GB 50996-2014 GB 50996-2014地下水封石洞库施工及验收规范:英文 - 工标库
由工标库AI生成
查看更多
GB 50996-2014 GB 50996-2014地下水封石洞库施工及验收规范:英文现行
收藏
-
中华人民共和国住房和城乡建设部公告
-
Announcement of the Ministry of Housing and Urban-Rural Development of the People’s Republic of China
-
Foreword
-
1 General provisions
-
2 Terms
-
3 Basic requirements
-
4 Construction preparations
-
4.1 Construction investigation
-
4.2 Technical preparations
-
4.3 Sites and temporary works
-
4.4 Materials preparation
-
5 Construction survey
-
5.1 General requirements
-
5.2 Ground surface control survey
-
5.3 Underground control survey
-
5.4 Cross-section survey
-
5.5 Breakthrough survey
-
5.6 Storage capacity survey
-
6 Geological prediction
-
7 Open channels,open tunnels and tunnel portal sections
-
7.1 Open channels
-
7.2 Open tunnels
-
7.3 Tunnel portal section
-
7.4 Quality acceptance
-
8 Excavation
-
8.1 General requirements
-
8.2 Excavation methods
-
8.3 Drilling and blasting
-
8.4 Quality acceptance
-
9 Muck loading,unloading and transportation
-
9.1 General requirements
-
9.2 Muck loading,unloading and transportation
-
9.3 Quality acceptance
-
10 Supporting
-
10.1 General requirements
-
10.2 Anchor bolts and cables
-
10.3 Shotcrete
-
10.4 Metal meshes
-
10.5 Steel arches
-
10.6 Lining
-
10.7 Pre-consolidation
-
10.8 Quality acceptance
-
11 Water curtain system
-
11.1 General requirements
-
11.2 Construction
-
11.3 Water supply to water curtain system
-
11.4 Quality acceptance
-
12 Shaft construction
-
12.1 General requirements
-
12.2 Excavation
-
12.3 Supporting
-
12.4 Quality acceptance
-
13 Grouting
-
13.1 General requirements
-
13.2 Grouting operations
-
13.3 Grouting effect inspection
-
13.4 Quality acceptance
-
14 Ventilation,dust control,compressed-air supply,water supply and power supply
-
14.1 Ventilation and dust control
-
14.2 Compressed-air supply
-
14.3 Water supply
-
14.4 Power supply
-
15 Drainage
-
15.1 General requirements
-
15.2 Construction
-
16 Shaft equipment and pipeline installation
-
16.1 General requirements
-
16.2 Shaft lifting system
-
16.3 Fabrication and installation of shaft steel structure
-
16.4 Coating work
-
16.5 Installation of anchor plate,casing pipe support and shaft-bottom cylinder
-
16.6 Welding,lifting and installation of casing pipe
-
16.7 Installation of inner pipe,pump and auxiliary devices
-
16.8 Quality acceptance
-
17 Paving and plugging
-
17.1 Paving
-
17.2 Plugging
-
17.3 Quality acceptance
-
18 Monitoring and measurement
-
18.1 General requirements
-
18.2 Measurement items and methods
-
18.3 Processing and feedback of measurement data
-
19 Safety,environment and health
-
20 Project delivery and acceptance
-
20.1 General requirements
-
20.2 Division of construction quality acceptance units
-
20.3 Project construction quality acceptance
-
20.4 Procedure and organization of project construction quality acceptance
-
Appendix A Main construction methods of underground water-sealing storage cavern
-
Appendix B Test and water supply of water curtain system
-
Explanation of wording in this code
-
List of quoted standards