GB 50551-2010 GB 50551-2010球团机械设备安装工程质量验收规范:英文废止
收藏
-
Announcement of Ministry of Construction of the People s Republic of China
-
Foreword
-
1 General Provisions
-
2 Terms
-
3 Basic Requirement
-
4 Equipment Foundation,Anchor Bolt and Bearing Plate
-
4.1 General Requirement
-
4.2 Equipment Foundation
-
4.3 Anchor Bolt
-
4.4 Bearing Plate
-
5 Equipment and Materials in Site
-
5.1 General Requirement
-
5.2 Equipment
-
5.3 Materials
-
6 Mixing and Balling Equipment Installation Engineering
-
6.1 General Requirement
-
6.2 Intensive Mixer
-
6.3 Disc Pelletizer
-
7 Distribution Equipment Installation Engineering
-
7.1 General Requirement
-
7.2 Shuttle Conveyor Belt
-
7.3 Hearth and Side Layer Bin
-
7.4 Swing Distributor
-
7.5 Wide Transfer Belt
-
7.6 Roller Feeder
-
8 Shaft Furnace Equipment Installation Engineering
-
8.1 Pin Roll Discharger
-
8.2 Upper Steel Structure
-
8.3 Bottom Steel Structure
-
8.4 Hood
-
9 Traveling Grate Equipment Installation Engineering
-
9.1 Support
-
9.2 Head Pulley
-
9.3 Drive Unit
-
9.4 Head Curve and Middle Orbit
-
9.5 Tail Assembly
-
9.6 Sealing Chute
-
9.7 Pallet and Grate Cleaning Device and Sealing Plate
-
9.8 Pallet Replacing Device
-
9.9 Wind Boxes
-
9.10 Dust Bin and Bunker
-
9.11 Furnace Housing and Combustor
-
10 Grate-Kiln Equipment Installation Engineering
-
10.1 Support
-
10.2 Drive Unit
-
10.3 Conveyor Chain
-
10.4 Sealing Chute and Sealing Plate
-
10.5 Wind Boxes and Dust Bin
-
10.6 Spading Plate
-
10.7 Upper Housing and Auxiliary Stack
-
10.8 Kiln
-
11 Circular Cooler Equipment Installation Engineering
-
11.1 Support
-
11.2 Wind Boxes
-
11.3 Carrying and Thrust Rollers
-
11.4 Pallet Frame Assembly
-
11.5 Hopper
-
11.6 Pressing Rail
-
11.7 Drive Unit
-
11.8 Upper Stationary Housing
-
11.9 Pallet Tripper
-
12 Palletizing Mechanical Equipment Test Run
-
12.1 General Requirement
-
12.2 Intensive Mixer Test Run
-
12.3 Disc Pelletizer Test Run
-
12.4 Shuttle Conveyor Belt Test Run
-
12.5 Swing Distributor Test Run
-
12.6 Wide Transfer Belt Test Run
-
12.7 Roller Feeder Test Run
-
12.8 Spike Roll Discharger Test Run
-
12.9 Traveling Grate Machine Test Run
-
12.10 Chain Grate Test Run
-
12.11 Kiln Test Run
-
12.12 Circular Cooler Test Run
-
Appendix A Subdivision Works Quality Acceptance Record of Palletizing Mechanical Equipment Installation
-
Appendix B Division Works Quality Acceptance Record of PalletizingMechanical Equipment Installation
-
Appendix C Unit Works Quality Acceptance Record of Palletizing Mechanical Equipment Installation
-
Appendix D No-load Commissioning Record of Palletizing Mechanical Equipment
-
Explanation of Wording in This Code
-
List of Quoted Standards