首页 >标准规范

DL/T 5231-2010±800KV及以下直流输电接地极施工及验收规程:英文

Specification for construction and acceptance of earth electrode in ± 800kV and below DC transmission

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
收起

标准信息

  • 【发布单位】

    Issued;by;the;National;Energy;Administration;of;the;People's;Republic;of;China

收起

中文目录

  • Forewords

  • 1 Scope

  • 2 Normative References

  • 3 Terms

  • 4 General Provisions

  • 5 Inspection of Materials and Apparatus

  • 6 Measurement

  • 7 Earth-Rock Works

    • 7.1 Excavation of Electrode Trough

    • 7.2 Excavation of cable manholes,seepage wells and inspection wells

    • 7.3 Excavation of directly buried cable troughs

    • 7.4 Backfilling

  • 8 Welding Works of Earth Electrodes

    • 8.1 General Provisions

    • 8.2 Welding Materials

    • 8.3 Arc welding procedure

  • 9 Cadweld Works of Earth Electrodes

    • 9.1 General Provisions

    • 9.2 Preparation for Construction

    • 9.3 Construction Process

    • 9.4 Inspection Method

  • 10 Laying of Carbon Beds

  • 11 Construction and Installation of Cable Manholes,Seepage Wells and Inspection Wells

  • 12 Acceptance,Test and Hand-over of Works

    • 12.1 Acceptance of works

    • 12.2 Completion Test

    • 12.3 Delivery of Documents

    • 12.4 Hand-over of Works

收起

英文目录

收起

本书术语

术语 英文名称 术语 英文名称

确定

功能项目 注册用户 普通会员 高级会员/企业版
计划版标准阅读 仅限国标条文 库内全部标准 库内全部标准
标准关联查询
强制性条文聚合
标准资源对比
术语查询
知识库管理
服务资讯查看
原版标准阅读
条文说明阅读
标准文字复制(200字/次) 100次/月 不限
标准追踪
行业定制
实用表格下载(仅PC端)
电子书与视频
专家解读视频 免费视频 免费视频 全部视频