DL/T 5095-2013 火电厂和核电厂常规岛主厂房荷载设计技术规程 - 工标库
由工标库AI生成
查看更多
DL/T 5095-2013 火电厂和核电厂常规岛主厂房荷载设计技术规程现行
收藏
-
Introduction
-
翻译出版说明
-
National Energy Administration Announcement
-
Foreword
-
1 General Provisions
-
2 Terms
-
3 Basic Requirements
-
3.1 Classification and Representative Value of Loads
-
3.2 Load Effect Combination
-
4 Loads of Equipment and Piping
-
4.1 General Requirements
-
4.2 Loads of Main Equipment
-
4.3 Pipe Loads
-
4.4 Dynamic Load of Equipment
-
4.5 Combination Value,Frequent Value and Quasi-permanent Value of Equipment and Pipe Loads
-
5 Live Loads on Roof and Floor(Ground)
-
6 Crane Load
-
7 Wind Loads
-
7.1 Characteristic Value of Wind Loads and Reference Wind Pressure
-
7.2 Exposure Factor for Wind Pressure
-
7.3 Shape Factor of Wind Load
-
7.4 Tornado Load
-
8 Snow Load
-
Appendix A Typical Load Specification for Supports of Deaerator
-
A.1 Arrangement of Deaerator Storage Tank Supports
-
A.2 Typical Form of Load Design Specification of Deaerator Storage Tank
-
Appendix B Typical Load Specification for Supports of Moisture Separator Reheater
-
B.1 Arrangement of Moisture Separator Reheater Supports
-
B.2 Typical Form of Load Design Specification of Moisture Separator Reheater
-
Appendix C Stipulations for Load Calculation of Cyclone Seperator
-
C.1 Engineering Design Parameters
-
C.2 Loads on Cyclone Collector Proper
-
C.3 Wind Loads on Cyclone Collector
-
C.4 Derivation of Loads on Column Base(Buttress)of Cyclone Collector Supports
-
Appendix D Typical Load Specification and Coding for Piping
-
D.1 General Requirements
-
D.2 Example of Pipe Load Design Specification
-
Explanation of Wording in this Code
-
List of Quoted Standards