GB 50049-2011 小型火力发电厂设计规范 - 工标库
由工标库AI生成
查看更多
GB 50049-2011 小型火力发电厂设计规范现行
收藏
-
中华人民共和国住房和城乡建设部公告
-
Announcement of Ministry of Housing and Urban-Rural Development of the People s Republic of China
-
Foreword
-
1 General
-
2 Terms
-
3 Basic Requirements
-
4 Heating(Cooling)and Electrical Load
-
4.1 Heating(Cooling)Load and Heating(Cooling)Medium
-
4.2 Electrical Load
-
5 Siting
-
6 Overall Planning
-
6.1 General Requirements
-
6.2 Planning of Plant Area
-
6.3 Off-site Planning
-
7 Main Power Building Arrangement
-
7.1 General Requirements
-
7.2 Main Power Building Arrangement
-
7.3 Maintenance and Repair Facilities
-
7.4 Integrated Facilities
-
8 Coal Handling System
-
8.1 General Requirements
-
8.2 Coal Unloading Facilities and Off-site Transportation
-
8.3 Belt Conveyor System
-
8.4 Coal Yard and Relevant Facilities
-
8.5 Screen and Coal Crusher
-
8.6 Limestone Storage and Pulverizing System
-
8.7 Coal Handling Control Mode
-
8.8 Coal Handling Auxiliary Facilities and Ancillary Buildings
-
9 Boiler Equipment and System
-
9.1 Boiler Equipment
-
9.2 Coal Pulverizing System
-
9.3 Flue Gas and Air System
-
9.4 Ignition and Combustion Supporting Oil System
-
9.5 Boiler Auxiliary System and Associated Equipment
-
9.6 Startup Boiler
-
10 Ash Handling System
-
10.1 General Requirements
-
10.2 Hydraulic Ash Handling System
-
10.3 Mechanical Bottom Ash Handling System
-
10.4 Dry Fly Ash Handling System
-
10.5 Off-site Ash Transportation System
-
10.6 Control and Maintenance Facilities
-
10.7 Ash Handling System for CFB Boiler
-
11 Flue Gas Desulfurization System
-
12 DeNOx System
-
13 Steam Turbine Equipment and System
-
13.1 Steam Turbine Equipment
-
13.2 Main Steam System and Heat Supplying Steam System
-
13.3 Feedwater System and Feedwater Pump
-
13.4 Deaerator and Feedwater Tank
-
13.5 Condensate System and Condensate Pump
-
13.6 Drain Pump of Low-pressure Heater
-
13.7 Drain Flash Tank,Drain Tank,Drain Pump,Low-level Water Tank,and Low-level Water Pump
-
13.8 Service Water System
-
13.9 District Heating System Heater and System
-
13.10 Temperature and Pressure Reducing Devices
-
13.11 Condensate Recovery Device for Steam Network
-
13.12 Condenser and Its Auxiliary Facilities
-
14 Water Treatment Equipment and System
-
14.1 Water Pretreatment System
-
14.2 Water Pre-desalination System
-
14.3 Boiler Makeup Water Treatment System
-
14.4 Chemical Dosing and Water-Steam Sampling of Thermodynamic System
-
14.5 Cooling Water Treatment
-
14.6 Water Treatment System for District Heating System Makeup Water and Industrial Return Water
-
14.7 Chemicals Storage and Solution Tank
-
14.8 Design and Anticorrosion of Tanks,Channels,Pipes,and Valves
-
14.9 Chemical Laboratory and Instruments
-
15 Information System
-
15.1 General Requirements
-
15.2 Overall Planning of Plant Information System
-
15.3 Management Information System
-
15.4 Price Bidding System
-
15.5 Video Monitoring System
-
15.6 Access Guard Management System
-
15.7 Cabling
-
15.8 Information Security
-
16 Instrumentation and Control
-
16.1 General Requirements
-
16.2 Control Mode and Automation Level
-
16.3 Arrangement of Control Room and Electrical Equipment Room
-
16.4 Measurement and Instrumentation
-
16.5 Modulating Control
-
16.6 On-off Control and Interlocking
-
16.7 Alarm
-
16.8 Protection
-
16.9 Control System
-
16.10 Control Power Supply
-
16.11 Arrangement of Cables,Instrument Conduits,and Local Equipment
-
16.12 Instrumentation and Control Laboratory
-
17 Electrical Equipment and System
-
17.1 Generator and Main Transformer
-
17.2 Main Electrical Connection
-
17.3 AC Auxiliary Power System
-
17.4 HV Switchgears
-
17.5 DC Power Supply System and AC UPS
-
17.6 Electrical Supervisory and Control
-
17.7 Electrical Measuring Devices
-
17.8 Relaying Protection and Automatic Safety Devices
-
17.9 Lighting System
-
17.10 Selection and Laying of Cables
-
17.11 Overvoltage Protection and Grounding
-
17.12 Electrical Laboratory
-
17.13 Electrical Installations in Areas with Fire and Explosion Hazards
-
17.14 Inner Communication
-
17.15 Power System Protection
-
17.16 System Communication
-
17.17 Remote Control
-
17.18 Energy Metering
-
18 Hydraulic Facilities and Systems
-
18.1 Water Source and Water Balance Management
-
18.2 Water Supply System
-
18.3 Water Intake Structure and Pump House
-
18.4 Delivery Pipeline,Culvert and Channel
-
18.5 Cooling Facilities
-
18.6 External Ash Handling System and Ash Yard
-
18.7 Water Supply and Drainage
-
18.8 Hydraulic Buildings(Structures)
-
19 Auxiliary and Ancillary Facilities
-
20 Architecture and Structure
-
20.1 General Requirements
-
20.2 Seismic Design
-
20.3 Structure of the Main Building
-
20.4 Subgrade and Foundation
-
20.5 Daylighting and Natural Ventilation
-
20.6 Thermal Engineering and Noise Control in Buildings
-
20.7 Water Proofing and Drainage
-
20.8 Indoor and Outdoor Decoration
-
20.9 Door and Window
-
20.10 Living Facilities
-
20.11 Chimney
-
20.12 Coal Conveying Structures
-
20.13 Supporting Structure of Air Cooled Condenser
-
20.14 Live Loads
-
21 Heating,Ventilation and Air Conditioning
-
21.1 General Requirements
-
21.2 Main Power Building
-
21.3 Electrical Buildings and Electrical Equipment
-
21.4 Coal Handling Building
-
21.5 Chemical Building
-
21.6 Other Auxiliary and Accessory Buildings
-
21.7 Refrigerating Station,Heating Station,and Piping Network in the Plant Area
-
22 Environmental Protection and Soil and Water Conservation
-
22.1 General Requirements
-
22.2 Design Requirements for Environmental Protection and Soil and Water Conservation
-
22.3 Principle for Treatment of Pollution Sources
-
22.4 Environmental Management and Monitoring
-
22.5 Soil and Water Conservation
-
23 Labor Safety and Occupational Health
-
23.1 General Requirements
-
23.2 Labor Safety
-
23.3 Occupational Health
-
24 Fire Protection
-
Appendix A Total Water Quality Analysis Report
-
Explanation of Wording in This Code
-
List of Quoted Standards