点击右上角 ··· 选择
【发送给好友】或【分享到朋友圈】
GB 50742-2012 GB 50742-2012炼钢机械设备安装规范:英文 - 工标库

GB 50742-2012 GB 50742-2012炼钢机械设备安装规范:英文 现行

发布日期:2012-01-21

实施日期:2012-08-01

  • 标准信息
  • 中文目录

中文目录

  • Announcement of the Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • Foreword

  • 1 General Provisions

  • 2 Basic Requirements

  • 3 Equipment Foundation,Foundation Bolt and Base Plate

    • 3.1 Hand-over and Acceptance of Equipment Foundation

    • 3.2 Base Line and Base Mark for Equipment Installation

    • 3.3 Foundation Bolt

    • 3.4 Base Plate

  • 4 Equipment and Material Mobilization

    • 4.1 Equipment Mobilization

    • 4.2 Material Mobilization

  • 5 Converter Installation

    • 5.1 Trunnion Bearing Pedestal and Trunnion Bearing

    • 5.2 Backing Ring

    • 5.3 Furnace Body

    • 5.4 Tilting Device

    • 5.5 Removable Guard Board and Fixed Guard Board

  • 6 Installation of Oxygen Lance and Sublance

    • 6.1 Oxygen Lance

    • 6.2 Sublance

    • 6.3 Nitrogen Sealing Device

    • 6.4 Probe Mounting Machine and Pulling Machine for Sublance

  • 7 Installation of Hood

    • 7.1 Skirt of Hood

    • 7.2 Removable Hood

  • 8 Installation of Waste Heat Boiler

    • 8.1 General Requirements

    • 8.2 Flue

    • 8.3 Boiler Barrel

    • 8.4 Piping for Steam and Water Systems

    • 8.5 Heat Accumulator

    • 8.6 Deoxidization Water Tank

  • 9 Installation of Electric Arc Furnace

    • 9.1 Rail Chair

    • 9.2 Tilting Device

    • 9.3 Tilting Locking Device

    • 9.4 Cradle

    • 9.5 Furnace Body

    • 9.6 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism

    • 9.7 Electrode Lifting Mechanism and Electrode Clamping Mechanism

    • 9.8 Oxygen Lance

  • 10 Installation of Ladle Refining Furnace

    • 10.1 Track for Buggy Ladle

    • 10.2 Buggy Ladle

    • 10.3 Furnace Cover Cradle,Furnace Cover and Furnace Cover Lifting Mechanism

    • 10.4 Electrode Lifting Mechanism and Electrode Clamping Mechanism

  • 11 Installation of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter

    • 11.1 General Requirements

    • 11.2 Vacuum Tank

    • 11.3 Vacuum Tank Cap and Tank Cap Lifting Mechanism

    • 11.4 Vacuum Device

    • 11.5 Oxygen Lance

  • 12 Installation of Recirculation Vacuum Degassing Refining Furnace

    • 12.1 General Requirements

    • 12.2 Vacuum Degassing Chamber Car and Degassing Chamber

    • 12.3 Ladle Lifting Device

    • 12.4 Preheating Device for Vacuum Degassing Chamber

    • 12.5 Oxygen Lance

  • 13 Installation of Casting Equipment

    • 13.1 Ladle Turret

    • 13.2 Tundish Car and Track

    • 13.3 Roaster

  • 14 Installation of Continuous Steel-casting Equipment

    • 14.1 Mold and Vibrating Device

    • 14.2 Secondary Cooling Device

    • 14.3 Exchange Device for Segment

    • 14.4 Withdrawal and Straightening Unit

    • 14.5 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device

    • 14.6 Flame Cutting Machine

    • 14.7 Rocking Shear

    • 14.8 Crop Collecting Device

    • 14.9 Burring Machine

  • 15 Installation of Discharging and Finishing Equipment

    • 15.1 Run-out Roller Table

    • 15.2 Turntable

    • 15.3 Pusher,Puller and Tilter

    • 15.4 Scarfer

    • 15.5 Lifting Guard Board and Marking Punch

    • 15.6 Cross Travelling Trolley

    • 15.7 Centering Device

  • 16 Installation of Hot Metal Mixer

    • 16.1 Base and Roller

    • 16.2 Furnace Shell

    • 16.3 Tilting Device

    • 16.4 Cover Manipulator

  • 17 Installation of Hot Metal Pretreatment Equipment

    • 17.1 Desulfurizer(Dephosphorizer)Conveying Device

    • 17.2 Stirring Desulfurization Equipment

    • 17.3 Injection Dephosphorization Equipment

    • 17.4 Molten Iron Tank Car and Track

    • 17.5 Slag Remover

  • 18 Test Run of Steel-making Mechanical Equipment

    • 18.1 General Requirements

    • 18.2 Test Run of Converter

    • 18.3 Test Run of Oxygen Lance and Sublance

    • 18.4 Test Run of Hood

    • 18.5 Test Run of Waste Heat Boiler System

    • 18.6 Test Run of Electric Arc Furnace

    • 18.7 Test Run of Ladle Refining Furnace

    • 18.8 Test Run of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter

    • 18.9 Test Run of Recirculation Vacuum Degassing Refining Furnace

    • 18.10 Test Run of Casting Equipment

    • 18.11 Test Run of Continuous Steel-casting Equipment

    • 18.12 Test Run of Discharging and Finishing Equipment

    • 18.13 Test Run of Hot Metal Mixer

    • 18.14 Test Run of Hot Metal Pretreatment Equipment

  • 19 Safety and Environmental Protection

  • Explanation of Wording in This Code

  • Normative Standard

英文目录

本书术语

术语 英文名称

首页 |关于我们 |联系我们 |帮助中心

主办:中国发展改革出版社 版权所有 侵权必究 合作共建单位:中国工程建设标准化协会 京ICP备05021380号-5 ICP 许可证编号 : 京B2-20262562
新建收藏夹

选择收藏夹

收藏夹名称