首页 >标准规范

GB 50742-2012炼钢机械设备安装规范:英文

Code for Installation of Steel-making Mechanical Equipment

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
收起

标准信息

  • 【主编部门】
    China Metallurgical Construction Association
  • 【批准部门】

    Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • 【发布单位】

    Ministry;of;Housing;and;Urban-Rural;Development;of;the;People's;Republic;of;China;General;Administration;of;Quality;Supervision,Inspection;and;Quarantine;of;the;Pepublic;of;China

  • 【主编单位】

    China;First;Metallurgical;Group;Co.;,Ltd.

  • 【参编单位】

    MCC;TianGong;Group;Corporation;Limited;China;MCC20;Group;Corp.;,Ltd.

  • 【主要起草人】

    Zou;Yichang;Ai;Qingzhu;Liu;Yiming;Xiao;Liwen;Zhang;Li;Luo;Jin;Cai;Xiaobo;Li;Shaoxiang;Zheng;Guoqiang;Jing;Dewei;Min;Li

  • 【主要审查人】

    Yu;Huachun;Guo;Qijiao;Zhang;Yongxin;Li;Xin;Yan;Yu;Zheng;Yongheng;Wu;Mingfu;Li;Changliang;Lu;Fuli;Zhao;Cong;Sun;Qing

收起

中文目录

  • Announcement of the Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • Foreword

  • 1 General Provisions

  • 2 Basic Requirements

  • 3 Equipment Foundation,Foundation Bolt and Base Plate

    • 3.1 Hand-over and Acceptance of Equipment Foundation

    • 3.2 Base Line and Base Mark for Equipment Installation

    • 3.3 Foundation Bolt

    • 3.4 Base Plate

  • 4 Equipment and Material Mobilization

    • 4.1 Equipment Mobilization

    • 4.2 Material Mobilization

  • 5 Converter Installation

    • 5.1 Trunnion Bearing Pedestal and Trunnion Bearing

    • 5.2 Backing Ring

    • 5.3 Furnace Body

    • 5.4 Tilting Device

    • 5.5 Removable Guard Board and Fixed Guard Board

  • 6 Installation of Oxygen Lance and Sublance

    • 6.1 Oxygen Lance

    • 6.2 Sublance

    • 6.3 Nitrogen Sealing Device

    • 6.4 Probe Mounting Machine and Pulling Machine for Sublance

  • 7 Installation of Hood

    • 7.1 Skirt of Hood

    • 7.2 Removable Hood

  • 8 Installation of Waste Heat Boiler

    • 8.1 General Requirements

    • 8.2 Flue

    • 8.3 Boiler Barrel

    • 8.4 Piping for Steam and Water Systems

    • 8.5 Heat Accumulator

    • 8.6 Deoxidization Water Tank

  • 9 Installation of Electric Arc Furnace

    • 9.1 Rail Chair

    • 9.2 Tilting Device

    • 9.3 Tilting Locking Device

    • 9.4 Cradle

    • 9.5 Furnace Body

    • 9.6 Furnace Cover,Electrode Rotating Mechanism and Furnace Cover Lifting Mechanism

    • 9.7 Electrode Lifting Mechanism and Electrode Clamping Mechanism

    • 9.8 Oxygen Lance

  • 10 Installation of Ladle Refining Furnace

    • 10.1 Track for Buggy Ladle

    • 10.2 Buggy Ladle

    • 10.3 Furnace Cover Cradle,Furnace Cover and Furnace Cover Lifting Mechanism

    • 10.4 Electrode Lifting Mechanism and Electrode Clamping Mechanism

  • 11 Installation of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter

    • 11.1 General Requirements

    • 11.2 Vacuum Tank

    • 11.3 Vacuum Tank Cap and Tank Cap Lifting Mechanism

    • 11.4 Vacuum Device

    • 11.5 Oxygen Lance

  • 12 Installation of Recirculation Vacuum Degassing Refining Furnace

    • 12.1 General Requirements

    • 12.2 Vacuum Degassing Chamber Car and Degassing Chamber

    • 12.3 Ladle Lifting Device

    • 12.4 Preheating Device for Vacuum Degassing Chamber

    • 12.5 Oxygen Lance

  • 13 Installation of Casting Equipment

    • 13.1 Ladle Turret

    • 13.2 Tundish Car and Track

    • 13.3 Roaster

  • 14 Installation of Continuous Steel-casting Equipment

    • 14.1 Mold and Vibrating Device

    • 14.2 Secondary Cooling Device

    • 14.3 Exchange Device for Segment

    • 14.4 Withdrawal and Straightening Unit

    • 14.5 Dummy Bar Receiving and Sending Device and Dummy Bar Disconnecting Device

    • 14.6 Flame Cutting Machine

    • 14.7 Rocking Shear

    • 14.8 Crop Collecting Device

    • 14.9 Burring Machine

  • 15 Installation of Discharging and Finishing Equipment

    • 15.1 Run-out Roller Table

    • 15.2 Turntable

    • 15.3 Pusher,Puller and Tilter

    • 15.4 Scarfer

    • 15.5 Lifting Guard Board and Marking Punch

    • 15.6 Cross Travelling Trolley

    • 15.7 Centering Device

  • 16 Installation of Hot Metal Mixer

    • 16.1 Base and Roller

    • 16.2 Furnace Shell

    • 16.3 Tilting Device

    • 16.4 Cover Manipulator

  • 17 Installation of Hot Metal Pretreatment Equipment

    • 17.1 Desulfurizer(Dephosphorizer)Conveying Device

    • 17.2 Stirring Desulfurization Equipment

    • 17.3 Injection Dephosphorization Equipment

    • 17.4 Molten Iron Tank Car and Track

    • 17.5 Slag Remover

  • 18 Test Run of Steel-making Mechanical Equipment

    • 18.1 General Requirements

    • 18.2 Test Run of Converter

    • 18.3 Test Run of Oxygen Lance and Sublance

    • 18.4 Test Run of Hood

    • 18.5 Test Run of Waste Heat Boiler System

    • 18.6 Test Run of Electric Arc Furnace

    • 18.7 Test Run of Ladle Refining Furnace

    • 18.8 Test Run of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter

    • 18.9 Test Run of Recirculation Vacuum Degassing Refining Furnace

    • 18.10 Test Run of Casting Equipment

    • 18.11 Test Run of Continuous Steel-casting Equipment

    • 18.12 Test Run of Discharging and Finishing Equipment

    • 18.13 Test Run of Hot Metal Mixer

    • 18.14 Test Run of Hot Metal Pretreatment Equipment

  • 19 Safety and Environmental Protection

  • Explanation of Wording in This Code

  • Normative Standard

收起

英文目录

收起

本书术语

术语 英文名称 术语 英文名称

确定

功能项目 注册用户 普通会员 高级会员/企业版
计划版标准阅读 仅限国标条文 库内全部标准 库内全部标准
标准关联查询
强制性条文聚合
标准资源对比
术语查询
知识库管理
服务资讯查看
原版标准阅读
条文说明阅读
标准文字复制(200字/次) 100次/月 不限
标准追踪
行业定制
实用表格下载(仅PC端)
电子书与视频
专家解读视频 免费视频 免费视频 全部视频