点击右上角 ··· 选择
【发送给好友】或【分享到朋友圈】
DL/T 5142-2012 DL/T 5142-2012 火力发电厂除灰设计技术规程:英文版 - 工标库

DL/T 5142-2012 DL/T 5142-2012 火力发电厂除灰设计技术规程:英文版 现行

发布日期:2012-08-23

实施日期:2021-12-01

  • 标准信息
  • 中文目录

中文目录

  • Introduction

  • 翻译出版说明

  • National Energy Administration Announcement

  • Foreword

  • 1 General Provisions

  • 2 Terms

  • 3 Pneumatic Ash Handling System

    • 3.1 Basic Requirements

    • 3.2 Pressure Pneumatic Conveying

    • 3.3 Vacuum Conveying

    • 3.4 Pneumatic Ash Conveying Pipes

    • 3.5 Air Slide

    • 3.6 Fly Ash Classifying System

  • 4 Hydraulic Ash Handling System

    • 4.1 Basic Requirements

    • 4.2 Water Supply System for Ash Handling

    • 4.3 Hydraulic Ejector

    • 4.4 Ash Slurry Trench

    • 4.5 Slurry Preparation Equipment

    • 4.6 Centrifugal Ash Slurry Pump

    • 4.7 Plunger Type Fly Ash Slurry Pump

    • 4.8 Dewatering Bin and Clarifying Equipment

    • 4.9 Bottom Ash Settlement Pond

    • 4.10 Hydraulic Ash Conveying Pipe

  • 5 Mechanical Ash Handling System

    • 5.1 Basic Requirements

    • 5.2 Air-cooled Slag Conveyor

    • 5.3 Submerged Scrapper Conveyor

    • 5.4 En-masse Scraper Conveyor

    • 5.5 Vertical Bucket Elevator

    • 5.6 Bucket Conveyor

  • 6 Mill Rejects Conveying System

    • 6.1 Basic Requirements

    • 6.2 Simple Mechanical Conveying

    • 6.3 Hydraulic Jet Pump Conveying

    • 6.4 Mechanical Conveying

  • 7 Air Supply System

    • 7.1 Basic Requirements

    • 7.2 Air Compressor and Treatment Facilities of Compressed Air

    • 7.3 Rotary Blower and Vacuum Pump

  • 8 Material Storage and Unloading System

    • 8.1 Basic Requirements

    • 8.2 Fly Ash Silo and Hopper

    • 8.3 Bottom Ash Silo and Mill Rejects Bin

    • 8.4 Unloading System and Equipment Selection

  • 9 Off-site Transportation System

    • 9.1 Basic Requirements

    • 9.2 Truck Transportation

    • 9.3 Belt Conveyor

    • 9.4 Ship Transportation

  • 10 Ash Handling System for CFB Boiler

    • 10.1 Basic Requirements

    • 10.2 Bottom Ash Handling System

    • 10.3 Limestone Powder Handling System

  • 11 Ash Handling System for Municiple Solid Waste Incineration Power Plant

    • 11.1 Basic Requirements

    • 11.2 Bottom Ash Handling System

    • 11.3 Fly Ash Handling System

  • 12 Ash Handling System for Straw Power Plant

    • 12.1 Basic Requirements

    • 12.2 Mechanical Ash Handling System

    • 12.3 Pneumatic Ash Handling System

    • 12.4 Ash Storage

  • 13 Slime Pipelines Conveying System

    • 13.1 Basic Requirements

    • 13.2 Piping Conveying System

    • 13.3 Equipment Selections

    • 13.4 Slime Pump House

  • 14 Design Requirements for Relevant Disciplines

    • 14.1 Mechanical Discipline

    • 14.2 I&C and Electrical Discipline

    • 14.3 Civil and Hydraulic Structure Disciplines

    • 14.4 Hydraulic and Water Treatment Disciplines

    • 14.5 Heating and Ventilation Disciplines

    • 14.6 General Plan Discipline

  • Appendix A Calculation of Ash Amount

  • Appendix B Calculation of Mill Rejects Amount

  • Appendix C Density of Some Materials

  • Appendix D Calculation of Reynolds Number

  • Explanation of Wording in this Code

  • List of Quoted Standards

英文目录

本书术语

术语 英文名称