首页 >标准规范

GB 51104-2015取向硅钢生产线设备安装与验收规范:英文

Code for Installation and Acceptance for Engineering Equipment of Grain-Oriented Silicon Steel Production Line

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
  • 英文目录
收起

标准信息

  • 【主编部门】
    China Metallurgical Construction Association
  • 【批准部门】

    Ministry of Housing and Urban-Rural Development of the People s Republic of China

  • 【发布单位】

    Ministry lfHousing and Urban-Rural Dervelopment of the People's Republic of China;General Administration of Quality Supervision,Inspection and Quarantine of the People'Republic of China

  • 【主编单位】

    CHINA MCC5 GROUP CORP. LTD

  • 【参编单位】

    CHINA MCC5 GROUP SHANGHAI CORP. LTD and CHINA MCC20 GROUP;CORP. LTD.

  • 【主要起草人】

    Chen Hongwu;Jin Songsheng;Dai Zhiyi;Xu Liling;Wang Xiang;Zhang Dayong;Li Jianquan;Yuan Xudong;Li Xi;Chen Heping;Lan Jing;Li Zhifen and Wang Hong.

  • 【主要审查人】

    Zhou Qin;Guo Qijiao;Li Changliang;Zheng Yonghong;Pang Zunfu;Yan Jiangsheng;Zhao Cong;Li Jun;Kuang Liyi;Yu Huachun;Yang Tierong;Yan Yu;Zhang Haijun;Xu Jieying

收起

中文目录

  • Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China

  • Foreword

  • 1 General Provisions

  • 2 Basic Requirements

  • 3 Equipment Foundation,Anchor Bolt and Base Plate

    • 3.1 Equipment Foundation Construction

    • 3.2 Inspection and Acceptance of Equipment Foundation

    • 3.3 Erection of Anchor Bolts

    • 3.4 Inspection and Acceptance of Anchor Bolts

    • 3.5 Erection of Base Plates

    • 3.6 Inspection and Acceptance of Base Plates

  • 4 Equipment and Materials Mobilization

    • 4.1 General Requirements

    • 4.2 Inspection and Acceptance of Equipment and Materials

  • 5 Shearing Equipment

    • 5.1 Installation of Notcher

    • 5.2 Inspection and Acceptance of Notcher

    • 5.3 Installation of Disc Shear

    • 5.4 Inspection and Acceptance of Disc Shear

    • 5.5 Installation of Cross-Cut Shear

    • 5.6 Inspection and Acceptance of Cross-Cut Shear

    • 5.7 Test-run of Shearing Equipment

  • 6 Strip Connection Equipment

    • 6.1 Installation of Stitcher

    • 6.2 Inspection and Acceptance of Stitcher

    • 6.3 Installation of Laser Welder

    • 6.4 Inspection and Acceptance of Laser Welder

    • 6.5 Installation of Narrow Lap Welder

    • 6.6 Inspection and Acceptance of Narrow Lap Welder

    • 6.7 Test-run of Strip Connection Equipment

  • 7 Strip Surface Preparation Equipment

    • 7.1 Installation of Shot Blaster

    • 7.2 Inspection and Acceptance of Shot Blaster

    • 7.3 Installation of Roller

    • 7.4 Inspection and Acceptance of Roller

    • 7.5 Installation of Strip Dryer

    • 7.6 Inspection and Acceptance of Strip Dryer

    • 7.7 Installation of Oiler

    • 7.8 Inspection and Acceptance of Oiler

    • 7.9 Installation of Coater

    • 7.10 Inspection and Acceptance of Coater

    • 7.11 Test-run of Strip Surface Preparation Equipment

  • 8 Horizontal Continuous Annealing Furnace

    • 8.1 Erection of Furnace Steel Platform

    • 8.2 Inspection and Acceptance of Furnace Steel Platform

    • 8.3 Erection of Furnace Chamber

    • 8.4 Inspection and Acceptance of Furnace Chamber

    • 8.5 Installation of Furnace Equipment

    • 8.6 Inspection and Acceptance of Furnace Equipment

    • 8.7 Furnace Air Tightness Test

    • 8.8 Test-run of Horizontal Continuous Annealing Furnace

  • 9 Baking Furnace

    • 9.1 Erection of Steel Platform

    • 9.2 Inspection and Acceptance of Baking Furnace Steel Platform

    • 9.3 Erection of Furnace Chamber

    • 9.4 Inspection and Acceptance of Furnace Chamber

    • 9.5 Installation of Furnace Equipment

    • 9.6 Inspection and Acceptance of Furnace Equipment

    • 9.7 Test-run of Baking Furnaces

  • 10 Rotary Annealing Furnace

    • 10.1 Installation of Backup Roller and Guide Rollers

    • 10.2 Inspection and Acceptance of Backup Rollers and Guide Rollers

    • 10.3 Installation of Furnace Steel Structure

    • 10.4 Inspection and Acceptance of Furnace Steel Structure

    • 10.5 Installation of Lower Trolley

    • 10.6 Inspection and Acceptance of Lower Trolley

    • 10.7 Erection of Rotating Steel Platform

    • 10.8 Inspection and Acceptance of Rotating Steel Platform

    • 10.9 Erection of Furnace Shell

    • 10.10 Inspection and Acceptance of Furnace Shell

    • 10.11 Erection of Upper Trolley

    • 10.12 Installation of Furnace Door

    • 10.13 Inspection and Acceptance of Furnace Door

    • 10.14 Test-run of Rotary Annealing Furnace

    • 10.1 Installation of Backup Rollers and Guide Rollers

  • 11 Safety and Environmental Protection

    • 11.1 Safety

    • 11.2 Environmental Protection

  • Appendix A Classification Table of Subproject and Sub-divisional Work for Grain-oriented Silicon Steel Production Line Engineering Equipment Installation

  • Appendix B Quality Acceptance Record for Sub-divisional Work of Grain-Oriented Silicon Steel Production Line Engineering Equipment Installation

  • Appendix C Quality Acceptance Record for Subproject of Grain-Oriented Silicon Steel Production Line Engineering Equipment Installation

  • Appendix D Quality Acceptance Record for Unit Work of Grain-Oriented Silicon Steel Production Line Engineering Equipment Installation

  • Appendix E Non-load Test-run Record for Grain-Oriented Silicon Steel Production Line Engineering Equipment

  • Explanation of Wording in This Code

  • List of Quoted Standards

  • Explanation of Provisions

  • Explanation for Formulation of This Code

  • 7 Strip Surface Treatment Equipment

    • 7.9 Installation of Coater

收起

英文目录

收起

本书术语

术语 英文名称 术语 英文名称

确定

功能项目 注册用户 普通会员 高级会员/企业版
计划版标准阅读 仅限国标条文 库内全部标准 库内全部标准
标准关联查询
强制性条文聚合
标准资源对比
术语查询
知识库管理
服务资讯查看
原版标准阅读
条文说明阅读
标准文字复制(200字/次) 100次/月 不限
标准追踪
行业定制
实用表格下载(仅PC端)
电子书与视频
专家解读视频 免费视频 免费视频 全部视频