Announcement of the Ministry of Construction of the People s Republic of China
-
Foreword
-
1 General Provisions
-
2 Basic Requirement
-
3 Equipment Foundation,Anchor Bolt and Base Plate
-
3.1 General Requirement
-
3.2 Equipment Foundation
-
3.3 Anchor Bolts
-
3.4 Base Plate
-
4 Equipment and Material Approach
-
4.1 General Requirement
-
4.2 Equipment
-
4.3 Material
-
5 Feeding and Ore Drawing Equipment
-
5.1 General Requirement
-
5.2 Installation of Tramcar Dumper
-
5.3 Installation of Plate-Type Feeder
-
5.4 Installation of Electromagnetic Vibration Feeder
-
5.5 Installation of Disk Feeder
-
5.6 Installation of Chute Feeder
-
5.7 Installation of Chain And Pendulum Feeders
-
5.8 Installation of Ore Drawing Gate
-
5.9 Test Run of Feeding and Ore Drawing Equipment
-
6 Crushing,Grinding and Sieving Equipment
-
6.1 General Requirement
-
6.2 Installation of Jaw Crusher
-
6.3 Installation of Cycle Crusher
-
6.4 Installation of Taper Crusher
-
6.5 Installation of Ore Mill
-
6.6 Installation of Vibration Sieve
-
6.7 Test Run of Crushing,Grinding and Sieving Equipment
-
7 Classifying and Sorting Equipment
-
7.1 General Requirement
-
7.2 Installation of Spiral Classifier
-
7.3 Installation of Hydrocyclone
-
7.4 Installation of Fine Sieve
-
7.5 Installation of Barrel-Type Magnetic Separator
-
7.6 Installation of Turn Cage Magnetic Separator
-
7.7 Installation of Ring-Type Magnetic Separator
-
7.8 Installation of Magnetic Dewatering Tank
-
7.9 Installation of Flotator
-
7.10 Installation of Jigger
-
7.11 Installation of Swing Bed
-
7.12 Installation of Centrifugal Concentrator
-
7.13 Installation of Heavy-Medium Vibratory Chute
-
7.14 Installation of Spiral Concentrator
-
7.15 Test Run of Classifying and Sorting Equipment
-
8 Dewatering Equipment
-
8.1 General Requirement
-
8.2 Installation of Center Drive-Type Concentrator
-
8.3 Installation of Circum Drive-Type Concentrator
-
8.4 Installation of Feeding Chute Frame of Concentrator
-
8.5 Installation of Tube Internal Filtering Vacuum Filter
-
8.6 Installation of External Filtering Vacuum Filter
-
8.7 Test Run of Dewatering Equipment
-
Appendix A Quality Acceptance Record Table for Constituent Works of Mineral Processing Equipment Installation
-
Appendix B Quality Acceptance Record Table for Divisional Works of Mineral Processing Equipment Installation
-
Appendix C Quality Acceptance Record Table for MineralProcessing Equipment Installation Works
-
Appendix D Mineral Processing Equipment No-Load Test Run Record Table
-
Appendix E Appearance Quality Acceptance Record for Unit Works
-
Explanation of Wording in This Code