GB 50233-2014 110kV~750KV架空输电线路施工及验收规范 - 工标库
由工标库AI生成
查看更多
GB 50233-2014 110kV~750KV架空输电线路施工及验收规范现行
收藏
-
中华人民共和国住房和城乡建设部公告
-
Announcement of Ministry of Housing and Urban-Rural Development of the Peoples Republic of China
-
Foreword
-
1 General Provisions
-
2 Terms
-
3 Inspections and Tests on Raw Materials and Equipment
-
4 Surveying
-
5 Earthwork
-
6 Foundation Engineering
-
6.1 General Requirements
-
6.2 Cast-in-site Foundation
-
6.3 Cast-in-site Pile Foundation
-
6.4 Concrete Pole Foundation and Precast Concrete Foundation
-
6.5 Rock Foundation
-
6.6 Construction in Winter/Rainy Season and High Temperature
-
6.7 Foundation Construction in Permafrost Area
-
7 Towers and Poles Erection
-
7.1 General Requirements
-
7.2 Steel Towers
-
7.3 Concrete Pole
-
7.4 Steel Tube Pole
-
7.5 Guy Wire
-
8 Erection and Stringing Lines Engineering
-
8.1 General Requirements
-
8.2 Tension Stringing
-
8.3 Non-tension Stringing
-
8.4 Connection
-
8.5 Stringing
-
8.6 Accessories Installation
-
8.7 Stringing of Optical Fiber Composite Overhead Ground Wire
-
9 Earthing Engineering
-
10 Acceptance and Hand-over
-
10.1 Acceptance
-
10.2 As-built Test
-
10.3 Completion Transfer
-
Appendix A Requirement of Safety Clearance
-
Explanation of Wording in This Code
-
List of Quoted Standards