GB 50179-2015 河流流量测验规范:英文 - 工标库
由工标库AI生成
查看更多
GB 50179-2015 河流流量测验规范:英文现行
收藏
-
NOTICE
-
Introduction to English version
-
Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
-
Foreword
-
1 General provisions
-
2 Selection of measuring reach and setting-up of cross-section
-
2.1 Selection and survey of measuring reach
-
2.2 Layout of measuring cross-section
-
3 Cross-section measurement
-
3.1 Possible maximum cross-section measurement
-
3.2 Channel cross-section measurement
-
3.3 Error sources and control
-
4 Stage gradation and means and methods of discharge measurement
-
4.1 General requirements
-
4.2 Selection of measurement means
-
4.3 Selection of measurement methods
-
4.4 Gradation of stage(discharge)
-
4.5 Measurement of high flood discharge
-
4.6 Discharge measurement in dry period
-
4.7 Discharge measurement in icy period
-
4.8 Tidal discharge measurement
-
5 Check and analysis of discharge measurement results
-
5.1 Check items and methods
-
5.2 Check and analysis
-
6 Assessment of discharge measurement accuracy
-
6.1 General requirements
-
6.2 Error sources and control
-
6.3 Assessment of discharge measurement accuracy
-
Appendix A Methods for accuracy classification of basic hydrometric stations
-
Appendix B Current meter method
-
B.1 General requirements
-
B.2 Layout of flow velocity-measuring verticals
-
B.3 Flow velocity measurement
-
B.4 Flow direction deflection angle measurement
-
B.5 Other observation
-
B.6 Check and maintenance of current meter
-
B.7 Calculation of measured discharge
-
B.8 Width measurement and sounding methods of cross-section
-
B.9 Correction method of deflection angle of suspension cable
-
B.10 Method of determining gauging cross-section direction
-
B.11 Error test and uncertainty estimation
-
B.12 Permissible error of discharge measurement and selection of discharge measurement scheme
-
Appendix C Float method
-
C.1 General requirements
-
C.2 Surface float method
-
C.3 Deep-water float method and float rod method
-
C.4 Small float method
-
C.5 Other observation
-
C.6 Test and determination of float coefficient
-
C.7 Measured discharge calculation
-
C.8 Uncertainty estimation
-
Appendix D Format of discharge measurement table and filling instructions
-
D.1 Table preparation
-
D.2 Filling instructions
-
Appendix E Table of deflection angle correction of suspension cable
-
Explanation of wording in this code
-
List of quoted standards