首页 >标准规范

Code for design of uranium mining and metallurgy engineering in nuclear industry

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
收起

标准信息

  • 【主编部门】
    中国核工业集团公司
  • 【批准部门】

  • 【发布单位】

  • 【主编单位】

  • 【主要起草人】

  • 【主要审查人】

收起

中文目录

  • 1 

  • 2 

  • 3 

    • 3.1 

    • 3.2 

    • 3.3 

  • 4 

    • 4.1 

    • 4.2 

    • 4.3 

    • 4.4 

    • 4.5 

  • 5 

    • 5.1 

    • 5.2 

    • 5.3 

    • 5.4 

    • 5.5 

    • 5.6 

    • 5.7 

    • 5.8 

    • 5.9 

    • 5.10 

    • 5.11 

    • 5.12 

  • 6 

    • 6.1 

    • 6.2 

    • 6.3 

    • 6.4 

  • 7 

    • 7.1 

    • 7.2 

    • 7.3 

    • 7.4 

    • 7.5 

    • 7.6 

  • 8 

    • 8.1 

    • 8.2 

    • 8.3 

    • 8.4 

    • 8.5 

    • 8.6 

  • 9 

    • 9.1 

    • 9.2 

    • 9.3 

    • 9.4 

    • 9.5 

    • 9.6 

    • 9.7 

    • 9.8 

  • 10 

    • 10.1 

    • 10.2 

    • 10.3 

    • 10.4 

    • 10.5 

    • 10.6 线

    • 10.7 

  • 11 

    • 11.1 

    • 11.2 

    • 11.3 

    • 11.4 

    • 11.5 

    • 11.6 线

  • 12 

    • 12.1 

    • 12.2 

  • 13 

    • 13.1  

    • 13.2 

  • 14 

    • 14.1 

    • 14.2 

  • 15 

    • 15.1 

    • 15.2 

    • 15.3 

    • 15.4 

    • 15.5 

  • 16 

    • 16.1 

    • 16.2 

    • 16.3 

  • 17 

    • 17.1 

    • 17.2  

  • 18 

    • 18.1 

    • 18.2

    • 18.3 

    • 18.2

收起

英文目录

  • 1 General provisions

  • 2 Terms

  • 3 Basic requirement

    • 3.1 Basic principles for design

    • 3.2 Design phasecontent and level

    • 3.3 Construction scale and service life

  • 4 Geologyhydrogeology and geological engineering

    • 4.1 Deposit exploration and geological report

    • 4.2 Resources/reserves evaluation and design utilization

    • 4.3 Additional exploration

    • 4.4 Mine laboratoryradioactory measuring station

    • 4.5 Hydrogeology and geological engineering

  • 5 Mining

    • 5.1 Mine expoitation system

    • 5.2 Developmeng opening

    • 5.3 Mining method

    • 5.4 Ventilation

    • 5.5 Filling system and method

    • 5.6 Mining equipment

    • 5.7 Three grade ores and stope number

    • 5.8 Mining sequence

    • 5.9 Stope leaching

    • 5.10 In situ leaching

    • 5.11 Mineopen-pit and in situ leaching place construction standard for put into operation

    • 5.12 Scheduling

  • 6 SinKing and driving engineering

    • 6.1 Shaf

    • 6.2 Tunnel or incline shaft

    • 6.3 Shaft station and chambers

    • 6.4 Underground detonator storehouse

  • 7 Mining machinery and ground technological facilities

    • 7.1 Hoisting

    • 7.2 Ventilation facilities

    • 7.3 Compressued air installation

    • 7.4 Drainage system

    • 7.5 Ground technological facilities

    • 7.6 Transportation system of lixivium producted by in situ blowing-ore leaching

  • 8 Technology of ore dressing and metallurgy

    • 8.1 Content of test report and technology process

    • 8.2 Production line arrangement

    • 8.3 Industrial technological equipment

    • 8.4 Plant and equipment arrangement

    • 8.5 Heap leaching facilities

    • 8.6 Auxiliary

  • 9 Automatical control

    • 9.1 General provisions

    • 9.2 Automation level

    • 9.3 Selection of automatic instruments and devices

    • 9.4 Control room

    • 9.5 Instrument cabletube and local device layout

    • 9.6 Power source of instrumentation system

    • 9.7 Air supply for instrumentation system

    • 9.8 Instrumentation system grounding

  • 10 Tailings facilities and dry tailings facilities

    • 10.1 General provisions

    • 10.2 Tailings pond and dry tailings pond

    • 10.3 Tailings dam and dry tailings dam

    • 10.4 Flood control of tailings pond and dry tailings pond

    • 10.5 Drainage of tailings pond and dry tailings pond

    • 10.6 Tailings pipelin

    • 10.7 Tailings pumping station

  • 11 General plan and transport

    • 11.1 Site selection

    • 11.2 Overal layout

    • 11.3 General plane arrangement

    • 11.4 Vertical arrangement

    • 11.5 Interneal and external transport

    • 11.6 Pipeline playing

  • 12 Miantenance and repair shop and miantenance and repair shop

    • 12.1 Miantenance and repair shop

    • 12.2 Miantenance and repair shop

  • 13 Electriccl engineering and communication

    • 13.1 Electriccl engineering

    • 13.2 Communication

  • 14 Heatingventilation and air conditioning

    • 14.1 Heating

    • 14.2 Ventilation and air conditioning

  • 15 Water supply and drainage

    • 15.1 Water source selection

    • 15.2 Water consumption norm

    • 15.3 Water distribution system

    • 15.4 External drainage

    • 15.5 Internal water supply and drainage

  • 16 Civil works and architecture

    • 16.1 General provisions

    • 16.2 Main industrial buildings

    • 16.3 Public buildings

  • 17 Fire figthing and energy economizing

    • 17.1 Fire figthing

    • 17.2 Energy economizing

  • 18 Radioprotectionenvironment and health

    • 18.1 Radioprotection

    • 18.2Three wastesmanagement and envionment protection

    • 18.3 Industial safty and occupational health

    • 18.2Three wastesmanagement and envionment protection

  • Explanation of wording in this code

  • List of quoted standards

收起

本书术语

术语 英文名称 术语 英文名称
uranium mining and metallurgy open-pit mining
underground mining solution mining
in situ leaching in situ blowing-ore leaching mining
development preparatory
cutting stoping

确定