GB/T 51307-2018 GB /T 51307-2018塔式太阳能光热发电站设计标准:英文现行
收藏
-
中华人民共和国住房和城乡建设部公告
-
Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
-
Foreword
-
1 General provisions
-
2 Terms
-
3 Basic requirements
-
4 Requirements of electric power system
-
4.1 General requirements
-
4.2 Technical requirements for the connection to the power system
-
4.3 Relay protection and automatic safety equipment
-
4.4 Dispatching automation system
-
4.5 System communication
-
4.6 Electric energy calculation
-
5 Solar resource assessment
-
5.1 General requirements
-
5.2 Reference weather station
-
5.3 Site observation station
-
5.4 Validation and analysis of solar radiation data
-
6 Site selection
-
7 Overall planning
-
7.1 General requirements
-
7.2 Off-site planning
-
7.3 On-site planning
-
8 Layout of solar field
-
8.1 General requirements
-
8.2 Layout of heliostat
-
8.3 Layout of receiver tower
-
8.4 Safety protection
-
8.5 Maintenance and overhaul facilities
-
9 Layout of power block
-
9.1 General requirements
-
9.2 Layout of thermal storage block
-
9.3 Layout of steam generator block
-
9.4 Layout of turbine room
-
9.5 Layout of auxiliary heating block
-
9.6 Layout of central control room
-
9.7 Maintenance and overhaul facilities
-
9.8 Complex facilities
-
10 Collector system and equipment
-
10.1 General requirements
-
10.2 Heliostat
-
10.3 Receiver
-
10.4 Heliostat cleaning device
-
11 Heat transfer,thermal storage and heat exchange system and equipment
-
11.1 General requirements
-
11.2 Heat transfer system and equipment
-
11.3 Thermal storage system and equipment
-
11.4 Heat exchange system and equipment
-
11.5 Auxiliary system and equipment
-
12 Steam turbine equipment and system
-
12.1 General requirements
-
12.2 Steam turbine equipment
-
12.3 Main steam,reheat steam and bypass system
-
12.4 Feedwater system and feedwater pumps
-
12.5 Deaerator and feedwater storage tank
-
12.6 Condensate system and condensed pumps
-
12.7 Draining and discharge system
-
12.8 Cooling water system of auxiliary equipment
-
12.9 Condenser and auxiliary facilities
-
13 Water treatment equipment and system
-
13.1 Water quality and water pretreatment
-
13.2 Water pre-desalination
-
13.3 Demineralized water treatment system
-
13.4 Condensate polishing system
-
13.5 Chemical dosing and water-steam sampling for thermal cycle system
-
13.6 Cooling water treatment
-
13.7 Heliostat cleaning water treatment
-
13.8 Waste water treatment
-
13.9 Chemicals storage
-
14 Information system
-
14.1 General requirements
-
14.2 Overall planning of plant information system
-
14.3 Management information system
-
14.4 Safety and protection system
-
14.5 Production video monitoring system
-
14.6 Video meeting system
-
14.7 Cabling of information system
-
14.8 Information security
-
15 Instrumentation and control
-
15.1 General requirements
-
15.2 Level of automation
-
15.3 Control mode and control room
-
15.4 Measurement and instrumentation
-
15.5 Alarming system
-
15.6 Protection system
-
15.7 On-off control
-
15.8 Modulating control
-
15.9 Control system
-
15.10 Control power supply
-
15.11 Instrument tube,cable and local equipment arrangement
-
16 Electrical equipment and system
-
16.1 Generator and main transformer
-
16.2 Main electrical connection
-
16.3 AC auxiliary power system
-
16.4 DC system and AC uninterruptible power supply
-
16.5 High voltage switchgear arrangement
-
16.6 Electrical monitoring and control
-
16.7 Electrical component relay protection
-
16.8 Lighting system
-
16.9 Grounding system
-
16.10 In-plant communication
-
16.11 Other facilities
-
17 Hydraulic facilities and system
-
17.1 General requirements
-
17.2 Water source and water management
-
17.3 Water supply system
-
17.4 Water intake building and structure
-
17.5 Piping and culvert
-
17.6 Wet cooling tower
-
17.7 Air cooling system
-
17.8 Water supply and water drainage
-
18 Auxiliary system and ancillary facilities
-
19 Buildings and structures
-
19.1 General requirements
-
19.2 Seismic design
-
19.3 Architectural design
-
19.4 Ground and foundation
-
19.5 Main building structure
-
19.6 Receiver tower structure
-
19.7 Other buildings and structures in plant
-
19.8 Hydraulic building and structure
-
20 Heating ventilation and air conditioning
-
20.1 General requirements
-
20.2 Steam generator building
-
20.3 Electrical building
-
20.4 Central control room
-
20.5 Chemical building
-
20.6 Other buildings
-
20.7 Heating system and piping network in plant
-
21 Environmental protection and water& soil conservation
-
21.1 General requirements
-
21.2 Pollution source control
-
21.3 Water and soil conservation
-
22 Occupational health and safety
-
22.1 General requirements
-
22.2 Occupational safety
-
22.3 Occupational health
-
23 Fire fighting
-
23.1 General requirements
-
23.2 Fire risk classifications,fire resistance classifications and fire compartment
-
23.3 Fire water supply,fire extinguishing facilities and automatic fire alarm
-
23.4 Power supply and emergency lighting for fire protection
-
Appendix A Estimation of electric output
-
Explanation of wording in this standard
-
List of quoted standards
-
Explanation of provisions
-
Preparation instructions