GB 50840-2012 GB 50840-2012矿浆管线施工及验收规范:英文 - 工标库
由工标库AI生成
查看更多
GB 50840-2012 GB 50840-2012矿浆管线施工及验收规范:英文现行
收藏
-
Announcement of Ministry of Housing and Urban-Rural Development of the People s Republic of China
-
Foreword
-
1 General Provisions
-
2 Terms
-
3 Basic Requirement
-
4 Surveying and ROW Clearance
-
4.1 General Provision
-
4.2 Surveying
-
4.3 Right-of-Way Clearance
-
5 Material and Pipeline Accessory Acceptance
-
5.1 General Provisions
-
5.2 Loading,Unloading and Transportation of Anticorrosion Pipe
-
5.3 Acceptance and storage
-
6 Stringing
-
7 Pipeline Trench
-
7.1 General Provision
-
7.2 Geometric Size of Pipeline Trench
-
7.3 Pipeline Trench Excavation
-
7.4 Pipeline Trench Accepetance
-
8 Pipeline Welding and Acceptance
-
8.1 General
-
8.2 Weather Conditions
-
8.3 Preparation for Welding
-
8.4 Alignment
-
8.5 Preheat Temperature and Interpass Temperature
-
8.6 Remove the Lineup Clamp
-
8.7 Welding
-
8.8 Repair and Removal of Defects
-
8.9 Tie-In Welding
-
8.10 Joint Identification
-
8.11 Acceptance Standards of Welds
-
9 Pipeline Lowering-In and Trench Backfilling
-
9.1 Pipeline Lowering-In
-
9.2 Pipeline Trench Backfilling
-
10 Anticorrosion,Repairing and Joint Coating of Pipeline
-
10.1 General Provision
-
10.2 Pipeline Anticorrosion
-
10.3 Repairing and Joint Coating for Anticorrosion Pipeline
-
11 Crossings
-
12 Pipeline Pigging,Gauging and Hydrotesting
-
12.1 General Provision
-
12.2 Pipeline Pigging and Gauging
-
12.3 Pipeline Hydrotest
-
13 Pipeline Auxiliary Engineering
-
13.1 Makers,Posts and Piles Burial
-
13.2 Erosion Protection
-
13.3 Cathodic Protection
-
14 Safety and Environment
-
15 Engineering Handover and Acceptance
-
Appendix A Qualification of Welding Procedures
-
A.1 General
-
A.2 V-notch Charpy Impact Toughness Test
-
A.3 Macro metallographic and hardness tests
-
A.4 Reinspection
-
Appendix B Inspection Record for Quality of Construction