水泥工厂余热发电工程施工与质量验收规范

Code for Construction and Acceptance of Waste Heat Power Generation in Cement Plant

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
收起

标准信息

  • 【主编部门】
    National Building Material Industry Standard Rating Station
  • 【批准部门】

    Ministry of Housing and Urban-Rural Development of People's Republic of China

  • 【发布单位】

    Ministry;of;Housing;and;Urban-Rural;Development;of;the;People's;Republic;of;China;General;Administration;of;Quality;Supervision,Inspection;and;Quarantine;of;the;People's;Republic;of;China

  • 【主编单位】

    Sinoma;Energy;Conservation;Ltd.;The;National;Building;Material;Industry;Standard;Rating;Station

  • 【参编单位】

    Nantong;Wanda;Boiler;Co.,Ltd.;Wuhan;Building;Material;Industry;Design;& Research;Institute;Co.,Ltd.;Sinoma;Cement;Co.,Ltd.;CITIC;Heavy;Industries;Co.,Ltd.;Zhejiang;Industrial;Equipment;Installation;Group;Co.,Ltd.;Henan;Installation;Group;Co.,Ltd.;Suunpower;Co.,Ltd.;Anhui;Conch;Group;Co.,Ltd.;Nanjing;Kisen;Environment;& Energy;Co.,Ltd.

  • 【主要起草人】

    Shi;Jinglin;Dong;Lanqi;Yu;Guangkun;Qu;Liangjun;Zhou;Shaozong;Zhu;Qiang;Lv;Yuezhao;Yuan;Ke;Lu;Zilong;Xu;Zheng;Ding;Bo;Wang;Junmei;Peng;Yan;Yang;Daozhou;Fei;Yanfeng;Huang;Kezheng;Lv;Guifeng;Gao;Xinyong;Han;Shaohua;Jiang;Peng;Liu;Meixia;Chen;Fengyin;Hou;Bincai;Chen;Dong;Wang;Liqun

  • 【主要审查人】

    Zeng;Xuemin;Li;Runlin;Du;Chongkai;Huang;Jiquan;He;Jiabin;Niu;Hailong;Chen;Youming;Li;Zhenxing;Li;Pengqing

收起

中文目录

  • Announcement of Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • Foreword

  • 1 General Provisions

  • 2 Terms

  • 3 Basic Requirements

    • 3.1 Construction Basis

    • 3.2 Construction Preparation

    • 3.3 Construction Procedure

    • 3.4 Construction Safety

    • 3.5 Environmental Protection

    • 3.6 Project Acceptance

  • 4 Waste Heat Boiler

    • 4.1 General Requirements

    • 4.2 Boiler Steel Frame and Related Accessories

    • 4.3 Pressure Parts

    • 4.4 Auxiliary Pipeline and Equipment

    • 4.5 Boiler Drying,Boiling Out,Purging and Tightness Test

    • 4.6 Project Acceptance

  • 5 Gas Duct and Related Equipment

    • 5.1 General Requirements

    • 5.2 Assembly and Installation of Gas Duct

    • 5.3 Installation of Dust Separator

    • 5.4 Installation of Gas Damper

    • 5.5 Installation of Dust Collection System

    • 5.6 Installation of Expansion Joint of Gas Duct

    • 5.7 Project Acceptance

  • 6 Steam Turbine and Generator Set

    • 6.1 General Requirements

    • 6.2 Steam Turbine and Generator Set

    • 6.3 Generator and Exciter

    • 6.4 Governing Protection System and Oil System

    • 6.5 Pipeline of steam turbine proper

    • 6.6 Auxiliary equipment

    • 6.7 Individual Test of the Accessories and Auxiliary of Steam Turbine Generator Set

