点击右上角 ··· 选择
【发送给好友】或【分享到朋友圈】
GB 51005-2014 水泥工厂余热发电工程施工与质量验收规范 - 工标库

GB 51005-2014 水泥工厂余热发电工程施工与质量验收规范 现行

发布日期:2014-06-23

实施日期:2015-04-01

  • 标准信息
  • 中文目录

中文目录

  • Announcement of Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • Foreword

  • 1 General Provisions

  • 2 Terms

  • 3 Basic Requirements

    • 3.1 Construction Basis

    • 3.2 Construction Preparation

    • 3.3 Construction Procedure

    • 3.4 Construction Safety

    • 3.5 Environmental Protection

    • 3.6 Project Acceptance

  • 4 Waste Heat Boiler

    • 4.1 General Requirements

    • 4.2 Boiler Steel Frame and Related Accessories

    • 4.3 Pressure Parts

    • 4.4 Auxiliary Pipeline and Equipment

    • 4.5 Boiler Drying,Boiling Out,Purging and Tightness Test

    • 4.6 Project Acceptance

  • 5 Gas Duct and Related Equipment

    • 5.1 General Requirements

    • 5.2 Assembly and Installation of Gas Duct

    • 5.3 Installation of Dust Separator

    • 5.4 Installation of Gas Damper

    • 5.5 Installation of Dust Collection System

    • 5.6 Installation of Expansion Joint of Gas Duct

    • 5.7 Project Acceptance

  • 6 Steam Turbine and Generator Set

    • 6.1 General Requirements

    • 6.2 Steam Turbine and Generator Set

    • 6.3 Generator and Exciter

    • 6.4 Governing Protection System and Oil System

    • 6.5 Pipeline of steam turbine proper

    • 6.6 Auxiliary equipment

    • 6.7 Individual Test of the Accessories and Auxiliary of Steam Turbine Generator Set

    • 6.8 Project acceptance

  • 7 Pipeline

    • 7.1 General Requirements

    • 7.2 On-site Quality Inspection and Acceptance of Pipeline Components

    • 7.3 Preparation of Pipeline and Components

    • 7.4 Pipeline Installation

    • 7.5 Test and Flushing for the Pipeline System

    • 7.6 Project Acceptance

  • 8 Welding

    • 8.1 General Requirements

    • 8.2 Steel,Welding Materials and Equipment

    • 8.3 Preparation before Welding

    • 8.4 Welding Procedure

    • 8.5 Heat Treatment After Welding

    • 8.6 Project Acceptance

  • 9 Thermodynamic Instruments and Automation Control Devices

    • 9.1 General Requirements

    • 9.2 Installation of Source Component and Sensitive Elements

    • 9.3 Installation of Local Instrument

    • 9.4 Control Panel(Console,Box,Cabinet)Installation

    • 9.5 Pipeline Laying and Connection

    • 9.6 Protection and Grounding

    • 9.7 Debugging of Thermodynamic and Automatic Instruments and Control Devices

    • 9.8 Project Acceptance

  • 10 Electrical Equipment and System

    • 10.1 General Requirements

    • 10.2 Installation of Cable Tray

    • 10.3 Cable Laying

    • 10.4 Complete Set of HV Switch Cabinet

    • 10.5 Complete Set of LV Switch Cabinet

    • 10.6 Generator

    • 10.7 Transformer

    • 10.8 Motor

    • 10.9 Bus Device

    • 10.10 Electrical Secondary Circuit Connection

    • 10.11 DC System Devices

    • 10.12 Relay Protection,Electrical Measurement and Automatic Device

    • 10.13 Grounding System

    • 10.14 Project Acceptance

  • 11 Water Treatment

    • 11.1 General Requirements

    • 11.2 Reverse Osmosis Device

    • 11.3 Boiler Make-up Water Treatment

    • 11.4 Sampling and Dosing System

    • 11.5 Circulating Cooling Water Treatment

    • 11.6 Tank

    • 11.7 Rotating Machinery

    • 11.8 Special Pipe and Valves

    • 11.9 Anticorrosion Works

    • 11.10 Startup and Commissioning

    • 11.11 Chemical Supervision in Trial Operation of the Rmal Equipment

    • 11.12 Project Acceptance

  • 12 Construction Works

    • 12.1 General Requirements

    • 12.2 Foundation

    • 12.3 Concrete Structure

    • 12.4 Steel Structure

    • 12.5 Equipment Foundation and Underground Channel

    • 12.6 Construction measurement and Settlement Observation

    • 12.7 Building Facilities

    • 12.8 Project Acceptance

  • 13 Heat-insulation and Paint

    • 13.1 General Requirements

    • 13.2 Heat-insulation of Equipment

    • 13.3 Heat-insulation of Pipeline

    • 13.4 Paint and Coatings

    • 13.5 Project Acceptance

  • 14 Commissioning and Acceptance of the Entire System

    • 14.1 General Requirements

    • 14.2 Subsection Commissioning

    • 14.3 Startup of the Entire System

    • 14.4 Completion Acceptance

  • Appendix A Construction Quality Acceptance Table of Waste Heat Power Generation Project

  • Appendix B Check list for Conditions of Subsystem Commissioning

  • Appendix C Signing Table of Equipment and System Custody

  • Appendix D Quality Acceptance Table of Subsystem Trial Operation

  • Appendix E Check List for Conditions of the Entire System Trial Operation

  • Appendix F Handover Certificate for Acceptance of Unit Start-up

  • Appendix G Quality Evaluation Table of the Entire System Trial Operation

  • Explanation of Wording in This Code

  • List of Quoted Standards

英文目录

本书术语

术语 英文名称

首页 |关于我们 |联系我们 |帮助中心

主办:中国发展改革出版社 版权所有 侵权必究 合作共建单位:中国工程建设标准化协会 京ICP备05021380号-5 ICP 许可证编号 : 京B2-20262562
新建收藏夹

选择收藏夹

收藏夹名称