GB 50197-2015 GB 50197-2015煤炭工业露天矿设计规范:英文 - 工标库
由工标库AI生成
查看更多
GB 50197-2015 GB 50197-2015煤炭工业露天矿设计规范:英文现行
收藏
-
中华人民共和国住房和城乡建设部公告
-
Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
-
Foreword
-
1 General provisions
-
2 Basic requirements
-
2.1 Mining limits
-
2.2 Resources/reserves
-
2.3 Designed production capacity
-
2.4 Mode of development and haulage and mining procedures
-
3 Mining technology
-
3.1 General requirements
-
3.2 Intermittent mining technology
-
3.3 Continuous mining technology
-
3.4 Semi-continuous mining technology
-
3.5 Dragline casting mining technology
-
3.6 Other mining technology
-
3.7 Blasting hole drilling and blasting
-
4 Internal transportation
-
4.1 General requirements
-
4.2 Truck haulage
-
4.3 Belt conveying
-
4.4 Railroad transportation
-
5 Dump
-
5.1 General requirements
-
5.2 Size of dumping face
-
5.3 Dumping method and equipment selection
-
6 Slope stability engineering
-
7 Groundwater control
-
7.1 General requirements
-
7.2 Method of groundwater control
-
7.3 Hydrogeological calculation
-
7.4 Equipment and affiliated facilities
-
7.5 Filter
-
8 Water prevention and drainage
-
8.1 Drainage in excavation site
-
8.2 Surface water prevention and drainage
-
9 Coal handling system
-
9.1 Production capacity
-
9.2 Crushing
-
9.3 Coal storage
-
9.4 Loading
-
10 General layout
-
10.1 General layout of open-pit mine
-
10.2 General layout of mine service facilities
-
10.3 Vertical design and flood control and drainage
-
10.4 Mine service facilities road
-
10.5 Compr ehensive layout of pipelines
-
11 Maintenance of mechanical and electrical equipment
-
11.1 General requir ements
-
11.2 Maintenance of mechanical equipment
-
11.3 Maintenance of electrical equipment
-
11.4 War ehouses
-
12 Power supply and distribution
-
12.1 General requir ements
-
12.2 Source of power supply
-
12.3 Selection of voltage,quality of power supply and reactive power compensation
-
12.4 Power load
-
12.5 Power distribution on surface
-
12.6 Power distribution to excavation site and dump
-
12.7 Power distribution of dewatering and pumping equipment
-
12.8 Power distribution to production system and affiliated facilities
-
12.9 Power supply of electric traction
-
12.10 Over voltage and grounding
-
13 Information and automation
-
13.1 General requir ements
-
13.2 Production monitoring
-
13.3 Information management
-
13.4 Communication
-
13.5 Cable TV system
-
13.6 Railroad signal
-
14 Buildings on surface,water supply and drainage
-
14.1 General requir ements
-
14.2 Crushing station
-
14.3 Head station(drive station,transfer station),distributing station
-
14.4 Trestle or underpass of belt conveyor
-
14.5 Stockyard of run-of-mine coal
-
14.6 Administration and public buildings
-
14.7 Water source
-
14.8 Water supply
-
14.9 Fire fighting
-
14.10 Drainage
-
14.11 Heating
-
14.12 Ventilation
-
14.13 Heat supply
-
15 Energy conservation,emission-reduction and comprehensive utilization
-
15.1 General requir ements
-
15.2 Energy conservation in development and mining
-
15.3 Energy conservation in power supply and distribution
-
15.4 Energy conservation in general layout and transportation
-
15.5 Energy conservation in architecture
-
15.6 Energy conservation in water supply and drainage and heat supply and ventilation
-
15.7 Emission reduction and compr ehensive utilization
-
16 Environment protection
-
16.1 General requir ements
-
16.2 Pollution control
-
16.3 Reclamation and water and soil conser vation
-
Appendix A Classification of resources/reservesof solid mineral
-
Appendix B Indexes for estimation of coal resources
-
Appendix C Classification and calculation of resources/reserves in prefeasibility study,feasibility study and preliminary design
-
C.1 Classification and calculation of resour ces/reser ves in pre-feasibility study based on preliminary exploration geological report
-
C.2 Classification and calculation of resources/reserves in pre-feasibility study based on detailed exploration geological report
-
C.3 Classification and calculation of resources/reserves in feasibility study and preliminary design based on detailed exploration geological report
-
Explanation of wording in thiscode
-
List of quoted standards