首页 >标准规范

大中型火力发电厂设计规范

Code for Design of Fossil Fired Power Plant

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
  • 公告
收起

标准信息

  • 【主编部门】
    China Electricity Council
  • 【批准部门】

    Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • 【发布单位】

    Ministry;of;Housing;and;Urban-Rural;Development;of;the;People's;Republic;of;China;General;A dministration;of;Quality;Supervision,Inspection;and;Quarantine;of;the;People's;Republic;of;China

  • 【主编单位】

    China;Power;Engineering;Consulting;Group

  • 【参编单位】

    Northeast;China;Electric;Power;Design;Institute.;East;China;Electric;Power;Design;Institute;Central;Southern;China;Electric;Power;Design;Institute;Northwest;China;Electric;Power;Design;Institute;Southwest;Electric;Power;Design;Institute;North;China;Power;Engineering;Co.,Ltd.;China;Power;Construction;Engineering;Consulting;Corporation;State;Grid;Corporation;of;China;China;Southern;Power;Grid;Co.,Ltd.;China;Huaneng;Group;China;Datang;Corporation;China;Huadian;Corporation;China;Guodian;Corporation;China;Power;Investment;Corporation;Shenhua;Guohua;Power;Co.,Ltd.

  • 【主要起草人】

    Sun;Rui;Lu;Guodong;Xu;Jigang;Ma;An;An;Yongyao;Yang;Zuhua;Wang;Yuying;Cao;Liping;Chai;Jingyu;Wu;Yiqi;Wang;Hongbin;Long;Hui;Zheng;Huili;Song;Xuankun;Cao;Songtao;Zhou;Jun;Zheng;Huimin;Ge;Simin;Ma;Xinxin;Zhao;Min;Gu;Yueling;Zhou;Mingqing;Xue;Li;Xu;Biao;Chen;Yuhong;Wang;Dun;Huang;Shengrui;Wei;Heng;Zhang;Jianzhong;Xie;Yanbo;Shi;Cheng;Yang;Jianxiang;Dai;Youxin;Deng;Nanwen;Chen;Dezhi;Kang;Hui;Huang;Jianjun;Chao;Hui;Feng;Shuli;Meng;Xiangguo;Zeng;Guangyi;Cui;Zhiqiang;Chen;Yinbiao;Zhong;Ruyao

  • 【主要审查人】

    Tang;Yunlin;Chen;Zumao;Long;Jian;Guo;Yali;Xu;Haiyun;Yan;Xinjun;Yu;Xi;Yuan;Pingfan;Hu;Jun;Xie;Wangdu;Zhou;Xianlin;Song;Hongjun;Liang;Zhihong;Tian;Xiaoqing;Wang;Dongsheng;Wang;Zhonghui;Huang;Baode;Du;Xingyou;Qi;Enlan;Wang;Congsheng;Zhang;Zhengzhi;Li;Shuchen;Yang;Xuzhong;Zhou;Hongguang;Xiao;Yong;Ning;Zhe;Yang;Baohong;Guo;Xiaoke;Zhou;Ziben;Wei;Xinguang;Wei;Xian;an;Sun;Xianchen;Ye;Yongjian;Shen;Bing;Bao;Yiming;Xu;Jianhao;Niu;Bing;Chen;Yinzhou;Zhong;Xiaochun;Yao;Youcheng;Huang;Congxin;Wang;Guoyi;Gao;Yuan;Bai;Rong;Peng;Xiangdong;Huang;Anping;Zeng;Xiaochao;Zhao;Liqiong;Yang;Dong;Li;Yufeng;Ge;Zengmao;Wang;Riyun;Fan;Yongchun;Shen;Yun;Hu;Huaqiang;Wang;Zhibin;Zhang;Nong;Tong;Jianguo;Zhang;Junmin;Tao;Fengchun;Li;Runsen;Qiao;Zhikun;Wang;Wenjie;Qi;Jianguo;Zhong;Weidong

