首页 >标准规范

2022

Code for engineering geological investigation of water resources and hydropower

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
  • 公告
收起

标准信息

  • 【主编部门】
    中华人民共和国水利部
  • 【批准部门】

  • 【发布单位】

  • 【主编单位】

  • 【参编单位】

    西

  • 【主要起草人】

    耀

  • 【主要审查人】

    寿

收起

中文目录

  •   

  • 1   

  • 2 

    • 2.1   

    • 2.2   

  • 3 

  • 4 

    • 4.1 

    • 4.2 

    • 4.3   

    • 4.4   

    • 4.5 

    • 4.6 

    • 4.7 

    • 4.8 

    • 4.9 

    • 4.10 

  • 5 

    • 5.1 

    • 5.2 

    • 5.3   

    • 5.4   

    • 5.5 线

    • 5.6 

    • 5.7 

    • 5.8 

    • 5.9 

    • 5.10 

    • 5.11 

    • 5.12 

    • 5.13 

    • 5.14 

    • 5.15 

  • 6 

    • 6.1 

    • 6.2   

    • 6.3 

    • 6.4 

    • 6.5 

    • 6.6 

    • 6.7 

    • 6.8 

    • 6.9   

    • 6.10 

    • 6.11 

    • 6.12 

    • 6.13 

    • 6.14 

    • 6.15 

    • 6.16 

    • 6.17 

    • 6.18 

    • 6.19 

    • 6.20 

    • 6.21 

  • 7 

    • 7.1 

    • 7.2 

    • 7.3 

  • 8 

    • 8.1 

    • 8.2 

    • 8.3 

    • 8.4 

  • 9 

    • 9.1 

    • 9.2 

    • 9.3 

    • 9.4 

    • 9.5 

  • A 

  • B 

  • C 

    • C.1 

    • C.2 

    • C.3 

  • D 

  • E 

  • F 

  • G 

  • H 

  • J 

  • K 

  • L 

  • M 

  • N 

  • P 

  • Q 

  • R 

    • R.1   

    • R.2   

    • R.3 

    • R.4 

    • R.5 

    • R.6 

    • R.7   

    • R.8 

  • S 

  • T 湿湿

  • U 

  • V 

  • W 

  • Y 

  • Z 

收起

英文目录

  • 1 General provisions

  • 2 Terms and symbols

    • 2.1 Terms

    • 2.2 Symbols

  • 3 Basic requirements

  • 4 Planning study

    • 4.1 General requirements

    • 4.2 Regional geology and seismicity

    • 4.3 Reservoir

    • 4.4 Dam site

    • 4.5 Water diversion project

    • 4.6 Flood control and drainage works

    • 4.7 Irrigation area

    • 4.8 River regulation works

    • 4.9 Sources of construction materials

    • 4.10 Reporting

  • 5 Feasibility study

    • 5.1 General requirements

    • 5.2 Regional stability

    • 5.3 Reservoir

    • 5.4 Dam site

    • 5.5 Headrace route and powerhouse area

    • 5.6 Spillway

    • 5.7 Canal route and canal structure sites

    • 5.8 Sluice or pump station

    • 5.9 Long and deep tunnel

    • 5.10 Embankment and flood storage/diversion works

    • 5.11 Irrigation area

    • 5.12 River regulation works

    • 5.13 Site selection for resettlement

    • 5.14 Sources of construction materials

    • 5.15 Reporting

  • 6 Preliminary design study

    • 6.1 General requirements

    • 6.2 Reservoir

    • 6.3 Earth-rock dam

    • 6.4 Concrete gravity dam

    • 6.5 Concrete arch dam

    • 6.6 Spillway

    • 6.7 Surface power house

    • 6.8 Underground powerhouse

    • 6.9 Tunnel

    • 6.10 Diversion channel and cofferdam

    • 6.11 Navigation structure

    • 6.12 Slope

    • 6.13 Canal and canal structures

    • 6.14 Sluice or pump station

    • 6.15 Long and deep tunnel

    • 6.16 Embankment

    • 6.17 Irrigation area

    • 6.18 River regulation works

    • 6.19 Resettlement site

    • 6.20 Sources of construction materials

    • 6.21 Reporting

  • 7 Tender design study

    • 7.1 General requirements

    • 7.2 Review and additional investigation

    • 7.3 Reporting

  • 8 Detail construction drawing design study

    • 8.1 General requirements

    • 8.2 Follow-up investigation

    • 8.3 Construction activity

    • 8.4 Reporting

  • 9 Rehabilitation project of defective reservoir

    • 9.1 General requirements

    • 9.2 Safety evaluation study

    • 9.3 Feasibility study

    • 9.4 Preliminary design study

    • 9.5 Reporting

  • Appendix A Attachments of geotechnical and geological report

  • Appendix B Summary of geophysical exploration applications

  • Appendix C Assessment of leakage in karst area

  • Appendix D Assessment of immersion

  • Appendix E Selection of geotechnical parameters

  • Appendix F Rating of soil and rock permeability and classification of permeability structures

  • Appendix G Criteria for recognition of soil seepage deformation

  • Appendix H Weathering degree of rock

  • Appendix J Unloading degree of slope rock

  • Appendix K Technical provisions for slope stability analysis

  • Appendix L Assessment of water corrosivity

  • Appendix M Technical provisions for sampling and in-situ testing of thick river deposits of sandgravels and boulders

  • Appendix N Classification of tunnelling rock mass

  • Appendix P Determination of soil liquefaction potential

  • Appendix Q Identification of rock burst

  • Appendix R Investigation of special soils

  • Appendix S Identification of expensive soils

  • Appendix T Determination of collapsibility and initial collapse pressure of loess

  • Appendix U Classification of rock mass structure

  • Appendix V Classification of foundation rock mass

  • Appendix W Reduction factor of external water pressure

  • Appendix Y Methods for estimating leakage loss of canal

  • Appendix Z Assessment of leakage in non-karst area

  • Explanation of wording in this cocle

  • List of quoted standards

收起

公告

<div><h2></h2><div class="text-info">4-40-00</div><div class="align-center"><span class="bold">2023 3</span></div><div class="align-center"></div><div><a data-linktoid="GB 50487-2008">GB 50487-2008</a>202351</div><div>www.mohurd.gov.cn</div><div class="align-right"><span class="bold"></span></div><div class="align-right"><span class="bold">202315</span></div></div>
收起

本书术语

术语 英文名称 术语 英文名称
active fault reservoir leakage
reservoir immersion reservoir bank caving
reservoir induced earthquake engineering geological investigation for resettlement sites
thick overburden unloading deformation
permeability rate seepage stability

确定