首页 >标准规范

DL 5190.2-2012电力建设施工技术规范.第2部分,锅炉机组:英文

Technical Specification for Thermal Power Erection and Construction Part 2:Boiler Unit

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
  • 公告
收起

标准信息

  • 【发布单位】

    Issued;by;the;National;Energy;Administration;of;the;People's;Republic;of;China

收起

中文目录

  • Foreword

  • 1 General Provisions

  • 2 Terms

  • 3 Basic Provisions

    • 3.1 General Provisions

    • 3.2 The Interface Between Erection and Buildings

  • 4 Steel Structures and Metal Parts

    • 4.1 General Provisions

    • 4.2 Boiler Foundation Inspection,Lineation and Pad Iron Erection

    • 4.3 Boiler Steel Structures Erection and Secondary Grouting

    • 4.4 Manholes,Observation Holes and Boiler Setting Parts

    • 4.5 Boiler Sealing Elements

    • 4.6 Combustion Equipment

    • 4.7 Air Heater

    • 4.8 Inspection and Documentation

  • 5 Heating Surface

    • 5.1 General Provisions

    • 5.2 Steam Drum,Steam-water Separator and Header

    • 5.3 Waterwalls

    • 5.4 Superheater,Reheater,Economizer and Desuperheater

    • 5.5 Boiler Water Circulating Pump and Start-up Pump

    • 5.6 Circulating Fluidized Bed Boiler Heating Surface Equipment

    • 5.7 Hydrostatic Test

    • 5.8 Inspection and Documentation

  • 6 Boiler Attached Pipes and Accessories

    • 6.1 General Provisions

    • 6.2 Boiler Blowdown,Sampling,Heating,Drain and Discharge,Vent and Desuperheating Pipes

    • 6.3 Start-up System

    • 6.4 Water Level Indicator for Steam Drum

    • 6.5 Safety Valves

    • 6.6 Soot Blowing System

    • 6.7 Inspection and Documentation

  • 7 Flue Gas/Air Ducts,Fuel/Bulk Material Pipes and Auxiliary Equipment

    • 7.1 General Provisions

    • 7.2 Assembly and Erection of Flue Gas/Air Ducts and Fuel/Bulk Material Pipes

    • 7.3 Accessories and Devices of Flue Gas/Air Ducts,Fuel/Bulk Material Pipes

    • 7.4 Leak Test for Furnace and Flue Gas System

    • 7.5 Dust Precipitators

    • 7.6 Inspection and Documentation

  • 8 Desulfurization and Denitrification

    • 8.1 General Provisions

    • 8.2 Flue Gas Desulfurization

    • 8.3 Flue Gas Denitrification

    • 8.4 Inspection and Documentation

  • 9 Equipment and Pipes of Fuel Oil System

    • 9.1 General Provisions

    • 9.2 The Oil Unloading Device and Pipes

    • 9.3 Oil Tank and Accessories

    • 9.4 Oil Supply Equipment and Pump Room Pipes

    • 9.5 Plant Fuel Pipes

    • 9.6 Boiler Room Fuel Pipes

    • 9.7 Blowing and Oil-passing Test of Fuel Oil System

    • 9.8 Required Conditions Before Receiving Oil for Fuel Oil System

    • 9.9 Inspection and Documentation

  • 10 Boiler Auxiliary Machineries

    • 10.1 General Provisions

    • 10.2 General Rules for the Erection of Auxiliary Machineries

    • 10.3 Oil System of Auxiliary Machinery

    • 10.4 Coal Mills

    • 10.5 Fans

    • 10.6 Coal Feeder

    • 10.7 Air Compressor

    • 10.8 Ash Handling Equipment

    • 10.9 Slag Dragging Machine

    • 10.10 Slag Crusher

    • 10.11 Bucket Chain Conveyor

    • 10.12 Chain Bucket Elevator

    • 10.13 Equipment of Bottom Ash Cooler

    • 10.14 Inspection and Documentation

  • 11 Coal Handling Equipment

    • 11.1 General Provisions

    • 11.2 Rubber Belt Coal Conveyor

    • 11.3 Coal Unloader for the Rubber Belt Coal Conveyer

    • 11.4 Magnetic Separator

    • 11.5 Coal Crusher

    • 11.6 Coal Screening Machine

    • 11.7 Unloading Equipment and Coal Yard Equipment

    • 11.8 Inspection and Documentation

  • 12 Boiler Setting and Insulation & Corrosion Protection of Thermal Equipment and Pipes