收起

中文目录

  • Announcement of Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • Foreword

  • 1 General

  • 2 Terms

  • 3 Requirements of Electric Power System on Fossil Fired Power Plants

    • 3.1 Basic Requirement

    • 3.2 Technical Requirements on the Connection of Power Plant to the Power System

    • 3.3 Requirements on Operating and Regulating Performance of Generating Units

    • 3.4 Requirements on the Operation Capability of the Units under Abnormal Conditions

  • 4 Overall Planning

    • 4.1 Basic Requirement

    • 4.2 Off-site Planning

    • 4.3 Plant Area Planning and General Layout

  • 5 Unit Type Selection

    • 5.1 Unit Parameters

    • 5.2 Type Selection of Main Equipment

    • 5.3 Capacity Matching between Main Equipment

    • 5.4 Design Performance Indicators of Units

  • 6 General Arrangement of Main Power House

    • 6.1 Basic Requirement

    • 6.2 Arrangement of Turbine House and Deaerator Bay

    • 6.3 Arrangement of Coal Bunker Bay

    • 6.4 Arrangement of Boiler

    • 6.5 Main Control Room and Electronic Equipment Room

    • 6.6 Arrangement of Flue Gas Desulphurization Facilities

    • 6.7 Arrangement of Flue Gas Denitration Facilities

    • 6.8 Maintenance

    • 6.9 Requirements on Comprehensive Facilities

  • 7 Coal Handling System

    • 7.1 Basic Requirement

    • 7.2 Coal Unloading Facilities

    • 7.3 Coal Storage Facilities

    • 7.4 Belt Conveyor

    • 7.5 Screening and Crushing Devices

    • 7.6 Coal Mixing Facilities

    • 7.7 Coal Handling System for Circulating Fluidized Bed (CFB) Boiler

    • 7.8 Limestone Milling System for CFB Boilers

    • 7.9 Auxiliary Coal Handling Facilities

  • 8 Boiler Equipment and System

    • 8.1 Boiler Equipment

    • 8.2 Pulverized Coal Preparation

    • 8.3 Air and Flue Gas System

    • 8.4 Flue Gas Precipitator and Emission System

    • 8.5 Start-up System of Once-Through Boilers

    • 8.6 Ignition and Combustion Supporting Fuel System

    • 8.7 Auxiliary Systems of Boilers

    • 8.8 Startup Boiler

    • 8.9 Circulating Fluidized Bed (CFB) Boilers

  • 9 Ash Handling System

    • 9.1 Basic Requirement

    • 9.2 Bottom Ash Handling System

    • 9.3 Fly Ash Handling System

    • 9.4 Ash Handling System Outside the Power Plant

    • 9.5 Auxiliary Facilities

    • 9.6 Ash Disposal Area

  • 10 Flue Gas Desulphurization System

    • 10.1 Basic Requirement

    • 10.2 Absorbent Preparation System

    • 10.3 Sulfur Dioxide Absorbing System

    • 10.4 Flue Gas System

    • 10.5 Desulphurization by-Product Treatment System

  • 11 Flue Gas Denitration Reaction System

    • 11.1 Basic Requirement

    • 11.2 Reducing Agent Storage and Supply System

    • 11.3 Flue Gas Denitration Reaction System

    • 11.4 Ammonia/Air Mixing and Injecting System

  • 12 Steam Turbine Equipment and Systems

    • 12.1 Steam Turbine Equipment

    • 12.2 Main Steam,Reheat Steam and Bypass System

    • 12.3 Feedwater System

    • 12.4 Deaerator and Feedwater Storage Tank

    • 12.5 Condensate System

    • 12.6 Drainage System

    • 12.7 Cooling Water System of Auxiliary Equipment

    • 12.8 Auxiliary System and Equipment of Cogeneration Units

    • 12.9 Condenser and Its Auxiliary Facilities

  • 13 Water Treatment System

    • 13.1 Water Quality and Water Pretreatment

    • 13.2 Water Pre-desalination

    • 13.3 Boiler Makeup Water Treatment

    • 13.4 Steam Turbine Condensate Polishing

    • 13.5 Cooling Water Treatment

    • 13.6 Chemical Dosing and Water-Steam Sampling for Thermal Process System

    • 13.7 Treatment for Makeup Water of District Heating System and Industrial Return Water

