GB 50863-2013 尾矿设施设计规范:英文现行
收藏
-
中华人民共和国住房和城乡建设部公告
-
Translation Publication Explanation
-
Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
-
Foreword
-
1 General provisions
-
2 Terms
-
3 Tailings pond
-
3.1 Site selection
-
3.2 Storage capacity
-
3.3 Class of tailings pond and grade of corresponding structures
-
3.4 Monitoring facilities
-
3.5 Auxiliary facilities
-
4 Tailings dam
-
4.1 General requirements
-
4.2 Minimum free height and beach width of deposited beach
-
4.3 Requirements and measures for seepage control
-
4.4 Stability calculation
-
4.5 Construction requirements
-
4.6 Construction of centerline embankment and downstream embankment
-
5 Dry-stacking of tailings
-
5.1 General requirements
-
5.2 Tailings dewatering equipment selection
-
5.3 Dry tailings discharging and stacking method
-
5.4 Dry tailings transportation,leveling and compaction
-
5.5 Key calculation points of dry-stacking tailings dam slope stability
-
5.6 Flood discharge design for dry-stacking tailings pond
-
5.7 Other technical requirements for dry-stacking tailings pond
-
5.8 Determination of filtering plant location
-
6 Flood drainage design of tailings pond
-
6.1 General requirements
-
6.2 Hydrological,hydraulic& flood regulation calculation
-
6.3 Structures for flood drainage
-
7 Closure design for tailings pond
-
8 Tailings extraction
-
9 Reclaimed water of tailings pond
-
10 Thickening of tailings slurry
-
11 Delivery of tailings slurry
-
11.1 General requirements
-
11.2 Hydraulic calculation
-
11.3 Pipe and channel laying
-
11.4 Pipe and channel material and accessory device
-
12 Tailings slurry pump station
-
12.1 General requirements
-
12.2 Slurry tank and clean water tank
-
12.3 Equipment selection and configuration
-
12.4 Pump station configuration
-
12.5 Power supply,communication and other facilities
-
13 Environmental protection measures of tailings facilities
-
13.1 General requirements
-
13.2 Seepage control design for tailings pond environmental protection
-
13.3 Other environmental protection measures of tailings facilities
-
Appendix A Classification list of fresh tailings
-
Appendix B Determination method for the tailings deposited beach slope
-
Appendix C Average physical& mechanical property indices of tailings dam material
-
Appendix D Estimation formula of sediment volume washed by the heaviest flood at one time for landslide dam
-
Appendix E Tests of tailings slurry delivery
-
Explanation of wording in this code
-
List of quoted standards