首页 >标准规范

DL/T 5232-2010±800KV及以下直流换流站电气装置安装工程施工及验收规程:英文

Specification for Construction and Acceptance of Electric Equipments in ± 800kV and below DC Converter Stations

会员免费阅读,去 购买

  • 标准信息
  • 中文目录
收起

标准信息

  • 【发布单位】

    Issued;by;the;National;Energy;Administration;of;the;People's;Republic;of;China

收起

中文目录

  • Forewords

  • 1 Scope

  • 2 Normative References

  • 3 Terminology

  • 4 General Provisions

  • 5 Thyristor Converter Valves

    • 5.1 General Requirements

    • 5.2 Requirements for Valve Halls

    • 5.3 Installation Apparatuses and Tools

    • 5.4 Inspection and Safekeeping Prior to Installation

    • 5.5 Installation of Converter Valves

    • 5.6 Optical Cable Laying

    • 5.7 Checking and Test

    • 5.8 Hand-over and Acceptance

  • 6 Water Cooling System of Converter Valves

    • 6.1 General Provisions

    • 6.2 Checking and Safekeeping Prior to Installation

    • 6.3 Installation of Internal Water Cooling System

    • 6.4 Installation of External Water Cooling System

    • 6.5 Check and Test

    • 6.6 Handover and Acceptance

  • 7 Converter Transformer and Oil-immersed Smoothing Reactor

    • 7.1 General Requirements

    • 7.2 Loading,Unloading,and Transportation

    • 7.3 Inspection and Storage Prior to Installation

    • 7.4 Nitrogen Discharge and Internal Check

    • 7.5 Installation of the Proper and Accessories

    • 7.6 Vacuum-pumping of the Proper

    • 7.7 Oil Filling under Vacuum

    • 7.8 Hot Oil Circulation

    • 7.9 Overall Airtightness Checking

    • 7.10 Keeping Still and Electrical Tests

    • 7.11 Moving in Place within Station

    • 7.12 Hand-over and Acceptance

  • 8 AC and DC Filters(including AC high-voltage shunt capacitor banks)

    • 8.1 General Requirements

    • 8.2 Foundations,Anchor Bolts,and Suspension Structures

    • 8.3 Check Prior to Installation

    • 8.4 Installation of Capacitor Banks

    • 8.5 Installation of Auxiliary Devices

    • 8.6 Connection and Checking

    • 8.7 Electrical Tests

    • 8.8 Hand-over and Acceptance

  • 9 DC Switchgears

    • 9.1 General Requirements

    • 9.2 Inspection and Safekeeping Prior to Installation

    • 9.3 Installation of Insulation Platform

    • 9.4 Installation of Breakers

    • 9.5 Installation of Auxiliary Devices of DC Switchgear

    • 9.6 Hand-over and Acceptance

  • 10 DC Wall Bushings

    • 10.1 General Provisions

    • 10.2 Inspection and Safekeeping Prior to Installation

    • 10.3 Installation and Test of Bushings

    • 10.4 Hand-over and Acceptance

  • 11 Dry Reactor

    • 11.1 General Requirements

    • 11.2 Foundations and Supports

    • 11.3 Inspection and Safekeeping Prior to Installation

    • 11.4 Installation and Test of Reactors

    • 11.5 Hand-over and Acceptance

  • 12 Air Conditioning and Ventilation System

    • 12.1 General Requirements

    • 12.2 Inspection and Safekeeping Prior to Installation

    • 12.3 Installation of Indoor and Outdoor Air Conditioning Units

    • 12.4 Installation of Ventilation Equipment

    • 12.5 System Commissioning

    • 12.6 Hand-over and Acceptance

  • 13 Fire Protection System

    • 13.1 General Requirements

    • 13.2 Hand-over and Acceptance

  • 14 Voltage and Current Measuring Devices and Surge Arrester

    • 14.1 General Requirements

    • 14.2 Inspection and Safekeeping Prior to Installation

    • 14.3 Foundations and Supports

    • 14.4 Installation and Test of DC Voltage Dividers and DC Current Transducers

    • 14.5 Installation and Test of Capacitor Voltage Transformers

    • 14.6 Installation and Test of Current Transformers

    • 14.7 Installation and Test of Optical Current Transformers

    • 14.8 Installation and Test of AC and DC Surge Arresters

    • 14.9 Hand-over and Acceptance

  • 15 Open Type Breaker,Composite Switchgear,Disconnector,and Grounding Switch

    • 15.1 General Provisions

    • 15.2 Hand-over and Acceptance

  • 16 Gas Insulated Switchgear

    • 16.1 General Provisions

    • 16.2 Hand-over and Acceptance

  • 17 Power Transformer and Oil Immersed High-voltage Shunt Reactor

    • 17.1 General Provisions

    • 17.2 Hand-over and Acceptance

  • 18 Busbars and Connecting Wires

    • 18.1 General Requirements

    • 18.2 Hand-over and Acceptance

  • 19 Installation of Boards and Cabinets,and Secondary Wiring

    • 19.1 General Requirements

    • 19.2 Hand-over and Acceptance

  • 20 Auxiliary Power System of Converter Station

    • 20.1 General Requirements

    • 20.2 Hand-over and Acceptance

  • 21 Communication and Monitoring Equipment

    • 21.1 General Requirements

    • 21.2 Hand-over and Acceptance

  • 22 Outdoor Lighting

    • 22.1 General Requirements

    • 22.2 Hand-over and Acceptance

  • 23 Fire Stopping of Cables

    • 23.1 General Requirements

    • 23.2 Hand-over and Acceptance

  • 24 Lightening Protection and Grounding

    • 24.1 General Requirements

    • 24.2 Hand-over and Acceptance

收起

英文目录

收起

本书术语

术语 英文名称 术语 英文名称

确定

功能项目 注册用户 普通会员 高级会员/企业版
计划版标准阅读 仅限国标条文 库内全部标准 库内全部标准
AI智能检索
标准关联查询
强制性条文聚合
标准资源对比
术语查询
知识库管理
服务资讯查看
原版标准阅读
条文说明阅读
标准文字复制(200字/次) 100次/月 不限
标准追踪
行业定制
实用表格下载(仅PC端)
电子书与视频
专家解读视频 免费视频 免费视频 全部视频
标准查重(审校) 企业版定制
数字阅读终端 企业版定制