    • 13.8 Wastewater Treatment

    • 13.9 Chemical Storage

  • 14 Information System

    • 14.1 Basic Requirement

    • 14.2 Overall Plan of Plant Information System

    • 14.3 Supervisory Information System for Plant Level

    • 14.4 Management Information Systems

    • 14.5 Price Bidding System

    • 14.6 Video Monitoring System

    • 14.7 Video Meeting System

    • 14.8 Access Guard Management System

    • 14.9 Training Simulator

    • 14.10 Cabling

    • 14.11 Information Security

  • 15 Instrumentation and Control

    • 15.1 Basic Requirement

    • 15.2 Level of Automation

    • 15.3 Control Mode and Control Room

    • 15.4 Measurement and Instruments

    • 15.5 Alarming System

    • 15.6 Protection System

    • 15.7 On-off Control

    • 15.8 Modulating Control

    • 15.9 Unit Control System

    • 15.10 Auxiliary Workshop Control System

    • 15.11 Control Power Supply

    • 15.12 Instrument Tube,Cable,and Arrangement of Local Equipment

  • 16 Electrical Equipment and System

    • 16.1 Generator and Generator Transformer

    • 16.2 Main Electrical Connection

    • 16.3 AC Auxiliary Power System

    • 16.4 DC System and AC Uninterruptible Power Supplies (UPS)

    • 16.5 High Voltage Switchyards

    • 16.6 Electrical Monitoring and Control

    • 16.7 Relay Protection for Components

    • 16.8 Lighting System

    • 16.9 Sizing and Cabling of Cables

    • 16.10 Grounding System

    • 16.11 System Relaying Protection and Security Automatic Equipment

    • 16.12 Dispatching Automation Subsystem

    • 16.13 System Communication

    • 16.14 Inner Communication

    • 16.15 Other Electrical Facilities

  • 17 Hydraulic Facilities and Systems

    • 17.1 Basic Requirement

    • 17.2 Water Source and Water Management

    • 17.3 Cooling Water System

    • 17.4 Water Intake Buildings (Structures)

    • 17.5 Pipeline and Channel

    • 17.6 Wet Cooling Tower

    • 17.7 Water Surface Cooling

    • 17.8 Air Cooling System

    • 17.9 Water Supply and Drainage

  • 18 Auxiliary and Ancillary Facilities

  • 19 Buildings and Structures

    • 19.1 Basic Requirement

    • 19.2 Seismic Resistant Design

    • 19.3 Architectural Design

    • 19.4 Subgrade and Foundation

    • 19.5 Main Power House Structure

    • 19.6 Chimney

    • 19.7 Coal Handling Buildings and Structures

    • 19.8 Hydraulic Buildings and Structures

    • 19.9 Supporting Structure of Air-cooled Condenser

  • 20 Heating,Ventilation and Air Conditioning

    • 20.1 Basic Requirement

    • 20.2 Main Power House

    • 20.3 Electrical Buildings and Electrical Equipment

    • 20.4 Coal Handling Building

    • 20.5 Chemical Building

    • 20.6 Other Auxiliary and Ancillary Buildings

    • 20.7 Refrigerating Station,Heating Station,and Piping Network in the Plant Area

  • 21 Environmental Protection and Soil and Water Conservation

    • 21.1 Basic Requirement

    • 21.2 Prevention and Control of Atmospheric Pollution

    • 21.3 Waste Water and Warm Water Discharge Treatment

    • 21.4 Treatment and Comprehensive Utilization of Ash and Gypsum

    • 21.5 Noise Prevention and Control

    • 21.6 Environmental Protection Monitoring

    • 21.7 Soil and Water Conservation

  • 22 Firefighting and Occupational Safety and Health

    • 22.1 Basic Requirement

    • 22.2 Occupational Safety

    • 22.3 Occupational Health

收起

英文目录

收起

公告

收起

本书术语

术语 英文名称 术语 英文名称

确定