Announcement of Ministry of Construction of the People s Republic of China
-
Foreword
-
1 General Provisions
-
2 Basic Requirements
-
3 Equipment Foundation,Foundation Bolt and Base Plate
-
3.1 General Requirements
-
3.2 Equipment Foundation
-
3.3 Foundation Bolt
-
3.4 Base Plate
-
4 Equipment and Material Mobilization
-
4.1 General Requirements
-
4.2 Equipment
-
4.3 Raw Materials
-
5 Installation of Converter
-
5.1 General Requirements
-
5.2 Trunnion Bearing Pedestal
-
5.3 Backing Ring
-
5.4 Furnace Body
-
5.5 Tilting Device
-
5.6 Removable Guard Board and Fixed Guard Board
-
6 Installation of Oxygen Lance and Sublance
-
6.1 General Requirements
-
6.2 Oxygen Lance,Sublance and Lifting Device
-
6.3 Cross travelling device
-
6.4 Rotating Device
-
6.5 Nitrogen Sealing Device
-
6.6 Probe Mounting Machine and Pulling Machine
-
7 Installation of Hood
-
7.1 General Requirements
-
7.2 Skirt
-
7.3 Removable Hood
-
8 Installation of Waste Heat Boiler(Vaporization Cooling Device)
-
8.1 General Requirements
-
8.2 Flue
-
8.3 Boiler Barrel
-
8.4 Piping for Steam and Water Systems
-
8.5 Heat Accumulator
-
8.6 Deoxidization Water Tank
-
9 Installation of Electric Arc Furnace
-
9.1 General Requirements
-
9.2 Rail Chair
-
9.3 Cradle
-
9.4 Tilting Device
-
9.5 Tilting Locking Device
-
9.6 Furnace Body
-
9.7 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism
-
9.8 Electrode Lifting Mechanism and Electrode Clamping Mechanism
-
9.9 Oxygen Lance
-
10 Installation of Ladle Refining Furnace(LF)
-
10.1 General Requirements
-
10.2 Track for Buggy Ladle
-
10.3 Buggy Ladle
-
10.4 Furnace Cover and Furnace Cover Lifting Mechanism
-
10.5 Electrode Lifting Mechanism and Electrode Clamping Mechanism
-
10.6 Argon Gas Stirrer
-
10.7 Temperature Measuring and Sampling Device
-
11 Installation of Vacuum Ladle Refining Furnace(VD)and Vacuum Oxygen Decarburization Converter(VOD)
-
11.1 General Requirements
-
11.2 Vacuum Tank
-
11.3 Track for Vacuum Tank Car
-
11.4 Vacuum Tank Car
-
11.5 Vacuum Tank Cap and Tank Cap Lifting Mechanism
-
11.6 Temperature Measuring and Sampling Device
-
11.7 Vacuum Device
-
11.8 Oxygen Lance(Vacuum Oxygen Decarburization Converter(VOD))
-
12 Installation of Recirculation Vacuum Degassing Refining Furnace(RH)
-
12.1 General Requirements
-
12.2 Track for Buggy Ladle
-
12.3 Buggy Ladle
-
12.4 Track for Vacuum Degassing Chamber Car
-
12.5 Vacuum Degassing Chamber and Degassing Chamber Car
-
12.6 Vacuum Device
-
12.7 Ladle Lifting Device
-
12.8 Preheating Device for Vacuum Degassing Chamber
-
13 Installation of Argon Oxygen Decarburization Refining Furnace(AOD)
-
13.1 General Requirements
-
13.2 Trunnion Bearing Pedestal
-
13.3 Backing Ring
-
13.4 Furnace Body
-
13.5 Tilting Device
-
13.6 Removable Guard Board and Fixed Guard Board
-
14 Installation of Casting Equipment
-
14.1 General Requirements
-
14.2 Ladle Turret
-
14.3 Tundish Car and Track
-
14.4 Roaster
-
15 Installation of Continuous Steel-casting Equipment
-
15.1 General Requirements
-
15.2 Mold and Vibrating Device
-
15.3 Secondary Cooling Device
-
15.4 Exchange Device for Segment
-
15.5 Withdrawal and Straightening Unit
-
15.6 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device
-
15.7 Flame Cutting Machine
-
15.8 Rocking Shear
-
15.9 Crop Collecting Device
-
15.10 Burring Machine
-
16 Installation of Discharging and Finishing Equipment
-
16.1 General Requirements
-
16.2 Conveying Roller Table
-
16.3 Turntable
-
16.4 Pusher,Puller and Tilter
-
16.5 Scarfer
-
16.6 Lifting Guard Board and Marking Punch
-
16.7 Cross Travelling Trolley
-
16.8 Centering Device
-
17 Installation of Hot Metal Mixer
-
17.1 General Requirements
-
17.2 Base and Race
-
17.3 Furnace Shell and Tension Sleeve
-
17.4 Tilting Device
-
17.5 Cover Manipulating Winch
-
18 Installation of Hot Metal Pretreatment Equipment
-
18.1 General Requirements
-
18.2 Desulfurizer(Dephosphorizer)Conveying Device
-
18.3 Stirring Desulfurization Equipment
-
18.4 Dephosphorization Spray Gun
-
18.5 Molten Iron Tank Car
-
18.6 Track for Molten Iron Tank Car
-
18.7 Slag remover
-
19 Installation of Raw Material System
-
19.1 General Requirements
-
19.2 Weighing Funnel
-
19.3 Collecting Funnel and Rotating Funnel
-
20 Installation of Gas Purification Device
-
20.1 General Requirements
-
20.2 Gas Purification Device
-
21 Test Run of Steel-making Mechanical Equipment
-
21.1 General Requirements
-
21.2 Test Run of Converter
-
21.3 Test Run of Oxygen Lance and Sublance
-
21.4 Test Run of Hood
-
21.5 Test Run of Waste Heat Boiler System
-
21.6 Test Run of Electric Arc Furnace
-
21.7 Test Run of Ladle Refining Furnace(LF)
-
21.8 Test Run of Vacuum Ladle Refining Furnace(VD)and Vacuum Oxygen Decarburization Converter(VOD)
-
21.9 Test Run of Recirculation Vacuum Degassing Refining Furnace(RH)
-
21.10 Test Run of Argon Oxygen Decarburization Refining Furnace(AOD)
-
21.11 Test Run of Casting equipment
-
21.12 Test Run of Continuous Steel-casting Equipment
-
21.13 Test Run of Discharging and Finishing Equipment
-
21.14 Test Run of Hot Metal Mixer
-
21.15 Test Run of Hot Metal Pretreatment Equipment
-
Appendix A Record of Quality Acceptance for Subdivisional Works of Installation of Steel-making Mechanical Equipment
-
Appendix B Record of Quality Acceptance for Sub-unit Works of Installation of Steel-making Mechanical Equipment
-
Appendix C Record of Quality Acceptance for Unit Works of Installation of Steel-making Mechanical Equipment
-
Appendix D Record of No-load Test Run of Steel-making Mechanical Equipment
-
Appendix E Criteria for Appearance Quality of Weld
-
Appendix F Postweld Heat Treatment of Welded Joint
-
Explanation of Wording in This Code