GB 50992-2014 石油化工工程地震破坏鉴定标准:英文现行
收藏
-
中华人民共和国住房和城乡建设部公告
-
Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
-
Foreword
-
1 General provisions
-
2 Terms
-
3 Basic requirements
-
4 Site and soil foundation
-
5 Processing equipment
-
5.1 Industry furnace
-
5.2 Vertical vessel
-
5.3 Vertical storage tank
-
5.4 Gas holder
-
5.5 Spherical tank
-
5.6 Heat-exchange equipment and horizontal vessel
-
5.7 Air cooler
-
5.8 Reaction kettle equipment
-
5.9 Chlorin-alkali electrolysis equipment
-
6 Process piping
-
6.1 Non-buried piping
-
6.2 Buried piping
-
7 General machinery
-
7.1 Machine equipment
-
7.2 Compressor
-
8 Power and dynamic equipment
-
8.1 Boiler
-
8.2 Turbine,flue gas expander
-
8.3 Generator,electric motor
-
9 Chemical fibre equipment
-
9.1 Chemical fibre machine
-
9.2 Spinning machine
-
9.3 Pelletizer
-
9.4 Tension film machine
-
9.5 Wiredrawing
-
9.6 Braider
-
9.7 Compress
-
10 Instrument,apparatus and computer(control)system
-
10.1 Site instrument
-
10.2 Indoor instrument and control system
-
10.3 Apparatus of laboratory and labouratory
-
10.4 Computer(control)system
-
11 Electric and telecomunication equipment
-
11.1 Power transformer and petersen coil
-
11.2 Reactor
-
11.3 Oil switch and lightning arrester
-
11.4 Power capacitor,disconnecting switch,stick insulator,current(voltage)transformer
-
11.5 Battery pack
-
11.6 High-voltageswitch gear,low-voltage distribution pane,control(protective)panel,DC system panel and distributing box
-
11.7 Power cable,communication line and overhead line
-
11.8 Telecomunications equipments
-
12 Building
-
12.1 Masonry building
-
12.2 Reinforced concrete building
-
12.3 Inner frame and bottom-frame building
-
12.4 Steel and reinforced concrete bent structure building
-
12.5 Single-storey frame-bent brick column structure building
-
13 Other special structures
-
13.1 Frame-bent structure
-
13.2 Piperack,pipesleeper
-
13.3 Shaft tower structure
-
13.4 Water tank
-
13.5 Cooling tower
-
13.6 Pelletizing tower
-
13.7 Chimney
-
13.8 Reinforced concrete silo
-
14 Onshore drilling platform
-
14.1 Drilling equipment
-
14.2 Drilling contents equipment set
-
14.3 Well control device
-
14.4 Well hole
-
15 Offshore platform
-
15.1 Stationary platform
-
15.2 Bottom founded rig
-
15.3 Jackup rig
-
15.4 The main equipment
-
16 Ground production facilities
-
16.1 Beam pumping unit
-
16.2 Blue elephant
-
16.3 Oil wellhead assembly
-
16.4 Gas wellhead assembly
-
Appendix A Estimate of direct economic loss for earthquake destruction in petrochemical engineering
-
Explanation of wording in this standard