Announcement of Ministry of Construction of the People s Republic of China
-
Foreword
-
1 General
-
2 Terms and Definitions
-
3 Selection of Cable Type and Cross-section
-
3.1 Material of Cable Conductor
-
3.2 Number of Power Cable Cores
-
3.3 Cable Insulation Level
-
3.4 Type of Cable Insulation
-
3.5 Type of External Sheath of Cable
-
3.6 Control Cable and Metal Shielding
-
3.7 Cross-section of Power Cables
-
4 Selection and Configuration of Cable Accessories
-
4.1 General Provisions
-
4.2 Oil Supply Systems of Self-contained Oil-filled Cables
-
5 Cable Laying
-
5.1 General Provisions
-
5.2 Selection of Laying Mode
-
5.3 Underground Direct Burying
-
5.4 Laying of Protection Conduits
-
5.5 Cable Structures Laying
-
5.6 Cable Laying in Other Utilities
-
5.7 Underwater Cable Laying
-
6 Cable Supports and Fixings
-
6.1 General Provisions
-
6.2 Cable Supports and Trays
-
7 Fire Protection and Retardation of Cables
-
Appendix A Maximum Allowable Temperature of Common Power Cable Conductor
-
Appendix B Section Selection Methods for Economic Current of Power Cable Rated 10kV and below
-
Appendix C Allowable 100% Continuous Ampacity of Common Power Cables Rated 10kV and below
-
Appendix D Correction Factors of Allowable Continuous Ampacity of Cables Under Different Laying Conditions
-
Appendix E Methods for Calculation of Allowable Minimum Cross-section of Cable Conductor Based on the Short-circuit Thermal Stability Conditions
-
E.1 Allowable Minimum Cross-section of Conductors of Solid Insulated Cables
-
E.2 Allowable Minimum Cross-section of Conductors for Self-contained Oil-filled Cables
-
Appendix F Calculation Formula of Normal Induced Potential of Metallic Layer of Single-core Cables of AC System
-
Appendix G Additional Length of Cables Rated 5kV and Below During Laying Measurement
-
Appendix H Calculation Methods for Maximum Allowable Length of Conduits in case of Penetrating Cables through Conduits
-
Explanation of Wording in This Code