    • 6.8 Project acceptance

  • 7 Pipeline

    • 7.1 General Requirements

    • 7.2 On-site Quality Inspection and Acceptance of Pipeline Components

    • 7.3 Preparation of Pipeline and Components

    • 7.4 Pipeline Installation

    • 7.5 Test and Flushing for the Pipeline System

    • 7.6 Project Acceptance

  • 8 Welding

    • 8.1 General Requirements

    • 8.2 Steel,Welding Materials and Equipment

    • 8.3 Preparation before Welding

    • 8.4 Welding Procedure

    • 8.5 Heat Treatment After Welding

    • 8.6 Project Acceptance

  • 9 Thermodynamic Instruments and Automation Control Devices

    • 9.1 General Requirements

    • 9.2 Installation of Source Component and Sensitive Elements

    • 9.3 Installation of Local Instrument

    • 9.4 Control Panel(Console,Box,Cabinet)Installation

    • 9.5 Pipeline Laying and Connection

    • 9.6 Protection and Grounding

    • 9.7 Debugging of Thermodynamic and Automatic Instruments and Control Devices

    • 9.8 Project Acceptance

  • 10 Electrical Equipment and System

    • 10.1 General Requirements

    • 10.2 Installation of Cable Tray

    • 10.3 Cable Laying

    • 10.4 Complete Set of HV Switch Cabinet

    • 10.5 Complete Set of LV Switch Cabinet

    • 10.6 Generator

    • 10.7 Transformer

    • 10.8 Motor

    • 10.9 Bus Device

    • 10.10 Electrical Secondary Circuit Connection

    • 10.11 DC System Devices

    • 10.12 Relay Protection,Electrical Measurement and Automatic Device

    • 10.13 Grounding System

    • 10.14 Project Acceptance

  • 11 Water Treatment

    • 11.1 General Requirements

    • 11.2 Reverse Osmosis Device

    • 11.3 Boiler Make-up Water Treatment

    • 11.4 Sampling and Dosing System

    • 11.5 Circulating Cooling Water Treatment

    • 11.6 Tank

    • 11.7 Rotating Machinery

    • 11.8 Special Pipe and Valves

    • 11.9 Anticorrosion Works

    • 11.10 Startup and Commissioning

    • 11.11 Chemical Supervision in Trial Operation of the Rmal Equipment

    • 11.12 Project Acceptance

  • 12 Construction Works

    • 12.1 General Requirements

    • 12.2 Foundation

    • 12.3 Concrete Structure

    • 12.4 Steel Structure

    • 12.5 Equipment Foundation and Underground Channel

    • 12.6 Construction measurement and Settlement Observation

    • 12.7 Building Facilities

    • 12.8 Project Acceptance

  • 13 Heat-insulation and Paint

    • 13.1 General Requirements

    • 13.2 Heat-insulation of Equipment

    • 13.3 Heat-insulation of Pipeline

    • 13.4 Paint and Coatings

    • 13.5 Project Acceptance

  • 14 Commissioning and Acceptance of the Entire System

    • 14.1 General Requirements

    • 14.2 Subsection Commissioning

    • 14.3 Startup of the Entire System

    • 14.4 Completion Acceptance

  • Appendix A Construction Quality Acceptance Table of Waste Heat Power Generation Project

  • Appendix B Check list for Conditions of Subsystem Commissioning

  • Appendix C Signing Table of Equipment and System Custody

  • Appendix D Quality Acceptance Table of Subsystem Trial Operation

  • Appendix E Check List for Conditions of the Entire System Trial Operation

  • Appendix F Handover Certificate for Acceptance of Unit Start-up

  • Appendix G Quality Evaluation Table of the Entire System Trial Operation

  • Explanation of Wording in This Code

  • List of Quoted Standards

收起

英文目录

收起

本书术语

术语 英文名称 术语 英文名称

确定

功能项目 注册用户 普通会员 高级会员/企业版
计划版标准阅读 仅限国标条文 库内全部标准 库内全部标准
标准关联查询
强制性条文聚合
标准资源对比
术语查询
知识库管理
服务资讯查看
原版标准阅读
条文说明阅读
标准文字复制(200字/次) 100次/月 不限
标准追踪
行业定制
实用表格下载(仅PC端)
电子书与视频
专家解读视频 免费视频 免费视频 全部视频