Foreword
-
1 Scope
-
2 Normative References
-
3 Inspection of Raw Material and Equipment
-
4 Survey
-
5 Earthwork
-
6 Foundation
-
6.1 General Provisions
-
6.2 Cast-in-site(CIS)Foundation
-
6.3 Cast-in-drilled-hole(CIDH)Pile Foundation
-
6.4 Rock Foundation
-
6.5 Winter Construction
-
7 Tower
-
7.1 General Provisions
-
7.2 Steel Towers
-
8 Installation of Overhead Conductors and Ground Wires
-
8.1 General Provisions
-
8.2 Tension Stringing
-
8.3 Connection
-
8.4 Wire Tightening
-
8.5 Installation of Accessories
-
8.6 Installation of Optical Fiber Composite Overhead Ground Wires(OPGW)
-
9 Grounding
-
10 Acceptance and Transfer
-
10.1 Acceptance
-
10.2 Test on Completion
-
10.3 Transfer of Documents
-
10.4 Project Transfer After Completion