首页 >标准规范

GB 50967-2014焦化机械设备安装规范:英文

Code for Installation of Coking and Chemical Mechanical Equipment

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
  • 公告
收起

标准信息

  • 【主编部门】
    China Metallurgical Construction Association
  • 【批准部门】

    Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • 【发布单位】

    Ministry;of;Housing;and;Urban-Rural;Development;of;the;People's;Republic;of;China;General;Administration;of;Quality;Supervision,Inspection;and;Quarantine;of;the;Pepublic;of;China

  • 【主编单位】

    China;MCC5;Group;Co.;,Ltd

  • 【参编单位】

    MCC;TianGong;Group;Corporation;Limited

  • 【主要起草人】

    Yan;Jue;Wang;Yongchuan;Chen;Heping;Guo;Kuixiang;Zhong;Ming;ShangXiumin;Zhou;Qing

收起

中文目录

  • Announcement of the Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • Foreword

  • 1 General Provisions

  • 2 Basic Regulation

  • 3 Equipment Foundation,Anchor Bolts and Shim Plates

    • 3.1 Equipment Foundation

    • 3.2 Datum Line and Datum Mark for Installation of Equipment

    • 3.3 Anchor Bolts

    • 3.4 Shim Plates

  • 4 Equipment and Material

    • 4.1 Equipment

    • 4.2 Material

  • 5 Material Stacker and Reclaimer

    • 5.1 General Requirement

    • 5.2 Installation of Walking Structure

    • 5.3 Installation of Reversible Device

    • 5.4 Installation of Cable Drum

    • 5.5 Installation of Belt Conveyor,Balance Weight,Anchorage Locker

  • 6 Protective Iron Parts and Operating Platform of Coke Oven

    • 6.1 General Requirement

    • 6.2 Installation of Buckstays

    • 6.3 Installation of Small Buckstays

    • 6.4 Installation of Protective Plates

    • 6.5 Installation of Oven Port Frames and Nog Plates

    • 6.6 Installation of Oven Ports

    • 6.7 Installation of Longitudinal and Lateral Bracings

    • 6.8 Installation of Platforms on the Coke Pusher Side and Coke Guide Side

  • 7 Heating and Exchange Device under the Coke Oven

    • 7.1 Installation of Gas Main Pipelines,Branch Pipeline and Downspout s

    • 7.2 Installation of Regulating Cock,Exchange Cock and Orifice Plate Box

    • 7.3 Installation of Waste Gas Exchange Shutter

    • 7.4 Installation of Gas Exchanger

    • 7.5 Installation of Exchange Driving Structure

    • 7.6 Installation of Stack Gate Valve

  • 8 Equipment on the Top of Coke Oven

    • 8.1 Installation of Gas Headers and Liquid Ammonia Pipes

    • 8.2 Installation of Risers and Crossover Mains

    • 8.3 Installation of Guide Pipes for Coke Guide and Coal Charging Dedusting

  • 9 Auxiliary Equipment of Coke Oven

    • 9.1 Installation of Test Equipment for Oven Port Repair Station,Coke Pushing Ram and Coal Leveling Bar

