GB 51108-2015 尾矿库在线安全监测系统工程技术规范:英文 - 工标库
由工标库AI生成
查看更多
GB 51108-2015 尾矿库在线安全监测系统工程技术规范:英文现行
收藏
-
NOTICE
-
Translation Publication Explanation
-
Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
-
Foreword
-
1 General provisions
-
2 Terms and symbols
-
2.1 Terms
-
2.2 Symbols
-
2.3 Abbreviations
-
3 Basic requirements
-
3.1 Safety monitoring requirements
-
3.2 Tailings pond classification
-
3.3 Safety monitoring level
-
3.4 Safety monitoring items
-
4 Monitoring system
-
4.1 General requirements
-
4.2 Initial design data
-
4.3 Monitoring profiles and monitoring points arrangement
-
4.4 Monitoring equipments
-
4.5 Monitoring frequency
-
4.6 Technical requirements
-
5 On-site inspection and examination,manual safety monitoring
-
5.1 General requirements
-
5.2 On-site inspection and examination
-
5.3 Manual safety monitoring
-
6 Online safety monitoring
-
6.1 General requirements
-
6.2 Monitoring of tailings dam displacement
-
6.3 Monitoring of seepage
-
6.4 Monitoring of tailings pond level
-
6.5 Monitoring of dry beach
-
6.6 Monitoring of precipitation
-
6.7 Monitoring of drainage
-
6.8 Monitoring and control of tailings pond
-
6.9 Monitoring of geological landslide body for tailings pond
-
7 Online safety monitoring system integration
-
7.1 General requirements
-
7.2 Monitoring and management station,monitoring centre
-
7.3 Communication networks
-
7.4 Power supply
-
7.5 Lightning protection
-
7.6 System debugging
-
8 Data analysis and early warning
-
8.1 General requirements
-
8.2 Data processing and analysis
-
8.3 Monitoring and early warning
-
8.4 Information feedback
-
9 Project acceptance
-
10 Operation and maintenance,data archiving
-
Appendix A On-site inspection and examination
-
Appendix B Monitoring of tailings dam surface displacement
-
Appendix C Monitoring of tailings dam internal displacement
-
C.1 Installation and laying of inclinometer pipe
-
C.2 Installation and burying of single point settlement gauge
-
Appendix D Monitoring of seepage
-
D.1 Installation and laying of piezometer pipe
-
D.2 Installation and burying of pore water pressure gauge
-
D.3 Installation of measuring weir
-
Appendix E Monitoring of precipitation
-
Explanation of wording in this code
-
List of quoted standards