GB 51105-2015 GB 51105-2015挤压钢管工程设备与安装与验收规范:英文 - 工标库
由工标库AI生成
查看更多
GB 51105-2015 GB 51105-2015挤压钢管工程设备与安装与验收规范:英文现行
收藏
-
Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
-
Foreword
-
1 General Provisions
-
2 Basic Requirements
-
3 Equipment Foundation,Anchor Bolt and Base Plate
-
3.1 Equipment Foundation Construction
-
3.2 Inspection and Acceptance of Equipment Foundation
-
3.3 Erection of Anchor Bolts
-
3.4 Inspection and Acceptance of Anchor Bolts
-
3.5 Erection of Base Plates
-
3.6 Inspection and Acceptance of Base Plates
-
4 Equipment and Materials Mobilization
-
4.1 General Requirements
-
4.2 Inspection and Acceptance of Equipment and Materials
-
5 Equipment of Pipe Billet Preparation Section
-
5.1 Installation of Short/Long Band Sawing Machine
-
5.2 Inspection and Acceptance of Short/Long Band Sawing Machine
-
5.3 Installation of Peeler
-
5.4 Inspection and Acceptance of Peeler
-
5.5 Installation of Facing Machine
-
5.6 Inspection and Acceptance of Facing Machine
-
5.7 Installation of Center Hole Drilling Machine
-
5.8 Inspection and Acceptance of Center Hole Drilling Machine
-
5.9 Installation of Deep Hole Drilling Machine
-
5.10 Inspection and Acceptance of Deep Hole Drilling Machine
-
5.11 Test-run of Equipment of Pipe Billet Preparation Section
-
6 Punching and Expanding Press
-
6.1 Installation of Base
-
6.2 Inspection and Acceptance of Base
-
6.3 Installation of Machine Frame
-
6.4 Inspection and Acceptance of Machine Frame
-
6.5 Installation of Upsetting Beam/Piercing Beam
-
6.6 Inspection and Acceptance of Upsetting Beam/Piercing Beam
-
6.7 Installation of Container
-
6.8 Inspection and Acceptance of Expanding Container
-
6.9 Installation of Manipulator
-
6.10 Inspection and Acceptance of Manipulator
-
6.11 Installation of Glass Powder Lubrication Table
-
6.12 Inspection and Acceptance of Glass Powder Lubrication Table
-
6.13 Test-run of Punching and Expanding Press
-
7 Extrusion Press
-
7.1 Installation of Base Board
-
7.2 Inspection and Acceptance of Base Board
-
7.3 Installation of Front and Back Beams
-
7.4 Inspection and Acceptance of Front and Back Beams
-
7.5 Installation of Pre-tensioned Column
-
7.6 Inspection and Acceptance of Pre-tensioned Column
-
7.7 Installation of Extrusion Beam
-
7.8 Inspection and Acceptance of Extrusion Beam
-
7.9 Installation of Piercing Beam
-
7.10 Inspection and Acceptance of Piercing Beam
-
7.11 Installation of Container
-
7.12 Inspection and Acceptance of Extrusion Container
-
7.13 Installation of Manipulator
-
7.14 Inspection and Acceptance of Manipulator
-
7.15 Installation of Main Hydraulic Cylinder
-
7.16 Inspection and Acceptance of Main Hydraulic Cylinder
-
7.17 Installation of Glass Powder Lubrication Table
-
7.18 Inspection and Acceptance of Glass Powder Lubrication Table
-
7.19 Test-run of Extrusion Press
-
8 Auxiliary Equipment of Extrusion Line
-
8.1 Installation of Charging Unit and Pipe Billet Cleaning Unit
-
8.2 Inspection and Acceptance of Charging Unit and Pipe Billet Cleaning Unit
-
8.3 Installation of Conveying Roller Table
-
8.4 Inspection and Acceptance of Conveying Roller Table
-
8.5 Inspection of Induction Heating Furnace
-
8.6 Inspection and Acceptance of Induction Heating Furnace
-
8.7 Installation of High-pressure Descaling Unit
-
8.8 Inspection and Acceptance of High-pressure Descaling Unit
-
8.9 Installation of Quenching Tank
-
8.10 Inspection and Acceptance of Quenching Tank
-
8.11 Installation of Chain Type Cooling Bed
-
8.12 Inspection and Acceptance of Chain Type Cooling Bed
-
8.13 Test-run of Auxiliary Equipment of Extrusion Line
-
9 Rotary Heating Furnace
-
9.1 Installation of Furnace Steel Structure
-
9.2 Inspection and Acceptance of Furnace Steel Structure
-
9.3 Installation of Feeding and Tapping Roller Table
-
9.4 Inspection and Acceptance of Feeding and Tapping Roller Table
-
9.5 Installation of Backup Rollers and Guide Rollers
-
9.6 Inspection and Acceptance of Backup Rollers and Guide Rollers
-
9.7 Erection of Rotating Steel Platform
-
9.8 Inspection and Acceptance of Rotating Steel Platform
-
9.9 Installation of Trolley
-
9.10 Inspection and Acceptance of Trolley
-
9.11 Erection of Furnace Shell
-
9.12 Inspection and Acceptance of Furnace Shell
-
9.13 Installation of Furnace Door and Lifting Units
-
9.14 Inspection and Acceptance of Furnace Door and Lifting Units
-
9.15 Test-run of Rotary Heating Furnace
-
10 Finishing Line Equipment
-
10.1 Installation of Pressure Straightener
-
10.2 Inspection and Acceptance of Pressure Straightener
-
10.3 Installation of Inclined Roller Straightener
-
10.4 Inspection and Acceptance of Inclined Roller Straightener
-
10.5 Installation of Pipe Cutting Band Sawing Machine
-
10.6 Inspection and Acceptance of Pipe Cutting Band Sawing Machine
-
10.7 Installation of Shot Blasting Machine
-
10.8 Inspection and Acceptance of Shot Blasting Machine
-
10.9 Installation of Tube Rolling Mill
-
10.10 Inspection and Acceptance of Tube Rolling Mill
-
10.11 Installation of Measuring and Weighing Marking Device
-
10.12 Inspection and Acceptance of Measuring and Weighing Marking Device
-
10.13 Installation of Ultrasonic Flaw-detecting Device
-
10.14 Inspection and Acceptance of Ultrasonic Flaw-detecting Device
-
10.15 Installation of Eddy Flaw-detecting Device
-
10.16 Inspection and Acceptance of Eddy Flaw-detecting Device
-
10.17 Installation of Steel Pipe Exterior Surface Polisher
-
10.18 Inspection and Acceptance of Steel Pipe Exterior Surface Polisher
-
10.19 Installation of Roller-hearth Solution Heat Furnace
-
10.20 Inspection and Acceptance of Roller-hearth Solution Heat Furnace
-
10.21 Test-run of Finishing Line Equipment
-
11 Safety and Environmental Protection
-
11.1 Safety
-
11.2 Environmental Protection
-
Appendix A Classification Table of Subproject and Sub-divisional Work for Extrusion Steel Pipe Production Line Engineering Equipment Installation
-
Appendix B Quality Acceptance Record for Sub-divisional Work of Extrusion Steel Pipe Production Line Engineering Equipment Installation
-
Appendix C Quality Acceptance Record for Subproject of Extrusion Steel Pipe Production Line Engineering Equipment Installation
-
Appendix D Quality Acceptance Record for Unit Work of Extrusion Steel Pipe Production Line Engineering Equipment Installation
-
Appendix E Non-load Test-run Record for Extrusion Steel Pipe Production Line Engineering Equipment
-
Explanation of Wording in This Code
-
List of Quoted Standards