首页 >标准规范

电力建设施工技术规范 第3部分:汽轮发电机组

Technical Specification for Thermal Power Erection and Construction Part 3:Turbine Generator Unit

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
收起

标准信息

  • 【发布单位】

    National;Energy;Administration;of;the;People's;Republic;of;China

  • 【主编单位】

    Jiangsu;Electric;Power;Construction;No.3;Engineering;Company

  • 【参编单位】

    Tianjin;Electric;Power;Construction;Company,;Hebei;Electric;Power;Construction;No.1;Engineering;Company,;Anhui;Electric;Power;Construction;No.2;Engineering;Company,;Henan;No.1;Thermal;Power;Construction;Company;and;Beijing;Electric;Power;Construction;Company.

  • 【主要起草人】

    Zhao;Zhuren;Xu;Yunquan;Yu;Xiaoming;Hao;Qingfeng;Zhang;Qingnian;Liang;Hao;Xie;yonghui;Zhang;Xuefeng;Wang;Zhiyong

  • 【主要审查人】

    Fan;Youlin;Cui;Yukui;Yan;Zizheng;Wei;Min;Zhou;Liang;Lu;Huanhao;Yang;Shunhu;Yu;Haimiao;Wang;Zuo;Qian;Ping;Lv;Yanfu;Lu;Xinhuai;Wang;Jiayong;Han;Chengwei;Wang;Yanyun;Shi;Ying;Liu;Chunxiao;Shen;Chun;Hua;Zemin;Ling;Hejin;Ma;Xiaozhen;Wang;Hanhong;Chen;Zhanhong;Ding;Lianhe;Li;Ning

收起

中文目录

  • Foreword

  • 1 General Provisions

  • 2 Terminology

  • 3 Basic Requirements

    • 3.1 Equipment Unpacking Inspection and Storage

    • 3.2 Civil Works

    • 3.3 Equipment and System Erection

  • 4 Steam Turbine Proper

    • 4.1 General Provisions

    • 4.2 Turbine Proper Foundation

    • 4.3 Soleplates and Pad Blocks

    • 4.4 Casing,Bearing Pedestals and Sliding Pin System

    • 4.5 Bearing and Oil Baffle

    • 4.6 Steam Turbine Rotor

    • 4.7 Installation of Equipment in Flow Passage

    • 4.8 Turning Gear and Speed Reducer

    • 4.9 Cylinder Covering

    • 4.10 Secondary Grouting and Curing

    • 4.11 Documentation for Quality Acceptance

  • 5 Generator and Excitation Device

    • 5.1 General Provisions

    • 5.2 Bearing Pedestals and Bearing

    • 5.3 Stator

    • 5.4 Generator Rotor

    • 5.5 Stator Position Adjustment and Cover Closing

    • 5.6 Shaft Sealing and Gas Cooling System of Hydrogen-cooled and Water-hydrogen-hydrogen-cooled Generator

    • 5.7 Water Inlet/Outlet Support and Cooler

    • 5.8 Cooling Water System

    • 5.9 Excitation Device

    • 5.10 Documentation for Quality Acceptance

  • 6 Regulation and Protection Device and Oil System

    • 6.1 General Provisions

    • 6.2 Electro-hydraulic Regulation and Protection Device

    • 6.3 Hydraulic Regulation and Protection Device

    • 6.4 Steam Valve and Its Driving Device

    • 6.5 Centrifugal Main Oil Pump

    • 6.6 Control Oil System

    • 6.7 Lubricating Oil System

    • 6.8 Sealing Oil System of Hydrogen-cooled Generator

    • 6.9 Documentation for Quality Acceptance

  • 7 Piping of Steam Turbine

    • 7.1 General Provisions

    • 7.2 Valves and Special Parts

    • 7.3 Installation of Piping

    • 7.4 Documentation for Quality Acceptance

  • 8 Auxiliary Equipment

    • 8.1 General Provisions

    • 8.2 Condenser

    • 8.3 Air Cooling Device

    • 8.4 Extraction Equipment

    • 8.5 Heat Exchanger

    • 8.6 Tanks and Deaerator

    • 8.7 Temperature and Pressure Reducer

    • 8.8 Documentation for Quality Acceptance

  • 9 Accessory Machinery

    • 9.1 General Provisions

    • 9.2 Installation of Accessory Machinery

    • 9.3 Common Centrifugal Pumps

    • 9.4 Feed Water Pump Units and Their Associated Devices

    • 9.5 Vertical Pumps

    • 9.6 Deep Well Pumps

    • 9.7 Air Cooling and Water Cooling Fans

    • 9.8 Rotating Filter

    • 9.9 Documentation for Quality Acceptance

  • 10 Bridge Crane,Casing in Insulation and Enclosure

    • 10.1 Bridge Crane

    • 10.2 Insulation and Painting of Steam Turbine Equipments

    • 10.3 Enclosure,Platform,Ladder and Cover of Steam Turbine

    • 10.4 Documentation for Quality Acceptance

  • 11 Regulation,Start-up and Trial Run of Turbo-generator

    • 11.1 General Provisions

    • 11.2 Trial Run of Accessory Machinery

    • 11.3 Purging and Flushing of Steam-water Pipelines

    • 11.4 Leakage Check of Steam Turbine Vacuum System

    • 11.5 Trial Run of Steam Turbine Auxiliary Equipment

    • 11.6 Trial Run of Oil System and Oil Flushing

    • 11.7 General Provisions for Entire System Start-up and Trial Run

    • 11.8 Adjustment and Testing of the Control System and Automatic Protective Devices Prior to Start-up of Steam Turbine

    • 11.9 Start-up and No-load Trial Run of Turbo-generators

    • 11.10 Hydrogen Filling of Generator and Operation of Hydrogen System

    • 11.11 Trial Run of Dual Internal Water Cooled Generator and Water-hydrogen-hydrogen-cooled Generator

    • 11.12 Hot Flushing of Air Cooling System

    • 11.13 Trial Run of Turbo-generator with Load

    • 11.14 Documentation for Quality Acceptance

  • Appendix A Requirements for Construction of Mortar and Pads for S/T Soleplate

  • Appendix B Mix Proportion for Cylinder Coating

  • Appendix C Common Sealing Material Types and Scope of Application

  • Appendix D Common Grease Types and Scope of Application

  • Appendix E Physical Performance of Common S/T Bolting Materials

  • Appendix F Sag Calculation Formula for Centering with Steel Wire

  • Appendix G Standard for Leakage Test of Generator Hydrogen System

  • Appendix H Unit Vibration Criterion

  • Appendix J Oil Quality Rating Criterion

  • Explanation of Wording in This Specification

  • List of Quoted Standards

收起

英文目录

收起

本书术语

术语 英文名称 术语 英文名称

确定

功能项目 注册用户 普通会员 高级会员/企业版
计划版标准阅读 仅限国标条文 库内全部标准 库内全部标准
标准关联查询
强制性条文聚合
标准资源对比
术语查询
知识库管理
服务资讯查看
原版标准阅读
条文说明阅读
标准文字复制(200字/次) 100次/月 不限
标准追踪
行业定制
实用表格下载(仅PC端)
电子书与视频
专家解读视频 免费视频 免费视频 全部视频