    • 9.2 Installation of Collecting Plates of Wet Quenching Tower

    • 9.3 Installation of Coal Feeding Device of Coal Tower

    • 9.4 Installation of Scale for Coal Charger of Coal Tower

    • 9.5 Installation of Rails of Coke Pusher,Coal Charger and Coke Car

    • 9.6 Installation of Rails of Coke Guide

  • 10 Coke Pusher

    • 10.1 General Requirement

    • 10.2 Installation of Walking Structure

    • 10.3 Installation of Steel Structure

    • 10.4 Installation of Coke Pushing Device

    • 10.5 Installation of Port Extracting Device

    • 10.6 Installation of Cleaning Device of Oven Port Frames

    • 10.7 Installation of Cleaning Device of Oven Ports

    • 10.8 Installation of Coal Leveling Device

    • 10.9 Installation of Cleaning Device of Small Oven Ports

  • 11 Coke Guide

    • 11.1 General Requirement

    • 11.2 Installation of Walking Structure

    • 11.3 Installation of Steel Structure

    • 11.4 Installation of Coke Guide Grill

    • 11.5 Installation of Port Extracting Device

    • 11.6 Installation of Cleaning Device of Oven Port Frames

    • 11.7 Installation of Cleaning Device of Oven Ports

    • 11.8 Installation of Coke Guide Dedusting Device

  • 12 Coal Charger

    • 12.1 General Requirement

    • 12.2 Installation of Walking Device

    • 12.3 Installation of Steel Structure

    • 12.4 Installation of Coal Hopper

    • 12.5 Installation of Coal Feeding Device

    • 12.6 Installation of Cover Extracting Device

    • 12.7 Installation of Shutters of Covers of Liquid Ammonia Exchange and Risers

    • 12.8 Installation of Dedusting Device of Coal Charger

  • 13 Coke Car,Electric Locomotive and Coke Tank Car

    • 13.1 Installation of Coke Car

    • 13.2 Installation of Electric Locomotive

    • 13.3 Installation of Coke Tank Car

  • 14 Process Steel Structure and Rails of Coke Dry Quench

    • 14.1 General Requirement

    • 14.2 Installation of Quenching Channel Steel Structure

    • 14.3 Installation of Rails of Lifting Device

    • 14.4 Installation of Guide Rails of Lifting Headframe

    • 14.5 Installation of Rails of Maintenance Cranes

    • 14.6 Installation of Cable Guide Frame of Lifting Device

  • 15 Quenching Tank of COQ

    • 15.1 Installation of Shell Body of Quenching Tank

    • 15.2 Installation of Air Supply Device

  • 16 Mechanical Equipment for Charging and Discharging System of COQ

    • 16.1 Installation of Transverse Tracting Device

    • 16.2 Installation of Lifting Device

    • 16.3 Installation of Charging Device

    • 16.4 Installation of Discharging Device

    • 16.5 Installation of Automatic Para-position Device

  • 17 Mechanical Equipment of Gas Circulating System of COQ

    • 17.1 General Requirement

    • 17.2 Installation of Primary Deduster

    • 17.3 Installation of Secondary Deduster

    • 17.4 Installation of Water Feeding Pre-heater

  • 18 Auxiliary Equipment of COQ

    • 18.1 General Requirement

    • 18.2 Installation of Elevator Shaft

    • 18.3 Installation of Demineralized Water Tank

  • 19 Equipment of Gas Purification and Chemical Recovery

    • 19.1 General Requirement

    • 19.2 Assembly of Tower Equipment

    • 19.3 Site Welding of Tower Equipment

    • 19.4 Installation of Tower Equipment

    • 19.5 Installation of Parts of Tower Equipment

    • 19.6 Assembly of Vessel Equipment

    • 19.7 Site Welding of Vessel Equipment

    • 19.8 Installation of Vessel Equipment

    • 19.9 Installation of Tank Equipment

    • 19.10 Welding of Tank Equipment

    • 19.11 Installation of Heat-exchange Equipment

    • 19.12 Installation of Mechanical Sedimentation Tank

    • 19.13 Iinstallation of Centrifugal Separator

    • 19.14 Installation of Gas Primary and Final Cooler

    • 19.15 Installation of Electrical Tar Skimmer

    • 19.16 Installation of Saturator

    • 19.17 Installation of Pipe-type Heating Furnace

    • 19.18 Installation of Rotary Drum Crystallizer

    • 19.19 Installation of Naphthalene Refiner

    • 19.20 Installation of Material Charger

    • 19.21 Installation of Quantitative Barrel Filler

    • 19.22 Installation of Pelleter

  • 20 Test-run of Mechanical Equipment of Coking &Chemical and Thermal-state Operation of Coke Oven

    • 20.1 General Requirement

    • 20.2 Test-run of Material Stacker and Reclaimer

    • 20.3 Test-run of Mechanial Equipment of Coke Oven

    • 20.4 Test-run of Moving Mechanical Equipment

    • 20.5 Test-run of Dry Quenching Unit

    • 20.6 Test-run of Gas Purification and Chemical Recovery Unit

    • 20.7 Thermal-state Operation of Coke Oven

  • Explanation of Wording in This Code

收起

英文目录

收起

公告

收起

本书术语

术语 英文名称 术语 英文名称

确定