首页 >标准规范

GB 51004-2015建筑地基基础工程施工规范:英文

Code for Construction of Building Foundation Engineering

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
  • 公告
收起

标准信息

  • 【主编部门】
    Shanghai Urban-Rural Development and Transportation Commission
  • 【批准部门】

    Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • 【发布单位】

    Ministry of Housing and Urban-Rural Dervelopment of the People's Republic of China;General Administration of Quality Supervision,Inspection and Quarantine of the People'Republic of China

  • 【主编单位】

    Shanghai Construction Group Co.,Ltd.;Shanghai Foundation Engineering Group Co.,Ltd.

  • 【参编单位】

    China Academy of Building Research;Shanghai Construction No.1(Group)Co.,Ltd.;Shanghai Construction No.4(Group)Co.,Ltd.;Shanghai Mechanized Construction Group Co.,Ltd.;Guangdong Foundation Engineering Group Co.,Ltd.;Shanghai Xian Dai Architectural Design(Group)Co.,Ltd.;Shanghai Geotechnical Investigations and Design Institute Co.,Ltd.;Tongji University;Yunnan Construction Engineering Group Corporation;Shaanxi Construction Engineering Group Corporation;Liaoning Construction Engineering Group Co.,Ltd.;Xinjiang Beixin Road and Bridge Construction Co.,Ltd.;Xinjiang Bing Tuan Construction Engineering(Group)Co.,Ltd.

  • 【主要起草人】

    Fan Qingguo Li Yaoliang Yuan Fen Ge Zhaoyuan Gao Wensheng;ZhongXianqi Zhu Yimin Qiu Xihong Zhu Jun Gao Chengyong;Gu Guorong Ye Guanbao Zhu Jianming Wang Weidong Liu Hongming;Gan Yonghui Xu Anjun Xue Yongwu Liu Jiaweng Zhu Jianguo;Wang Lixiang Jiang Xialing Liang Zhirong Xu Feng Liu Shannan;Liang Fayun Li Cunliang Shao Mengxin Teng Xin Luo Xin;Gu Yang Huang Qiuliang Zhang Gang Cheng Hui Ping Yuzhu;Wang Zhimin Chen Heng Wang Jianjiang Zhang Zhijian Fan Jiming;Hua Yan Chen Gang Xiong Baoheng Xing Li Chen Rongkai;Han Zhengping

  • 【主要审查人】

    Ye Keming Zhang Yan Zhong Dongbo Zheng Xiangbin Gu Qianyan;Wu Houxin Xu Guomin Ren Shuhua Ge Wenzhi

收起

中文目录

  • Announcement of the Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • Foreword

  • 1 General Provisions

  • 2 Terms

  • 3 Basic Requirements

  • 4 Ground Construction

    • 4.1 General Requirements

    • 4.2 Cohesive Fill and Lime-soil Fill

    • 4.3 Sand and Gravel Fills

    • 4.4 Flyash Fill

    • 4.5 Dynamic Consolidation

    • 4.6 Grouting

    • 4.7 Preloading

    • 4.8 Vibroflotation

    • 4.9 High Pressure Jet Grouting

    • 4.10 Soil-cement Mixed Pile

    • 4.11 Soil-lime Compacted Columns

    • 4.12 Cement Flyash Gravel Piles

    • 4.13 Tamping Soil-cement Piles

    • 4.14 Stone Columns

    • 4.15 Foundation on Collapsible Loess

    • 4.16 Foundation on Frozen Soil

    • 4.17 Foundation on Expansive Soil

  • 5 Foundation Construction

    • 5.1 General Requirements

    • 5.2 Non-reinforced Spread Foundation

    • 5.3 Reinforced Concrete Spread Foundation

    • 5.4 Raft and Box Foundation

    • 5.5 Precast Reinforced Concrete Pile

    • 5.6 Cast-in-situ Slurry-drilled Pile

    • 5.7 Continuous Flight Auger Cast-in-situ Piles with Pressure Concreting

    • 5.8 Tube-sinking Cast-in-situ Pile

    • 5.9 Cast-in-situ Pile with Dry Method

    • 5.10 Steel Pile

    • 5.11 Jacked Pile by Anchor Reaction

    • 5.12 Foundation on Rock-anchor System

    • 5.13 Sunk Well and Caisson

  • 6 Shoring Construction for Foundation Excavation

    • 6.1 General Requirements

    • 6.2 Contiguous Cast-in-situ Pile Wall

    • 6.3 Sheet Pile Wall

    • 6.4 Secant Pile Wall

    • 6.5 Soil-cement Mixing Wall with Steel Inclusions

    • 6.6 Diaphragm Wall

    • 6.7 Gravity Cement-soil Wall

    • 6.8 Soil Nailing Wall

    • 6.9 Strut

    • 6.10 Rod(Strand)Anchors

    • 6.11 Foundation Pit Support Combined with Main Structure

  • 7 Groundwater Control

    • 7.1 General Requirements

    • 7.2 Drainage Galleries

    • 7.3 Dewatering

    • 7.4 Cut-offs

    • 7.5 Recharge

  • 8 Construction of Earthwork

    • 8.1 General Requirements

    • 8.2 Excavation of Earthwork

    • 8.3 Rock Foundation Excavation

    • 8.4 Stacking and Transportation of Earthwork

    • 8.5 Backfilling

  • 9 Slope Construction

    • 9.1 General Requirements

    • 9.2 Bolt-shotcrete Support

    • 9.3 Retaining Wall

    • 9.4 Slope Excavation

  • 10 Safe and Green Construction

  • Explanation of Wording in This Code

  • List of Quoted Standards

收起

英文目录

收起

公告

收起

本书术语

术语 英文名称 术语 英文名称

确定