GB/T 51033-2024 水利泵站施工及验收规范:英文 - 工标库
由工标库AI生成
查看更多
GB/T 51033-2024 水利泵站施工及验收规范:英文现行
收藏
-
NOTICE
-
Introduction to English Version
-
Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
-
Foreword
-
1 General provisions
-
2 Construction layout
-
2.1 General requirements
-
2.2 Methods and requirements of construction layout
-
3 Construction survey
-
3.1 General requirements
-
3.2 Construction control network survey
-
3.3 Construction setting-out
-
3.4 Completion survey
-
4 Foundation construction
-
4.1 General requirements
-
4.2 Foundation pit drainage
-
4.3 Foundation pit excavation
-
4.4 Foundation treatment
-
4.5 Foundation treatment of special soil
-
4.6 Foundation strengthening
-
5 Pump house construction
-
5.1 General requirements
-
5.2 Pump house bottom plate
-
5.3 Flow passage
-
5.4 Structure of pump house
-
5.5 Architectural and decoration works of pump house
-
5.6 Strengthening and retrofitting of pump house
-
6 Construction of inlet and outlet structures
-
6.1 General requirements
-
6.2 Approach channel
-
6.3 Forebay and inlet sump
-
6.4 Outlet pipe foundation and structures
-
6.5 Discharge chamber and pressure tank
-
6.6 Strengthening and retrofitting of inlet and outlet structures
-
7 Construction of other types of pumping stations
-
7.1 Shaft pumping station
-
7.2 Cable car type pumping station
-
7.3 Pontoon-type pumping station
-
7.4 Submersible pumping station
-
8 Construction under special weather conditions
-
8.1 General requirements
-
8.2 Construction in cold weather
-
8.3 Construction in hot weather
-
8.4 Construction in rainy season
-
8.5 Construction under catastrophic weather
-
9 Installation of monitoring facilities and observation during construction period
-
9.1 Installation of monitoring facilities
-
9.2 Observation during construction
-
10 Installation and testing of steel structures
-
10.1 General requirements
-
10.2 Installation of embedded parts
-
10.3 Installation of vertical lift gate and flap gate
-
10.4 Installation of trash rack and trash remover
-
10.5 Hoist installation
-
10.6 Testing on steel structures and equipment
-
10.7 Strengthening and retrofitting of steel structures
-
11 Quality control
-
11.1 General requirements
-
11.2 Concrete quality test and defect treatment
-
12 Construction acceptance of pumping station
-
Appendix A Soil replacement method
-
Appendix B Mixing pile method
-
Appendix C Grouting method
-
Appendix D Pile foundation
-
Appendix E Dynamic compaction method and extrusion method
-
Appendix F Caisson foundation
-
Appendix G Masonry works
-
Appendix H Allowable installation deviation of plane gate embedded parts
-
Appendix J Allowable installation deviation of mobile hoist
-
Explanation of wording in this standard
-
List of quoted standards