点击右上角 ··· 选择
【发送给好友】或【分享到朋友圈】
DL/T 5235-2010 DL/T 5235-2010±800KV及以下直流架空输电线路工程施工及验收规程 - 工标库

DL/T 5235-2010 DL/T 5235-2010±800KV及以下直流架空输电线路工程施工及验收规程 现行

发布日期:2010-03-24

实施日期:2010-10-01

  • 标准信息
  • 中文目录

中文目录

  • Foreword

  • 1 Scope

  • 2 Normative References

  • 3 Inspection of Raw Material and Equipment

  • 4 Survey

  • 5 Earthwork

  • 6 Foundation

    • 6.1 General Provisions

    • 6.2 Cast-in-site(CIS)Foundation

    • 6.3 Cast-in-drilled-hole(CIDH)Pile Foundation

    • 6.4 Rock Foundation

    • 6.5 Winter Construction

  • 7 Tower

    • 7.1 General Provisions

    • 7.2 Steel Towers

  • 8 Installation of Overhead Conductors and Ground Wires

    • 8.1 General Provisions

    • 8.2 Tension Stringing

    • 8.3 Connection

    • 8.4 Wire Tightening

    • 8.5 Installation of Accessories

    • 8.6 Installation of Optical Fiber Composite Overhead Ground Wires(OPGW)

  • 9 Grounding

  • 10 Acceptance and Transfer

    • 10.1 Acceptance

    • 10.2 Test on Completion

    • 10.3 Transfer of Documents

    • 10.4 Project Transfer After Completion

英文目录

本书术语

术语 英文名称

首页 |关于我们 |联系我们 |帮助中心

主办:中国发展改革出版社 版权所有 侵权必究 合作共建单位:中国工程建设标准化协会 京ICP备05021380号-5
新建收藏夹

选择收藏夹

收藏夹名称