GB 50402-2007 GB 50402-2007烧结机械设备工程安装验收规范:英文 - 工标库
由工标库AI生成
查看更多
GB 50402-2007 GB 50402-2007烧结机械设备工程安装验收规范:英文现行
收藏
-
Announcement of the Ministry of Construction of the People s Republic of China
-
Foreword
-
1 General Provisions
-
2 Basic Requirement
-
3 Equipment Foundation,Anchor Bolt and Shim Plate
-
3.1 General Requirement
-
3.2 Equipment Foundation
-
3.3 Anchor Bolt
-
3.4 Shim Plate
-
4 Equipment and Material Mobilization
-
4.1 General Requirement
-
4.2 Equipment
-
4.3 Raw Material
-
5 Installation for Material Feeder and Mixture Equipment
-
5.1 General Requirement
-
5.2 Constant Feeder
-
5.3 Mixture Equipment
-
6 Installation for Sintering Equipment
-
6.1 General Requirement
-
6.2 Framework
-
6.3 Shuttle Belt Conveyor
-
6.4 Bedding Trough,Mixed Trough
-
6.5 Cylinder Feeder
-
6.6 Deflector
-
6.7 Roller Distributor
-
6.8 Head Wheel
-
6.9 Gearing
-
6.10 Portfire Device
-
6.11 Head Bending Rail and Intermediate Rail
-
6.12 Tail Device
-
6.13 Sealing Slide and Sealing Plate
-
6.14 Trolley and Grate Cleaning Device
-
6.15 Heat Crusher
-
6.16 Bellows and Main Exhaust Tube
-
6.17 Ash Bucket and Chute
-
7 Installation for Circular Cooler
-
7.1 General Requirement
-
7.2 Framework
-
7.3 Grain Hopper
-
7.4 Bellows and Sealing Covering
-
7.5 Rail
-
7.6 Gearing Framework
-
7.7 Trolley and Gearing
-
7.8 Roller Block and Idler Roller
-
7.9 Ring-type Scraper Conveyor
-
7.10 Fan
-
8 Installation for Straight Cooler
-
8.1 General Requirement
-
8.2 Framework
-
8.3 Sealing Covering and Exhaust Tube
-
8.4 Gearing Device
-
8.5 Belt-type Scraper Conveyor
-
8.6 Fan
-
9 Installation for Main Exhausting Equipment
-
9.1 General Requirement
-
9.2 Bearing Base
-
9.3 Bearing
-
9.4 Housing Case and Rotor
-
9.5 Auxiliary Equipment
-
10 Installation for Electrical Dedusting Equipment
-
10.1 General Requirement
-
10.2 Body
-
10.3 Discharge Electrode and Dedusting Plate
-
10.4 Beating Device
-
10.5 Dust Conveying Device
-
11 Bag Filter
-
11.1 General Requirement
-
11.2 Body
-
11.3 Installation for Dust Conveying Device
-
12 Multiclone Dust Collector
-
12.1 General Requirement
-
12.2 Body Installation
-
12.3 Cyclone
-
13 Equipment Run Test
-
13.1 General Requirement
-
13.2 Run Test for Constant Feeder
-
13.3 Run Test for Mixer
-
13.4 Run Test for Sintering Equipment
-
13.5 Run Test for Circular Cooler
-
13.6 Run Test for Straight Cooler
-
13.7 Run Test for Main Exhausting Equipment
-
13.8 Run Test for Electrical Dedusting Equipment
-
13.9 Run Test for Bag Filter
-
13.10 Multi-tube Dedusting Equipment
-
Appendix A Quality Acceptance Record Sheet for Engineering Installation of Itemized Project of Sintering Mechanical Equipment
-
Appendix B Quality Acceptance Record Sheet for Engineering Installation of Partial Project of Sintering Mechanical Equipment
-
Appendix C Quality Acceptance Record Sheet for Engineering Installation of Unit Project of Sintering Mechanical Equipment
-
Appendix D Non-load Run Test Record Sheet for Sintering Mechanical Equipment
-
Explanation of Wording in This Code