首页 >标准规范

GB 51171-2016通信线路工程验收规范 英文:

CodeforAcceptanceofTelecommunication CableLineEngineering

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
收起

标准信息

  • 【主编部门】
    The Ministry of Industry and Information Technology of the People's Republic of China
  • 【批准部门】

    The Ministry of Housing and Urban-Rural Development of the Peoples Republic of China

  • 【发布单位】

    Ministry of Housing and Urban-Rural Development of the Pelpel's Republic of China;General Administration of Quality Supervision,Inspection and Quarantine of the People's Republic of China

  • 【主编单位】

    China International Telecommunication Construction Corporation

  • 【参编单位】

    hanghai Posts and Telecommunications Designing Consulting Institute Co.,Ltd.;China Petroleum Pipeline Engineering Corporation;Shanghai Engineering Bureau GroupCo.,Ltd.of CRSC

  • 【主要起草人】

    Liu Tianming;Cui Jianqiao;Pan Chao;Zu Ping;Zhang Yi;Li Dan;Han Yanling;Lin Jianmin;Wu Wanhong;Liu Guizhi;Feng Yanyuan

收起

中文目录

  • Foreward

  • 1 General Provisions

  • 2 Terms

  • 3 Material Test

    • 3.1 General Requirements

    • 3.2 Single-drum Optical Fiber Cable Examination

    • 3.3 Single-drum Cable Examination

    • 3.4 Wire Pole Examination

    • 3.5 Examination of Silicon-core Pipe and Accessories

    • 3.6 Examination of Stranded Galvanized Steel Wire and Ironware

    • 3.7 Joint Box and Splice Jacket Examination

    • 3.8 Connector Examination

    • 3.9 Distribution Frame Examination

    • 3.10 Distribution Cabinet Examination

    • 3.11 Examination on Microduct,Microduct Bundle,Microduct Cable and Microduct Accessories

    • 3.12 Other Cable Line Material Examination

  • 4 Cable Route

  • 5 Earth Works

    • 5.1 Excavation

    • 5.2 Backfilling

  • 6 Overhead Pole Line for Overhead Cable

    • 6.1 Pole Erecting

    • 6.2 Pole Extension

    • 6.3 Pole Footing

    • 6.4 Stay Wire

    • 6.5 Bracing Pole

    • 6.6 Pole Numbering

    • 6.7 Overhead Suspension Wire

  • 7 Laying of Optical(Electrical)Cables

    • 7.1 General Requirements

    • 7.2 Laying of Directly-buried Optical(Electrical)Cables

    • 7.3 Installation of Overhead Optical(Electrical)Cables

    • 7.4 Installation of Wall-mounted Optical(Electrical)Cables

    • 7.5 Laying of Duct Optical(Electrical)Cables

    • 7.6 Laying of Underwater Optical(Electrical)Cables

    • 7.7 Leading-up of Optical(Electrical)Cables

    • 7.8 Laying of Micro Duct and Micro Cable

    • 7.9 Laying and Installation of Silicon-cored Plastic Duct

    • 7.10 Manhole(Handhole)Construction of Silicon-cored Plastic Pipe

  • 8 Cable Line Protection and Preservation

    • 8.1 Built-in Pipe,Brick-Paving,Cover-board,and Cement Mortar Bag

    • 8.2 Terrace Slope Reinforcement and Protection

    • 8.3 Protection of Underwater Optical(Electrical)Cable

    • 8.4 Protection of Pole Line,Stay Wire,Suspension Wire and Overhead Line

    • 8.5 Protection of Silicon-cored Pipe

    • 8.6 Stone Marker and Sign Board

    • 8.7 Protection against High Power

    • 8.8 Lightning Protection

    • 8.9 Other Protection Requirements

  • 9 Optical(Electrical)Cable Cross Connection Box and Distribution Device

    • 9.1 Installationof Optical(Electrical)Cable Cross Connection Box

    • 9.2 Installation of Distribution Device

  • 10 Optical(Electrical)Cable Splicing

    • 10.1 General Requirement

    • 10.2 Optical Cable Splicing and Encapsulation

    • 10.3 Splicing and Encapsulation of Electrical Cable

  • 11 Optical(Electrical)Cable Lead-in and Termination

    • 11.1 Installation of Optical(Electrical)Cable in the Equipment Room

    • 11.2 Installation of Optical Cable Termination

    • 11.3 Installation of Electrical Cable Termination

  • 12 Optical(Electrical)Cable Test

    • 12.1 Optical Cable Test

    • 12.2 Electrical Cable Test

  • 13 Preparation of As-built Documentation

  • 14 Final Acceptance of Work

    • 14.1 Follow-up Test

    • 14.2 Preliminary Acceptance

    • 14.3 Trial-run

    • 14.4 Final Acceptance

  • Appendix A Single-drum and Whole-process Test Parameters for Copper-cored Plastic Cables

  • Appendix B Requirements for Earthing Resistance of Lightning Wire and Length of Extension Line(Underground Part)

  • Appendix C Requirements for Earthing Resistance of Optical(Electrical)Cable Suspension Wires and Other Facilities

  • AppendixD Original Erection Sag for Suspension Wire of Overhead Optical (Electrical)Cable

  • Appendix E Test Record for Repeater Section of Optical Cable Line

  • Appendix F Permissible Reduction Value of Air Plug Pressure

  • Appendix G Permissible Air Pressure Reduction of Plastic Cable in 24h

  • Explanation of Wording in This Code

  • List of Quoted Standards

收起

英文目录

收起

本书术语

术语 英文名称 术语 英文名称

确定

功能项目 注册用户 普通会员 高级会员/企业版
计划版标准阅读 仅限国标条文 库内全部标准 库内全部标准
标准关联查询
强制性条文聚合
标准资源对比
术语查询
知识库管理
服务资讯查看
原版标准阅读
条文说明阅读
标准文字复制(200字/次) 100次/月 不限
标准追踪
行业定制
实用表格下载(仅PC端)
电子书与视频
专家解读视频 免费视频 免费视频 全部视频