GB 50397-2007 GB 50397-2007冶金电气设备工程安装验收规范:英文 - 工标库
由工标库AI生成
查看更多
GB 50397-2007 GB 50397-2007冶金电气设备工程安装验收规范:英文现行
收藏
-
Announcement of the Ministry of Construction of the People s Republic of China
-
Foreword
-
1 General Provisions
-
2 Basic Requirements
-
2.1 General Requirements
-
2.2 Inspection of Main Equipment and Materials
-
2.3 Division of Construction Quality Acceptance for Electrical Equipment Installation Engineering in Metallurgy
-
2.4 Quality Acceptance of Electrical Equipment Installation Engineering in Metallurgy
-
2.5 Procedure and Organization for Construction Quality Acceptance of Electrical Equipment Installation Engineering in Metallurgy
-
2.6 Documents for Completion Acceptance of Works
-
3 Installation of High-Voltage Electrical Equipment
-
3.1 Dominant Items
-
3.2 General Items
-
4 Installation of Power Transformer
-
4.1 Dominant Items
-
4.2 General Items
-
5 Installation of Instrument Transformer,Reactor,Lightning Arrester and Capacitor
-
5.1 Dominant Items
-
5.2 General Items
-
6 Installation of Electrical Rotating Motor
-
6.1 Dominant Items
-
6.2 General Items
-
7 Installation of Distribution Panel and Switch Cabinet
-
7.1 Dominant Items
-
7.2 General Items
-
8 Installation of Storage Battery
-
8.1 Dominant Items
-
8.2 General Items
-
9 Installation of Low-Voltage Apparatus
-
9.1 Dominant Items
-
9.2 General Items
-
10 Installation of Electrical Equipment for Crane
-
10.1 Dominant Items
-
10.2 General Items
-
11 Installation of Trolley Line and Traveling Flexible Cable
-
11.1 Dominant Items
-
11.2 General Items
-
12 Installation of Busbar Device
-
12.1 Dominant Items
-
12.2 General Items
-
13 Cable Line
-
13.1 Dominant Items
-
13.2 General Items
-
14 Laying of Lines in Open Pit Mine
-
14.1 Dominant Items
-
14.2 General Items
-
15 Laying of Cables in Underground Mine
-
15.1 Dominant Items
-
15.2 General Items
-
16 Installation of Cable Bearer and Tray
-
16.1 Dominant Items
-
16.2 General Items
-
17 Preparation of Cable Terminal and Joint
-
17.1 Dominant Items
-
17.2 General Items
-
18 Installation of Overhead Line and Pole-Mounted Electrical Equipment
-
18.1 Dominant Items
-
18.2 General Items
-
19 Installation of Traction Network
-
19.1 Dominant Items
-
19.2 General Items
-
20 Piping and Wiring
-
20.1 Dominant Items
-
20.2 General Items
-
21 Installation of Electrical Lighting Equipment
-
21.1 Dominant Items
-
21.2 General Items
-
22 Installation of Lighting Fixture and Distribution Box in Mine
-
22.1 Dominant Items
-
22.2 General Items
-
23 Installation of Lightning Rod (Conduction) and Grounding Device
-
23.1 Dominant Items
-
23.2 General Items
-
24 Laying of Electrical Lines in Explosive Gas Atmospheres
-
24.1 Dominant Items
-
24.2 General Items
-
25 Installation of Electrical Equipment in Explosive Gas Atmospheres
-
25.1 Dominant Items
-
25.2 General Items
-
26 Installation of Electrical Equipment in Fire Hazardous Area
-
26.1 Dominant Items
-
26.2 General Items
-
Appendix A Construction Site Quality Inspection and Acceptance Record
-
Appendix B Standard for Material and Electrolyte of Storage Battery
-
Appendix C Rectangular Busbar Lapping Requirements
-
Appendix D Safe Net Distance for Power Distribution Unit
-
Appendix E Minimum Clearance Between Buried Cables Where Cables Are Parallel With and Cross Pipes,Roads and Buildings
-
Appendix F Zoning of Explosion and Fire Hazardous Areas
-
Explanation of Wording in This Code