    • 12.1 General Provisions

    • 12.2 The Refractory and Insulation Materials

    • 12.3 Unshaped Abrasion Resistant Refractory Materials Construction

    • 12.4 Furnace Lining Construction

    • 12.5 Insulation Construction of Boiler Proper,Thermal Equipment and Pipes

    • 12.6 Outer Casing Construction for Boiler Proper,Thermal Equipment and Pipes

    • 12.7 Corrosion Protection

    • 12.8 Seasonal Construction

    • 12.9 Inspection and Documentation

  • 13 Trial Operation and Acceptance of Boiler Unit

    • 13.1 General Provisions

    • 13.2 Main Points for Boiler Trial Operation

    • 13.3 High Temperature Drying-out

    • 13.4 Boiler Chemical Cleaning

    • 13.5 Flushing and Blowing of Pipes

    • 13.6 Steam Leak Test and Safety Valve Adjustment

    • 13.7 Start-up Trial Operation of the Complete Boiler Unit

    • 13.8 Inspection and Documentation

  • Appendix A Urban Refuse Incineration Boiler Erection

    • A.1 General Provisions

    • A.2 Refuse Incineration Boiler Erection

    • A.3 Inspection and Documentation

  • Appendix B Biomass Incineration Boiler Erection

    • B.1 General Provisions

    • B.2 Biomass Incinerator Boiler Erection

    • B.3 Inspection and Documentation

  • Appendix C Gas-turbine Heat Recovery Boiler Erection

    • C.1 General Provisions

    • C.2 Erection of the Framework and Related Metal Structures

    • C.3 Heating Surface Erection

    • C.4 Erection of Flue Gas Ducts

  • Appendix D Manufacture and Assembly Tolerance of Boiler Steel Structure

    • D.1 Material Cutting and Opening Size Deviation

    • D.2 Edge Deviation of Butt Joints

    • D.3 Structural Steel Assemblies

    • D.4 Plate Girder Components

    • D.5 Beams(Not Including Plate Girders)

    • D.6 Columns

    • D.7 Frameworks and Trusses

    • D.8 Platforms and Staircases

    • D.9 Size Deviation Correction

  • Appendix E The Critical Temperature of Common Steels in Thermal Power Erection

  • Appendix F Allowable Deviation of Boiler Foundation Axes and Overall Dimension

  • Appendix G Inspection Items of High Strength Bolt Connection Projects

  • Appendix H Manufacturing and Assembly Tolerance of Tubular Air Heater

    • H.1 The Edge Deviation of Butt Welds

    • H.2 Tube Sheet

    • H.3 Tube Channel

  • Appendix J Allowable Deviations of the Outer Diameter and Wall Thickness of Heating Surface Tubes

  • Appendix K Strength Calculation Requirements of Temporary Tubes and Plugs for Hydrostatic Test

    • K.1 Wall Thickness Calculation

    • K.2 The Maximum Allowable Diameter Calculation

    • K.3 Wall Thickness Calculation of Heads and Plugs

  • Appendix L Manufacturing Size Allowable Deviation of Gas(Air)Ducts and Fuel(Material)Pipes

  • Appendix M Inspection Requirements of Filter Bag and Its Theoretical Value of Erection Pre-tention Force

  • Appendix N Allowable Deviation of Large Power Equipment Foundation

  • Appendix P Requirements of Track Laying

  • Appendix Q Paint Color and Marking of Main Equipment and Pipes

  • Explanation of Wording in This Code

  • Referenced Standards

收起

英文目录

收起

公告

收起

本书术语

术语 英文名称 术语 英文名称

确定