首页 >标准规范

GB 50197-2015煤炭工业露天矿设计规范:英文

CODE FOR DESIGN OF OPEN-PIT MINE OF COAL INDUSTRY

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
  • 公告
收起

标准信息

  • 【主编部门】
    China National Coal Construction Association
  • 【批准部门】

    The Ministry of Housing and Urban-Rural Development of the People’s Republic of China

  • 【发布单位】

    Ministry of Housing and Urban-Rural Development of the People’s Republic of China;General Administration of Quality Supervision,Inspection and Quarantine of the Pepublic of China

  • 【主编单位】

    China National Coal Construction Association Survey and Design Committee;CCTEG Shenyang Engineering Company

  • 【参编单位】

    China Coal Xi'an Design Engineering Co. Ltd.;Inner Mongolia Coal Mine Design & Research Institute Limited Liability Company;China University of Mining and Technology;Liaoning Technical University;Dadi Engineering Development Group

  • 【主要起草人】

    MA Peizhong;LI Huizhi;GUO Zhenwen;ZHANG Zhenwen;ZHENG Youyi;CAI Qingxiang;LI Kemin;JI Changsheng;YANG Chaoyang;GAO Yan;LIU Ling;WANG Guangwu;WU Shuncong;LI Jing;SHI Enkui;ZHANG Yulin;LIU Ming;ZHANG Wanhe;DONG Guangzhong;CHANG Fuhua;MA Zhiyuan;YAN Fayao;LIAO Haiying;DONG Wanjiang;WANG Guangrong;YANG Ruzeng;HAN Xuezeng;ZHANG Tiejun;SUN Hongjin;QI Ying

收起

中文目录

  • 中华人民共和国住房和城乡建设部公告

  • Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China

  • Foreword

  • 1 General provisions

  • 2 Basic requirements

    • 2.1 Mining limits

    • 2.2 Resources/reserves

    • 2.3 Designed production capacity

    • 2.4 Mode of development and haulage and mining procedures

  • 3 Mining technology

    • 3.1 General requirements

    • 3.2 Intermittent mining technology

    • 3.3 Continuous mining technology

    • 3.4 Semi-continuous mining technology

    • 3.5 Dragline casting mining technology

    • 3.6 Other mining technology

    • 3.7 Blasting hole drilling and blasting

  • 4 Internal transportation

    • 4.1 General requirements

    • 4.2 Truck haulage

    • 4.3 Belt conveying

    • 4.4 Railroad transportation

  • 5 Dump

    • 5.1 General requirements

    • 5.2 Size of dumping face

    • 5.3 Dumping method and equipment selection

  • 6 Slope stability engineering

  • 7 Groundwater control

    • 7.1 General requirements

    • 7.2 Method of groundwater control

    • 7.3 Hydrogeological calculation

    • 7.4 Equipment and affiliated facilities

    • 7.5 Filter

  • 8 Water prevention and drainage

    • 8.1 Drainage in excavation site

    • 8.2 Surface water prevention and drainage

  • 9 Coal handling system

    • 9.1 Production capacity

    • 9.2 Crushing

    • 9.3 Coal storage

    • 9.4 Loading

  • 10 General layout

    • 10.1 General layout of open-pit mine

    • 10.2 General layout of mine service facilities

    • 10.3 Vertical design and flood control and drainage

    • 10.4 Mine service facilities road

    • 10.5 Compr ehensive layout of pipelines

  • 11 Maintenance of mechanical and electrical equipment

    • 11.1 General requir ements

    • 11.2 Maintenance of mechanical equipment

    • 11.3 Maintenance of electrical equipment

    • 11.4 War ehouses

  • 12 Power supply and distribution

    • 12.1 General requir ements

    • 12.2 Source of power supply

    • 12.3 Selection of voltage,quality of power supply and reactive power compensation

    • 12.4 Power load

    • 12.5 Power distribution on surface

    • 12.6 Power distribution to excavation site and dump

    • 12.7 Power distribution of dewatering and pumping equipment

    • 12.8 Power distribution to production system and affiliated facilities

    • 12.9 Power supply of electric traction

    • 12.10 Over voltage and grounding

  • 13 Information and automation

    • 13.1 General requir ements

    • 13.2 Production monitoring

    • 13.3 Information management

    • 13.4 Communication

    • 13.5 Cable TV system

    • 13.6 Railroad signal

  • 14 Buildings on surface,water supply and drainage

    • 14.1 General requir ements

    • 14.2 Crushing station

    • 14.3 Head station(drive station,transfer station),distributing station

    • 14.4 Trestle or underpass of belt conveyor

    • 14.5 Stockyard of run-of-mine coal

    • 14.6 Administration and public buildings

    • 14.7 Water source

    • 14.8 Water supply

    • 14.9 Fire fighting

    • 14.10 Drainage

    • 14.11 Heating

    • 14.12 Ventilation

    • 14.13 Heat supply

  • 15 Energy conservation,emission-reduction and comprehensive utilization

    • 15.1 General requir ements

    • 15.2 Energy conservation in development and mining

    • 15.3 Energy conservation in power supply and distribution

    • 15.4 Energy conservation in general layout and transportation

    • 15.5 Energy conservation in architecture

    • 15.6 Energy conservation in water supply and drainage and heat supply and ventilation

    • 15.7 Emission reduction and compr ehensive utilization

  • 16 Environment protection

    • 16.1 General requir ements

    • 16.2 Pollution control

    • 16.3 Reclamation and water and soil conser vation

  • Appendix A Classification of resources/reservesof solid mineral

  • Appendix B Indexes for estimation of coal resources

  • Appendix C Classification and calculation of resources/reserves in prefeasibility study,feasibility study and preliminary design

    • C.1 Classification and calculation of resour ces/reser ves in pre-feasibility study based on preliminary exploration geological report

    • C.2 Classification and calculation of resources/reserves in pre-feasibility study based on detailed exploration geological report

    • C.3 Classification and calculation of resources/reserves in feasibility study and preliminary design based on detailed exploration geological report

  • Explanation of wording in thiscode

  • List of quoted standards

收起

英文目录

收起

公告

中华人民共和国住房和城乡建设部公告

4-40-00
2022年 第43号
住房和城乡建设部关于发布《印制电路板工厂设计规范》等5项工程建设标准英文版的公告
该5项工程建设标准英文版由住房和城乡建设部组织中国计划出版社有限公司出版发行。
中华人民共和国住房和城乡建设部
2022年3月28日
收起

本书术语

术语 英文名称 术语 英文名称

确定