GB 51037-2014 GB 51037-2014 微组装生产线工艺设备安装工程施工及验收规范:英文 - 工标库
由工标库AI生成
查看更多
GB 51037-2014 GB 51037-2014 微组装生产线工艺设备安装工程施工及验收规范:英文废止
收藏
-
中华人民共和国住房和城乡建设部公告
-
Announcement of the Minstry of Housing and Urban-Rural Development of the People#x0027;s Republic of China
-
Foreword
-
1 General provisions
-
2 Terms
-
3 Basic requirements
-
3.1 Construction conditions
-
3.2 Equipment unpacking
-
3.3 Equipment moving
-
3.4 Equipment installation
-
3.5 Debugging and commissioning of equipment
-
4 Installation,debugging and commissioning of low temperature co-fined ceramic and thick film substrate production process equipment
-
4.1 General requirements
-
4.2 Tape caster
-
4.3 Blanker
-
4.4 Green tape puncher
-
4.5 Laser scribing machine
-
4.6 Via filling machine
-
4.7 Screen printer
-
4.8 Stacking machine
-
4.9 Isostatic laminator
-
4.10 Hot cutter
-
4.11 Low temperature co-fined ceramic box furnace(LTCC box furnace)
-
4.12 Thick-film belt furnace
-
4.13 Laser resistor trimmer
-
5 Thin film substrate production process equipment installation,debugging and commissioning
-
5.1 General requirements
-
5.2 Magnetic sputtering deposition system
-
5.3 Vacuum evaporative copper-coated machine
-
5.4 Chemical vapor deposition system
-
5.5 Spin coating and hot plate system
-
5.6 Exposure machine
-
5.7 Developing system
-
5.8 Reactive ion etching machine
-
5.9 Chemical mechanical polishing machine
-
6 Installation,debugging and commissioning of assembling and packaging process equipment
-
6.1 General requirements
-
6.2 Die attaching machine
-
6.3 Die eutectic bonder
-
6.4 Eutectic oven
-
6.5 Wire bonder
-
6.6 Flip chip bonder
-
6.7 Plasma cleaner
-
6.8 Selective spray coating machine
-
6.9 Parallel seam welder
-
6.10 Energy storage welder
-
6.11 Laser welder
-
7 Installation,debugging and commissioning of process inspection equipment
-
7.1 General requirements
-
7.2 Probe tester
-
7.3 Acoustic scanner
-
7.4 3D optical profiler
-
7.5 Automatic optical inspector
-
7.6 Laser thickness gauge
-
7.7 X-ray scanner
-
7.8 Chip shearing/wire pulling tester
-
8 Engineering acceptance
-
8.1 General requirements
-
8.2 Handover acceptance
-
8.3 Completed acceptance
-
8.4 Disposal of reject
-
Appendix A Record forms of acceptance for micro-assembling production line process equipment installation engineering
-
Explanation of wording in this code
-
List of quoted standards