点击右上角 ··· 选择
【发送给好友】或【分享到朋友圈】
GB 50179-2015 河流流量测验规范:英文 - 工标库

GB 50179-2015 河流流量测验规范:英文 现行

发布日期:2015-08-27

实施日期:2016-05-01

替代以下标准: GB 50179-93  

  • 标准信息
  • 中文目录

中文目录

  • NOTICE

  • Introduction to English version

  • Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China

  • Foreword

  • 1 General provisions

  • 2 Selection of measuring reach and setting-up of cross-section

    • 2.1 Selection and survey of measuring reach

    • 2.2 Layout of measuring cross-section

  • 3 Cross-section measurement

    • 3.1 Possible maximum cross-section measurement

    • 3.2 Channel cross-section measurement

    • 3.3 Error sources and control

  • 4 Stage gradation and means and methods of discharge measurement

    • 4.1 General requirements

    • 4.2 Selection of measurement means

    • 4.3 Selection of measurement methods

    • 4.4 Gradation of stage(discharge)

    • 4.5 Measurement of high flood discharge

    • 4.6 Discharge measurement in dry period

    • 4.7 Discharge measurement in icy period

    • 4.8 Tidal discharge measurement

  • 5 Check and analysis of discharge measurement results

    • 5.1 Check items and methods

    • 5.2 Check and analysis

  • 6 Assessment of discharge measurement accuracy

    • 6.1 General requirements

    • 6.2 Error sources and control

    • 6.3 Assessment of discharge measurement accuracy

  • Appendix A Methods for accuracy classification of basic hydrometric stations

  • Appendix B Current meter method

    • B.1 General requirements

    • B.2 Layout of flow velocity-measuring verticals

    • B.3 Flow velocity measurement

    • B.4 Flow direction deflection angle measurement

    • B.5 Other observation

    • B.6 Check and maintenance of current meter

    • B.7 Calculation of measured discharge

    • B.8 Width measurement and sounding methods of cross-section

    • B.9 Correction method of deflection angle of suspension cable

    • B.10 Method of determining gauging cross-section direction

    • B.11 Error test and uncertainty estimation

    • B.12 Permissible error of discharge measurement and selection of discharge measurement scheme

  • Appendix C Float method

    • C.1 General requirements

    • C.2 Surface float method

    • C.3 Deep-water float method and float rod method

    • C.4 Small float method

    • C.5 Other observation

    • C.6 Test and determination of float coefficient

    • C.7 Measured discharge calculation

    • C.8 Uncertainty estimation

  • Appendix D Format of discharge measurement table and filling instructions

    • D.1 Table preparation

    • D.2 Filling instructions

  • Appendix E Table of deflection angle correction of suspension cable

  • Explanation of wording in this code

  • List of quoted standards

英文目录

本书术语

术语 英文名称

首页 |关于我们 |联系我们 |帮助中心

主办:中国发展改革出版社 版权所有 侵权必究 合作共建单位:中国工程建设标准化协会 京ICP备05021380号-5 ICP 许可证编号 : 京B2-20262562
新建收藏夹

选择收藏夹

收藏夹名称