点击右上角 ··· 选择
【发送给好友】或【分享到朋友圈】
GB 51049-2014 电气装置安装工程串联电容器补偿装置施工及验收规范 - 工标库

GB 51049-2014 电气装置安装工程串联电容器补偿装置施工及验收规范 现行

发布日期:2014-12-02

实施日期:2015-08-01

  • 标准信息
  • 中文目录

中文目录

  • Announcement of the Ministry of Housing and Urban-Rural Development of the Peoples Republic of China

  • Foreword

  • 1 General Provisions

  • 2 Terms

  • 3 Basic Requirements

  • 4 SC Platform

    • 4.1 Pre-Installation Inspection

    • 4.2 Installation and Adjustment of Insulators for SC Platform

    • 4.3 Assembling of SC Platform

    • 4.4 Hoisting and Adjustment of SC Platform

    • 4.5 Installation of SC Platform Accessories

  • 5 Electric Equipment Installation

    • 5.1 General Requirements

    • 5.2 Capacitor

    • 5.3 Metal-Oxide Varistor(MOV)

    • 5.4 Spark Gap(GAP)

    • 5.5 Damping Device

    • 5.6 Optical Fiber Column

    • 5.7 Current Transformer(CT),By-Pass Switch and Disconnector

    • 5.8 Control and Protection System

  • 6 Equipment Installation Specific to TCSC

    • 6.1 Thyristor-Controlled Reactor(TCR)

    • 6.2 Thyristor Valve Chamber

    • 6.3 Voltage Divider

    • 6.4 Water Cooling System

  • 7 Acceptance of SC Project

  • Explanation of Wording in This Code

  • List of Quoted Standards

英文目录

本书术语

术语 英文名称

首页 |关于我们 |联系我们 |帮助中心

主办:中国发展改革出版社 版权所有 侵权必究 合作共建单位:中国工程建设标准化协会 京ICP备05021380号-5 ICP 许可证编号 : 京B2-20262562
新建收藏夹

选择收藏夹

收藏夹名称