GB/T 51126-2015 GB/T 镀分复用(WDM)光纤传输系统工程验收规范:英文 - 工标库
由工标库AI生成
查看更多
GB/T 51126-2015 GB/T 镀分复用(WDM)光纤传输系统工程验收规范:英文现行
收藏
-
Announcement of the Ministry of Housing and Urban-Rural Development of the People s Republic of China
-
Foreword
-
1 General Provisions
-
2 Terms and Symbols
-
3 Equipment Installation(Cable Duct,Cable Rack)
-
3.1 General Requirements
-
3.2 Installation of Cable Duct and Cabling Rack
-
3.3 Equipment Frame and Subframe Installation
-
3.4 Network Management Equipment Installation
-
3.5 Cable Laying and Terminating
-
4 Function Check and Performance Testing of Equipment
-
4.1 Power and Equipment Function Check
-
4.2 OMU Performance Testing
-
4.3 ODU Performance Testing
-
4.4 Comb Filter Performance Testing
-
4.5 OADM Performance Testing
-
4.6 OTU Performance Testing
-
4.7 T-MUX Performance Testing
-
4.8 OLA Performance Testing
-
4.9 OSA Performance Testing
-
4.10 OSC Performance Testing
-
5 Performance Testing and Function Check of the WDM System
-
5.1 System Performance Testing
-
5.2 System Function Check
-
5.3 Auxiliary Function Check
-
5.4 Network Management Function Check
-
6 As-built Document
-
7 Acceptance
-
7.1 Preliminary Acceptance
-
7.2 Trial Run
-
7.3 Final Acceptance
-
Appendix A Testing Record Samples
-
Explanation of Wording in This Code