点击右上角 ··· 选择
【发送给好友】或【分享到朋友圈】
GB 50397-2007 GB 50397-2007冶金电气设备工程安装验收规范:英文 - 工标库

GB 50397-2007 GB 50397-2007冶金电气设备工程安装验收规范:英文 现行

发布日期:2007-04-06

实施日期:2007-10-01

  • 标准信息
  • 中文目录

中文目录

  • Announcement of the Ministry of Construction of the People s Republic of China

  • Foreword

  • 1 General Provisions

  • 2 Basic Requirements

    • 2.1 General Requirements

    • 2.2 Inspection of Main Equipment and Materials

    • 2.3 Division of Construction Quality Acceptance for Electrical Equipment Installation Engineering in Metallurgy

    • 2.4 Quality Acceptance of Electrical Equipment Installation Engineering in Metallurgy

    • 2.5 Procedure and Organization for Construction Quality Acceptance of Electrical Equipment Installation Engineering in Metallurgy

    • 2.6 Documents for Completion Acceptance of Works

  • 3 Installation of High-Voltage Electrical Equipment

    • 3.1 Dominant Items

    • 3.2 General Items

  • 4 Installation of Power Transformer

    • 4.1 Dominant Items

    • 4.2 General Items

  • 5 Installation of Instrument Transformer,Reactor,Lightning Arrester and Capacitor

    • 5.1 Dominant Items

    • 5.2 General Items

  • 6 Installation of Electrical Rotating Motor

    • 6.1 Dominant Items

    • 6.2 General Items

  • 7 Installation of Distribution Panel and Switch Cabinet

    • 7.1 Dominant Items

    • 7.2 General Items

  • 8 Installation of Storage Battery

    • 8.1 Dominant Items

    • 8.2 General Items

  • 9 Installation of Low-Voltage Apparatus

    • 9.1 Dominant Items

    • 9.2 General Items

  • 10 Installation of Electrical Equipment for Crane

    • 10.1 Dominant Items

    • 10.2 General Items

  • 11 Installation of Trolley Line and Traveling Flexible Cable

    • 11.1 Dominant Items

    • 11.2 General Items

  • 12 Installation of Busbar Device

    • 12.1 Dominant Items

    • 12.2 General Items

  • 13 Cable Line

    • 13.1 Dominant Items

    • 13.2 General Items

  • 14 Laying of Lines in Open Pit Mine

    • 14.1 Dominant Items

    • 14.2 General Items

  • 15 Laying of Cables in Underground Mine

    • 15.1 Dominant Items

    • 15.2 General Items

  • 16 Installation of Cable Bearer and Tray

    • 16.1 Dominant Items

    • 16.2 General Items

  • 17 Preparation of Cable Terminal and Joint

    • 17.1 Dominant Items

    • 17.2 General Items

  • 18 Installation of Overhead Line and Pole-Mounted Electrical Equipment

    • 18.1 Dominant Items

    • 18.2 General Items

  • 19 Installation of Traction Network

    • 19.1 Dominant Items

    • 19.2 General Items

  • 20 Piping and Wiring

    • 20.1 Dominant Items

    • 20.2 General Items

  • 21 Installation of Electrical Lighting Equipment

    • 21.1 Dominant Items

    • 21.2 General Items

  • 22 Installation of Lighting Fixture and Distribution Box in Mine

    • 22.1 Dominant Items

    • 22.2 General Items

  • 23 Installation of Lightning Rod (Conduction) and Grounding Device

    • 23.1 Dominant Items

    • 23.2 General Items

  • 24 Laying of Electrical Lines in Explosive Gas Atmospheres

    • 24.1 Dominant Items

    • 24.2 General Items

  • 25 Installation of Electrical Equipment in Explosive Gas Atmospheres

    • 25.1 Dominant Items

    • 25.2 General Items

  • 26 Installation of Electrical Equipment in Fire Hazardous Area

    • 26.1 Dominant Items

    • 26.2 General Items

  • Appendix A Construction Site Quality Inspection and Acceptance Record

  • Appendix B Standard for Material and Electrolyte of Storage Battery

  • Appendix C Rectangular Busbar Lapping Requirements

  • Appendix D Safe Net Distance for Power Distribution Unit

  • Appendix E Minimum Clearance Between Buried Cables Where Cables Are Parallel With and Cross Pipes,Roads and Buildings

  • Appendix F Zoning of Explosion and Fire Hazardous Areas

  • Explanation of Wording in This Code

英文目录

本书术语

术语 英文名称

首页 |关于我们 |联系我们 |帮助中心

主办:中国发展改革出版社 版权所有 侵权必究 合作共建单位:中国工程建设标准化协会 京ICP备05021380号-5 ICP 许可证编号 : 京B2-20262562
新建收藏夹

选择收藏夹

收藏夹名称