DL 5190.2-2012 DL 5190.2-2012电力建设施工技术规范.第2部分,锅炉机组:英文 - 工标库
由工标库AI生成
查看更多
DL 5190.2-2012 DL 5190.2-2012电力建设施工技术规范.第2部分,锅炉机组:英文现行
收藏
-
Foreword
-
1 General Provisions
-
2 Terms
-
3 Basic Provisions
-
3.1 General Provisions
-
3.2 The Interface Between Erection and Buildings
-
4 Steel Structures and Metal Parts
-
4.1 General Provisions
-
4.2 Boiler Foundation Inspection,Lineation and Pad Iron Erection
-
4.3 Boiler Steel Structures Erection and Secondary Grouting
-
4.4 Manholes,Observation Holes and Boiler Setting Parts
-
4.5 Boiler Sealing Elements
-
4.6 Combustion Equipment
-
4.7 Air Heater
-
4.8 Inspection and Documentation
-
5 Heating Surface
-
5.1 General Provisions
-
5.2 Steam Drum,Steam-water Separator and Header
-
5.3 Waterwalls
-
5.4 Superheater,Reheater,Economizer and Desuperheater
-
5.5 Boiler Water Circulating Pump and Start-up Pump
-
5.6 Circulating Fluidized Bed Boiler Heating Surface Equipment
-
5.7 Hydrostatic Test
-
5.8 Inspection and Documentation
-
6 Boiler Attached Pipes and Accessories
-
6.1 General Provisions
-
6.2 Boiler Blowdown,Sampling,Heating,Drain and Discharge,Vent and Desuperheating Pipes
-
6.3 Start-up System
-
6.4 Water Level Indicator for Steam Drum
-
6.5 Safety Valves
-
6.6 Soot Blowing System
-
6.7 Inspection and Documentation
-
7 Flue Gas/Air Ducts,Fuel/Bulk Material Pipes and Auxiliary Equipment
-
7.1 General Provisions
-
7.2 Assembly and Erection of Flue Gas/Air Ducts and Fuel/Bulk Material Pipes
-
7.3 Accessories and Devices of Flue Gas/Air Ducts,Fuel/Bulk Material Pipes
-
7.4 Leak Test for Furnace and Flue Gas System
-
7.5 Dust Precipitators
-
7.6 Inspection and Documentation
-
8 Desulfurization and Denitrification
-
8.1 General Provisions
-
8.2 Flue Gas Desulfurization
-
8.3 Flue Gas Denitrification
-
8.4 Inspection and Documentation
-
9 Equipment and Pipes of Fuel Oil System
-
9.1 General Provisions
-
9.2 The Oil Unloading Device and Pipes
-
9.3 Oil Tank and Accessories
-
9.4 Oil Supply Equipment and Pump Room Pipes
-
9.5 Plant Fuel Pipes
-
9.6 Boiler Room Fuel Pipes
-
9.7 Blowing and Oil-passing Test of Fuel Oil System
-
9.8 Required Conditions Before Receiving Oil for Fuel Oil System
-
9.9 Inspection and Documentation
-
10 Boiler Auxiliary Machineries
-
10.1 General Provisions
-
10.2 General Rules for the Erection of Auxiliary Machineries
-
10.3 Oil System of Auxiliary Machinery
-
10.4 Coal Mills
-
10.5 Fans
-
10.6 Coal Feeder
-
10.7 Air Compressor
-
10.8 Ash Handling Equipment
-
10.9 Slag Dragging Machine
-
10.10 Slag Crusher
-
10.11 Bucket Chain Conveyor
-
10.12 Chain Bucket Elevator
-
10.13 Equipment of Bottom Ash Cooler
-
10.14 Inspection and Documentation
-
11 Coal Handling Equipment
-
11.1 General Provisions
-
11.2 Rubber Belt Coal Conveyor
-
11.3 Coal Unloader for the Rubber Belt Coal Conveyer
-
11.4 Magnetic Separator
-
11.5 Coal Crusher
-
11.6 Coal Screening Machine
-
11.7 Unloading Equipment and Coal Yard Equipment
-
11.8 Inspection and Documentation
-
12 Boiler Setting and Insulation & Corrosion Protection of Thermal Equipment and Pipes
-
12.1 General Provisions
-
12.2 The Refractory and Insulation Materials
-
12.3 Unshaped Abrasion Resistant Refractory Materials Construction
-
12.4 Furnace Lining Construction
-
12.5 Insulation Construction of Boiler Proper,Thermal Equipment and Pipes
-
12.6 Outer Casing Construction for Boiler Proper,Thermal Equipment and Pipes
-
12.7 Corrosion Protection
-
12.8 Seasonal Construction
-
12.9 Inspection and Documentation
-
13 Trial Operation and Acceptance of Boiler Unit
-
13.1 General Provisions
-
13.2 Main Points for Boiler Trial Operation
-
13.3 High Temperature Drying-out
-
13.4 Boiler Chemical Cleaning
-
13.5 Flushing and Blowing of Pipes
-
13.6 Steam Leak Test and Safety Valve Adjustment
-
13.7 Start-up Trial Operation of the Complete Boiler Unit
-
13.8 Inspection and Documentation
-
Appendix A Urban Refuse Incineration Boiler Erection
-
A.1 General Provisions
-
A.2 Refuse Incineration Boiler Erection
-
A.3 Inspection and Documentation
-
Appendix B Biomass Incineration Boiler Erection
-
B.1 General Provisions
-
B.2 Biomass Incinerator Boiler Erection
-
B.3 Inspection and Documentation
-
Appendix C Gas-turbine Heat Recovery Boiler Erection
-
C.1 General Provisions
-
C.2 Erection of the Framework and Related Metal Structures
-
C.3 Heating Surface Erection
-
C.4 Erection of Flue Gas Ducts
-
Appendix D Manufacture and Assembly Tolerance of Boiler Steel Structure
-
D.1 Material Cutting and Opening Size Deviation
-
D.2 Edge Deviation of Butt Joints
-
D.3 Structural Steel Assemblies
-
D.4 Plate Girder Components
-
D.5 Beams(Not Including Plate Girders)
-
D.6 Columns
-
D.7 Frameworks and Trusses
-
D.8 Platforms and Staircases
-
D.9 Size Deviation Correction
-
Appendix E The Critical Temperature of Common Steels in Thermal Power Erection
-
Appendix F Allowable Deviation of Boiler Foundation Axes and Overall Dimension
-
Appendix G Inspection Items of High Strength Bolt Connection Projects
-
Appendix H Manufacturing and Assembly Tolerance of Tubular Air Heater
-
H.1 The Edge Deviation of Butt Welds
-
H.2 Tube Sheet
-
H.3 Tube Channel
-
Appendix J Allowable Deviations of the Outer Diameter and Wall Thickness of Heating Surface Tubes
-
Appendix K Strength Calculation Requirements of Temporary Tubes and Plugs for Hydrostatic Test
-
K.1 Wall Thickness Calculation
-
K.2 The Maximum Allowable Diameter Calculation
-
K.3 Wall Thickness Calculation of Heads and Plugs
-
Appendix L Manufacturing Size Allowable Deviation of Gas(Air)Ducts and Fuel(Material)Pipes
-
Appendix M Inspection Requirements of Filter Bag and Its Theoretical Value of Erection Pre-tention Force
-
Appendix N Allowable Deviation of Large Power Equipment Foundation
-
Appendix P Requirements of Track Laying
-
Appendix Q Paint Color and Marking of Main Equipment and Pipes
-
Explanation of Wording in This Code
-
Referenced Standards