Notice of Ministry of Housing and Urban-Rural Development of the People s Republic of China
-
Foreword
-
1 General Provisions
-
2 Terminologies
-
3 Basic Requirement
-
4 Equipment Foundation,Anchor Bolt and Base Plate
-
4.1 General Requirement
-
4.2 Equipment Foundation
-
4.3 Anchor Bolts
-
4.4 Base Plate
-
5 Equipment and Material Approach
-
5.1 General Requirement
-
5.2 Equipment
-
5.3 Material
-
6 Crushing,Grinding and Sieving Equipment
-
6.1 General Requirement
-
6.2 Jaw Crusher
-
6.3 Cycle Crusher
-
6.4 Taper Crusher
-
6.5 Ore Mill
-
6.6 High Pressure Roller Grinding
-
6.7 Vibration Sieve
-
7 Classifying and Sorting Equipment
-
7.1 General Requirement
-
7.2 Spiral Classifier
-
7.3 Hydrocyclone
-
7.4 Fine Sieve
-
7.5 Barrel-Type Magnetic Separator
-
7.6 Turn Cage Magnetic Separator
-
7.7 Ring-Type Magnetic Separator
-
7.8 Magnetic Dewatering Tank
-
7.9 Flotator
-
7.10 Jigger
-
7.11 Shaking Table
-
7.12 Centrifugal Separator
-
7.13 Spiral Concentrator,Spiral Chute
-
8 Dewatering Equipment
-
8.1 General Requirement
-
8.2 Center Drive-Type Concentrator
-
8.3 Circum Drive-Type Concentrator
-
8.4 Tube Internal Filtering Vacuum Filter
-
8.5 External Filtering Vacuum Filter
-
8.6 Pressure Filter
-
9 Feeding and Ore Drawing Equipment
-
9.1 General Requirement
-
9.2 Tramcar Dumper
-
9.3 Plate-Type Feeder
-
9.4 Electromagnetic and Motor Vibration Feeder
-
9.5 Disk Feeder
-
9.6 Chute Feeder
-
9.7 Chain and Pendulum Feeder
-
9.8 Ore Drawing Gate
-
9.9 Feeding and Ore Drawing Equipment Running-in
-
Explanation of Wording in This Code
-
List of Quoted Standards
-
Explanation of Provisions
-
Introduction of Code Development