

    • 7.2 Installation of carbon steel piping

    • 7.3 Installation of ordinary S.S.piping

    • 7.4 Installation of BA/EP S.S.piping

    • 7.5 Installation of PP/PE piping

    • 7.6 Installation of PVDF piping

    • 7.7 Installation of PC piping

    • 7.8 Pipework installation and testing

  • 8 Installation of fire protection and safety facilities

    • 8.1 General requirements

    • 8.2 Installation of piping

    • 8.3 Installation of fire prevention and safety units

  • 9 Installation of electrical facilities

    • 9.1 General requirements

    • 9.2 Installation of electrical lines

    • 9.3 Installation of electrical units

    • 9.4 Installation of against lightning and grounding units

  • 10 Construction of micro-vibration control facilities

    • 10.1 General requirements

    • 10.2 Construction of micro-vibration control facilities

  • 11 Installation of noise control units

    • 11.1 General requirements

    • 11.2 Installation of noise control units

  • 12 Installation of special facilities

    • 12.1 General requirements

    • 12.2 Installation of high-pure gases and special gases supply facilities

    • 12.3 Installation of pure water supply facilities

    • 12.4 Installation of chemicals supply facilities

  • 13 Installation of process equipment

    • 13.1 General requirements

    • 13.2 Installation of process equipment

    • 13.3 Secondary pipeling

  • 14 Project acceptance check

    • 14.1 General requirements

    • 14.2 Industrial cleanroom testing

    • 14.3 Construction approval

    • 14.4 Functions approval

    • 14.5 Operations approval

  • Appendix A Overall procedures for industrial cleanroom construction

  • Appendix B Selection and implementation order of testitems

  • Appendix C Testing methods

  • Appendix D Forms for recording project quality acceptance check

  • Explanation of wording in this code

  • List of quoted standards

收起

公告

<div><h2>819</h2><div class="text-info">4-40-00</div><div>GB 511102015201621<a data-anchorid="4.5.6">4.5.6</a><a data-anchorid="5.3.4">5.3.46</a><a data-anchorid="5.4.9">5.4.923</a><a data-anchorid="6.2.5">6.2.51</a><a data-anchorid="6.2.9">6.2.9</a><a data-anchorid="6.2.10">6.2.10</a><a data-anchorid="6.3.4">6.3.4</a><a data-anchorid="6.3.5">6.3.5</a><a data-anchorid="6.3.6">6.3.6</a><a data-anchorid="7.1.3">7.1.3</a><a data-anchorid="7.1.5">7.1.5</a><a data-anchorid="7.3.1">7.3.1</a><a data-anchorid="7.7.3">7.7.3</a><a data-anchorid="7.8.2">7.8.212</a><a data-anchorid="9.4.4">9.4.412</a></div><div></div><div class="align-right"><span class="bold"></span></div><div class="align-right"><span class="bold">2015511</span></div></div>
收起

本书术语

术语 英文名称 术语 英文名称
industrial cleanroom classification
air system leakage ratio air leak cheek with lighting
special gas chemical
piping 线 radiographic examination

确定

功能项目 注册用户 普通会员 高级会员/企业版
计划版标准阅读 仅限国标条文 库内全部标准 库内全部标准
标准关联查询
强制性条文聚合
标准资源对比
术语查询
知识库管理
服务资讯查看
原版标准阅读
条文说明阅读
标准文字复制(200字/次) 100次/月 不限
标准追踪
行业定制
实用表格下载(仅PC端)
电子书与视频
专家解读视频 免费视频 免费视频 全部视频