GB 50071-2014 GB 50071-2014小型水力发电站设计规范:英文现行
收藏
-
中华人民共和国住房和城乡建设部公告
-
Introduction to English Version
-
Foreword
-
1 General Provisions
-
2 Hydrology
-
2.1 General Requirements
-
2.2 Runoff
-
2.3 Flood
-
2.4 Rating Curve
-
2.5 Sediment,Evaporation,Ice Regime
-
2.6 Automatic Hydrological Telemetry System
-
3 Engineering Geology Investigation
-
3.1 General Requirements
-
3.2 Regional Geology
-
3.3 Engineering Geology of Reservoirs
-
3.4 Engineering Geology of Hydraulic Structures
-
3.5 Natural Construction Material
-
4 Computation of Water and Hydropower
-
4.1 General Requirements
-
4.2 Computation of Runoff Regulation
-
4.3 Flood Regulation and Selection of Characteristic Flood-Control Levels
-
4.4 Selection of Normal Water Level and Dead Water Level
-
4.5 Selection of Installed Capacity and Type of Hydropower Unit
-
4.6 Selection of Dimensions of Power Waterway and Volume of Daily Regulation Pool
-
4.7 Analysis of Reservoir Sedimentation and Backwater Computation
-
4.8 Reservoir Operation Mode and Operational Characteristics over Multiple Years
-
5 Layout of Project and Hydraulic Structures
-
5.1 General Requirements
-
5.2 General Layout of Project
-
5.3 Water Retaining Structure
-
5.4 Water Release Structure
-
5.5 Water Conveyance Structure
-
5.6 Powerhouse and Switchyard
-
5.7 Structures for Navigation
-
5.8 Safety Monitoring Instrumentation
-
6 Hydraulic Machinery,Heating and Ventilation
-
6.1 Selection of Turbine and Generator
-
6.2 Speed Governing System and Transient Analysis
-
6.3 Cooling Water Supply and Drainage System
-
6.4 Compressed Air System
-
6.5 Oil System
-
6.6 Hydraulic Monitoring System
-
6.7 Ventilation
-
6.8 Overhead Crane
-
6.9 Arrangement of Equipment
-
6.10 Repair Equipment
-
7 Electrical System
-
7.1 Access into Grid
-
7.2 Main Electrical Connection
-
7.3 Auxiliary Power Supply in Powerhouse and at Dam Site
-
7.4 Over Voltage Protection and Grounding Device
-
7.5 Lighting
-
7.6 Arrangement of Electrical Equipment
-
7.7 Cable Selection and Installation
-
7.8 Relay Protection and Safety Automatic Devices
-
7.9 Automatic Control System
-
7.10 Electrical Measurement and Instrument Device
-
7.11 Power Source for Operation
-
7.12 Video Monitoring System
-
7.13 Communication
-
7.14 Electrical Repairing and Testing
-
8 Hydromechanical Structures
-
8.1 General Requirements
-
8.2 Sluice Gate and Hoisting Device
-
8.3 Gates,Trash Rack and Hoisting Device for Power Waterway
-
9 Fire Protection
-
10 Construction Planning
-
10.1 General Requirements
-
10.2 Construction Diversion
-
10.3 Selection of Borrow and Quarry Areas
-
10.4 Construction of Main Works
-
10.5 Access and Onsite Transportation
-
10.6 Construction Facilities
-
10.7 General Layout of Construction
-
10.8 Master Schedule of Construction
-
11 Land Requisition and Resettlement
-
11.1 General Requirements
-
11.2 Scope and Standard of Land Requisition
-
11.3 Inventory of Physical Property
-
11.4 Rural Resident Relocation
-
11.5 Mitigation of Impacts on Towns
-
11.6 Handling of Specific Items
-
11.7 Cleaning of Reservoir Area
-
11.8 Implementation Planning
-
11.9 Compensation for Land Requisition and Resettlement
-
12 Environmental Protection
-
12.1 General Requirements
-
12.2 Environmental Impact Assessment and Protection
-
13 Soil and water Conservation
-
13.1 General Requirements
-
13.2 Soil and Water Conservation
-
14 Project Management
-
14.1 General Requirements
-
14.2 Project Management Scope and Protection Scope
-
14.3 Operation of Project
-
15 Energy Conservation
-
16 Labor Safety and Industrial Sanitation
-
17 Cost Estimation of Project
-
18 Economic Evaluation
-
Explanation of Wording in This Code
-
List of Quoted Standards