GB 50475-2008 石油化工全厂性仓库及堆场设计规范:英文 - 工标库
由工标库AI生成
查看更多
GB 50475-2008 石油化工全厂性仓库及堆场设计规范:英文现行
收藏
-
Announcement of Ministry of Housing and Urban-Rural Development of the People s Republic of China
-
Foreword
-
1 General Provisions
-
2 Terms
-
3 Classification of Warehouses and Laydown Areas
-
4 General Layout and Vertical Arrangement
-
4.1 General Requirements
-
4.2 General Layout
-
4.3 Road
-
4.4 Railroad
-
4.5 Jetty
-
4.6 Belt Conveyor
-
4.7 Fence and Entrance/Exit
-
4.8 Greening
-
4.9 Vertical Arrangement
-
5 Storage Process
-
5.1 Barreled and Bagged Material Warehouse
-
5.2 Metallic Material and Spare Part Warehouse
-
5.3 Bulk Materials Warehouse
-
5.4 Reinforced Concrete Silos
-
5.5 Operating Shifts
-
6 Period of Storage
-
6.1 General Requirements
-
6.2 Finished Products and Raw(Fuel)Materials
-
6.3 Chemicals and Hazardous Substances
-
6.4 Metallic Materials and Spare Parts
-
7 Architectural Design
-
7.1 General Requirements
-
7.2 Doors and Windows
-
7.3 Ground
-
7.4 Heating and Ventilation
-
8 Laydown Areas
-
8.1 General Requirements
-
8.2 Calculation of Laydown Area
-
8.3 Gantry Grabbing Crane Laydown Area
-
8.4 Bridge Grabbing Crane Laydown Area
-
8.5 Bucket-Wheel Stacker/Reclaimer Laydown Area
-
9 Control and Management
-
9.1 General Requirements
-
9.2 Control
-
9.3 Management
-
10 Storage Machinery
-
10.1 General Requirements
-
10.2 Selection of Major Storage Machinery
-
11 Safety and Environmental Protection
-
11.1 Firefighting
-
11.2 Safety
-
11.3 Occupational Health
-
11.4 Environmental Protection
-
11.5 Emergency Rescue
-
Appendix A Starting and Ending Point for Spacing Calculation
-
Appendix B Calculation of Warehouse Area
-
Appendix C Calculation of Forklift Aisle Width
-
Appendix D Calculation of Bulk materials Warehouse Storage Volume and Area
-
Appendix E Period of Storage
-
Appendix F Bulk materials Laydown Area Storage Volume and Area Calculation
-
Appendix G Number of Loading/Unloading Machinery
-
Explanation of Wording in This Code