GB 50825-2013钢铁厂加热炉工程质量验收规范:英文

Code for Quality Acceptance of Reheating Furnaces in Iron and Steel Works

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
  • 公告
收起

标准信息

  • 【主编部门】
    China Metallurgical Construction Association
  • 【批准部门】

    Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • 【发布单位】

    Ministry;of;Housing;and;Urban-Rural;Development;of;the;People's;Republic;of;China;General;Administration;of;Quality;Supervision,Inspection;and;Quarantine;of;the;Pepublic;of;China

  • 【主编单位】

    Capital;Engineering;and;Research;Incorporation;Limited

  • 【参编单位】

    CISDI;Engineering;Co.;,LTD.;WISDRI;Engineering;and;Research;Incorporation;Limited;Huatian;Engineering;and;Technology;Corporation;Beijing;Shougang;Construction;Group;Co.;,Ltd.;China;First;Metallurgical;Construction;Group;Corporation;Ltd;Ansteel;Construction;Group;Co.;Ltd;Yangzhou;Leader;Engineering;Technologies;Co.;Ltd.

  • 【主要起草人】

    Hu;Wenchao;Xu;Chungang;Fu;Yongtao;Li;Jing;Jiang;Anjia;Wang;Lihong;Yang;Santang;Liang;Wei;Guo;Guangming;Huo;Hang;Yan;Yunfu;Luo;Jianming;Xu;Shaochun;Wei;Zeen;Ye;Chenglong;Wang;Jing;Jia;Ding;Song;Ping;Han;Youling;Lu;Dacheng;Gong;Jinguo;Tian;Xuebin;Yang;Jianxin;Wu;Zhenhai;Zou;Shounan

收起

中文目录

  • Announcement of Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • Foreword

  • 1 General Provisions

  • 2 Terms

  • 3 Basic Requirements

  • 4 Furnace Non-standard Equipment

    • 4.1 General Requirements

    • 4.2 Walking Type Mechanical Equipment

    • 4.3 Rotary Hearth Equipment

    • 4.4 Bottom Car

    • 4.5 Furnace Door and Door Driving Mechanism

    • 4.6 Rack Type Pusher,Charging Machine and Extractor

    • 4.7 Cantilever Roller

    • 4.8 Supporting and Skid System

    • 4.9 Burner

    • 4.10 Regenerative Combustion Equipment

  • 5 Steel Structure

    • 5.1 General Requirements

    • 5.2 Materials

    • 5.3 Welding

    • 5.4 Fastener Connection

    • 5.5 Assembling

    • 5.6 Erecting

    • 5.7 Paining

  • 6 Refractory Construction

    • 6.1 General Requirements

    • 6.2 Refractory

    • 6.3 Furnace Lining

    • 6.4 Flue Lining

    • 6.5 Duct Lining

  • 7 Piping of Combustion,Compressed Air and Cooling Water Systems

    • 7.1 General Requirements

    • 7.2 Acceptance of Equipment and Materials

    • 7.3 Piping Installation

    • 7.4 Acceptance of Piping System

  • 8 Evaporative Cooling System

    • 8.1 General Requirements

    • 8.2 Acceptance of Equipment

    • 8.3 Piping and Accessories

    • 8.4 Piping Pressure Test

  • 9 Hydraulic and Lubrication System

    • 9.1 General Requirements

    • 9.2 Installation of Equipment and Parts

    • 9.3 Preparation and Welding of Piping

    • 9.4 Installation of Piping

    • 9.5 Pickling,Flushing,Purging and Painting of Piping

    • 9.6 Pressure Test and Commissioning of System

  • 10 Electric Automation

    • 10.1 General Requirements

    • 10.2 Acceptance before Installation

    • 10.3 Erection Acceptance

    • 10.4 Commission Acceptance

    • 10.5 Function Acceptance of Electric Automation

    • 10.6 Acceptance of Documents

  • 11 Final Acceptance Test

    • 11.1 General Requirements

    • 11.2 Slab Disalignment in Walking Beam Furnace

    • 11.3 Disalignment of Rotary Hearth Furnace

    • 11.4 Surface Temperature of Furnace Casing

    • 11.5 Noise

    • 11.6 Qualified Rate

  • 12 Safety and Environmental Protection

    • 12.1 Safety

    • 12.2 Environmental Protection

  • Appendix A Formulas of Degreasing,Pickling,Neutralizing and Passivating

  • Appendix B Cleanliness Class of Pipe Flushing

  • Explanation of Wording in This Code

  • List of Quoted Standards